![]() |
Quote:
|
Can't wait to hang on the new stretch of riverwalk and watch this rise this summer.
|
Quote:
![]() |
Jan 8
Frames for assembling the rebar cages ? ![]() Spread em ! - these long bars are being fed in by the big crane, 4 at a time, some co-ordination required to get each into the right spot before they are lowered in. ![]() Jan 9 ![]() ![]() ![]() ![]() ![]() |
Bigfoot in disguise?
|
Quote:
|
Got its tower crane stub earlier this afternoon
And I think those frames in the first picture are for a facade mock up |
I know this going a long way back but did they ever release lobby interior pictures? And how many entrances will there be?
|
Quote:
https://www.dnainfo.com/chicago/2016...t-year#slide-6 |
Yellow tower crane base is in place.
|
Quote:
|
|
Boom baby! Lets get ready to rock. and. or. roll. A warm 55 degrees would be a great day to pour today, but I'm not sure if their ready for that yet.
|
Nice! About time for it to join its older yet shorter brother
|
edit: double post
|
Mat(?) pour happening today:
![]() |
Quote:
|
Mocking up
Quote:
![]() ![]() ![]() |
Whoa the white frames look great. I wasn't expecting that and it'll be a really nice contrast to WPW.
|
Jan 12
First mat pour ![]() ![]() at the controls ![]() at the business end ![]() ![]() Sleepers - designed to take strain so lots of steel. ![]() ![]() ![]() |
All times are GMT. The time now is 5:24 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.