MIAMI | Miami Station | 539 FT | 41 FLOORS
This project called LOGIK was supposed to be a 35 story office/condo development when it started construction in 2008 & then the real estate crash stopped it until now.
http://i.imgur.com/Fei9K9A.jpg The site has been dormant until the All Aboard Florida train station was announced & this site sits across the street from it. http://i.imgur.com/lS9V5fj.jpg http://i.imgur.com/LFHYtfy.jpg Krystal Tower (formerly Logik), plans to launch sales in November and begin construction ‘this winter’. We reported earlier this year that Logik was being relaunched as a residential project, years after an office tower being built on the site halted midway through construction. Brazilian real estate development and construction mogul Rodolfo Ishak is launching a new 35-story, 153-residence condominium known as Krystal Tower in Downtown Miami. Located at 530 NW 1st Court, Krystal Tower is the latest development announced for the area where a transformation to one of the region’s most significant transportation, entertainment, shopping and business hubs is already underway. Krystal Tower will provide a combination of upscale living and luxury amenities with larger floor plans and more attainable pricing than current offerings in Miami’s burgeoning urban core. A collection of 1-bedroom, 1 plus den and 2-bedroom residences averaging 907, 1,050 and 1,330 square feet respectively will be offered from the $200,000’s. One of several projects set to alter the neighborhood landscape, Krystal Tower is conveniently situated adjacent to All Aboard Florida’s proposed Grand Central Station and is mere blocks from Miami Worldcenter’s world-class retail, hotel and convention space, as well as important cultural and entertainment destinations such as Museum Park, the Adrienne Arsht Center for the Performing Arts, Bayfront Park and Amphitheater and American Airlines Arena, among others. One of the best-connected addresses in Miami, Krystal Tower is easily accessible at the junction of Interstate 95 and Interstate 395 and just minutes from the Port of Miami and Miami International Airport. Construction is slated to begin this winter and is scheduled for completion summer 2016. The Krystal Tower sales center is located at 28 West Flagler Street, Suite 330 in downtown Miami and will open November 1. http://www.exmiami.org/index.php/153...n-in-november/ Project Name: Krystal Tower Address: 530 N.W. First Court , Miami, FL. 33015 Height: Unknown Floors: 35 # of Units: 153 Building Type: Residential Developers: Krystal Investment Solution Architects: Glidden Spina + Partners Status: Approved Public Transit: To be served by MetroRail, MetroMover & future AAF Railroad |
MIAMI | Krystal Tower (formerly LOGIK) | 363 FT | 35 FLOORS
Technical Data Quote:
http://www.emporis.com/building/krys...r-miami-fl-usa |
Quote:
http://www.thenextmiami.com/index.ph...on-early-2015/ |
Isn't Krystal a southern fast-food joint? Kind of a weird name for a condo tower.
|
Miami Station Tower Is Replacing Krystal Tower
http://i.imgur.com/IK4zutG.jpg Quote:
NXT |
so will they build and continue on top of the existing structure? or will it have to be demolished?
|
Quote:
It was renamed and the unit type was changed from condos to rentals. |
Delete - nv
|
That is the MiamiCentral Station office building accross the street from Krystal. Krystal is still the same 5 story empty shell it has been for 10 years.
|
Krystal Tower Resubmitted With Office & Residential In 32 Stories
https://i.imgur.com/r2dfL4s.jpg Quote:
NXT |
|
New project on this parcel. Past posts were what it would of been but this parcel has gone though a lot of history. Looks like some actual movement on this Related project.
= = = = = Demolition Permit Issued At Site Where 539-Foot Miami Station Planned https://i.imgur.com/5znv4wk.jpeg https://i.imgur.com/CDr3WRZ.jpeg Quote:
NXT |
Oh my, this is a vast improvement if this is what ends up getting built. Interesting that we don't see any balconies for the residential portion. I wonder if those are on another side not included in these first renderings.
|
Quote:
Doesn't look like they will included. Enclosed. Here's a rendering of the backside. https://i.imgur.com/KCZcF1F.jpeg |
|
|
This site is cursed.
|
Hopefully somebody buys it. The project is shovel ready lol. They just have to clean the dirt and if it rains, remove the water. Yeah this is one of those buyer purchases project, plans in place, and needs someone to restart it.
Yeah the whole city is booming and I agree, cursed site. :haha: |
All times are GMT. The time now is 12:52 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.