Quote:
They will drill holes that are just about touching - filled with concrete and usually an I-Beam - then after those cure come back and drill down betwen each nearly touching hole, fill that with concrete and rebar, and walla - a wall. Same thing that has been done at One Chicago. Some Secant Wall shots from One Chicago, da Spire, 9 W Walton, and OMP |
They're having a 'cerimonial' groundbreaking fro BMO Tower today. Mayor on hand.
|
Quote:
https://i.imgur.com/3w5NZg4.png |
|
i need to get on that deck at some point for THAT view of Sears!
|
So BMO doesn't have the naming rights? Union Station Tower?
|
|
Okay this is a lot more visually interesting now. I like the faceted glass. The original renderings made it seem like it would just be flat glass all the way around.
|
December 23, 2019
|
according to the webcam, there look to be some new pieces of equipment being assembled on site this morning.
possibly caisson rigs? |
Curbed.com has already added this building to their list of high-rises under construction in Chicago:
https://chicago.curbed.com/maps/high...nstruction-map Of course, on SkyscraperPage the designation "under construction" requires caisson drilling, though the Curbed page is nonetheless fairly informative, with a useful interactive map. |
Merry Christmas all! :thrasher:
via https://app.oxblue.com/open/clarkcon...erconstruction https://i.imgur.com/T8cMroe.png |
BMO Tower aka 320 S. Canal received their foundation permit on the 24th
|
Peanut butter jelly time?
|
Quote:
|
Quote:
|
BMO Tower - 310 S Canal
Dec 20
Stuff from the past |
This tower is going to stand out a lot in the Adler “postcard” view. It’s going to sit next to 311 Wacker and be a deep layer behind the Mich ave wall.
Then the Jahn tower and that poster I had from 1998 will be so out of date. |
well now it 100% looks like they're assembling a classic yellow & blue Case caisson rig on-site this morning.
this project will most likely be officially U/C later this week or early next. and that red rig now appears to be driving sheet piling into the ground. |
If you zoom into the SE corner of the site via the webcam, you'll see at least two caisson sleeves in the ground, and the CASE rig actively drilling. This one is about as U/C as it gets. I'll let someone else kick off the dancing. Elaine Benes? Benes...? Benes...?
https://app.oxblue.com/open/clarkcon...erconstruction |