![]() |
This weekend I noticed significant interior, and open wall exterior demolition along the southernmost west facing wall of the portion of Luhrs City Center above Bitter & Twisted cocktail bar.
I probably should have taken a picture instead of posting the below as a reference. But the building I'm referencing is the brick building in the below stock image, where the visible demo is to the far right of the hot chick in the Gila River ad along the heavily windowed brick wall. https://images1.loopnet.com/i2/pWGOG...Definition.jpg Does anyone here have any shareable information about what changes may be underway for this building and potential occupancy? |
Could be for the hotel that was announced back in 2020?:shrug:
https://dtphx.org/2020/03/06/histori...upscale-hotel/ |
It's all public record:
DESCRIPTION OF WORK: LURHS HOTEL **CHANGE OF OCCUPANCY FROM B TO R-1 C OF O PERMIT** NEW CANOPY AT EAST ENTRY AND INTERIOR REMODEL FOR MOXY HOTEL WITH 164 GUESTROOMS FROM THE 2ND THRU THE 9TH FLOORS R-1 288 OCCUPANTS, PORTION OF THE 1ST LEVEL AT GROUND FLOOR WILL BE USED FOR LOBBY, LOUNGE, FOOD AND BEVERAGE EXISTING NOT IN SCOPE. NEW LIBRARY AT MEZZANINE A-3 17 OCCUPANTS. RESTROOMS, EXCERCISE ROOMS, OFFICE, LAUNDRY, KITCHEN AT BASEMENT 74 OCCUPANTS. THE EXISTING BUILDING WILL SHARE MECHANICAL ROOMS AT BASEMENT WITH THE EXISITNG RESTAURANT (NOT A PART) AT 1ST FLOOR AND THE EXISITNG OFFICE TENANTS (NOT A PART) AT 10TH FLOOR. NEW ELEVATOR UNDER DIFFERED SUBBMITAL. ******Zoning/HP approved by MJAC (Maura Jackson) #HPCO 2000486****** ***INSPECTIONS TO BE CONDUCTED BY AFP INSPECTORS ONLY*** edit: I edited my post because I didn't realize at first you weren't talking about the white tower which also has demo permits recently issued. |
The redevelopment agreement they had many, many years ago had a bunch of things going on with it but this sounds like they're moving forward on the preservation easement that saves something like the street-facing 25 or 50' of those single story annex buildings and preparing the rear of the site for another tower.
|
Quote:
|
Quote:
|
Quote:
|
Quote:
Building permit issued 1.13.2022 which seems to jive. |
There was a rendering posted some years ago in the Luhrs City Center thread but its gone through a couple iterations of architects, one no longer in business and the other removed it from their page plus it has the taller version of the Marriott (before it got a haircut) on the wrong part of the block. No reason to believe it's remotely current.
|
The hotel in the biomedical campus area at 620 N 6th St appears to have filed some sort of tax appeal that in my mind indicates it's going to be torn down as the new valuation is basically the same as the almost-block sized parking lot kitty-corner to it.
Very, very interesting. |
Quote:
https://skyscraperpage.com/forum/sho...&postcount=381 |
Quote:
|
Grand Ave Redevelopment News
Always figured the Grand Ave revival would happen so much faster but it's been real slow. This is the first development type update that I have heard of in a while.
Looks like The Egyptian Motor Hotel will finally open next month. I follow this food truck as they have got great food. https://www.instagram.com/p/CZuja15v...dium=copy_link Last update I heard was the Sacred Heart Building catching fire back on October 2021 and nothing really else happening w/ this area. However, I have heard great things about Bacanora restaurant (where Barrio Gran Reserva used to be) |
And what do you know...just like that...AZ Big Media has an article about this.. lol
https://azbigmedia.com/lifestyle/his...-grand-avenue/ Quote:
|
|
|
Quote:
But I have to temper my excitement w/ anything involving TNS at this point. Edit: Adding the string lights to existing alleyways is a nice touch :cheers: |
Apartments at Central & Columbus
The onslaught of Midtown multi-family residential continues.
7 floor (5 wood over 2 concrete) 3 phase development proposed in the lot adjacent to the south of the Meridian Bank Tower. Project will be built in 3 phases with the parking garage going up first to accommodate the displaced office parking for the parking lot, with phase 2 fronting Central going up next and then the 3rd phase fronting 2nd Ave. All docs available in my Google Drive: https://drive.google.com/drive/folde...Zx?usp=sharing No renderings yet. But here's the ground level context: https://i.imgur.com/9zAm1Vk.png |
Quote:
|
Quote:
Would love to see some retail in this one, although Centra still hasn’t filled up their spot yet, I’m surprised nothing has gone in there yet. |
All times are GMT. The time now is 4:11 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.