SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Completed Project Threads Archive (https://skyscraperpage.com/forum/forumdisplay.php?f=348)
-   -   CHICAGO | Marriott Marquis McCormick Place | 444' | 40 FLOORS (https://skyscraperpage.com/forum/showthread.php?t=207501)

r18tdi Dec 2, 2014 7:06 AM

This thread is one disappoint followed by another. Make it stop.

harryc Dec 2, 2014 1:04 PM

ABC Demo - Nov 2014
 







this is facing away from the work site, nicely laid for display to the "crowd" for the Rees house move.




brian_b Jan 16, 2015 3:22 PM

Demolition on the hotel block is complete (still some cleanup left). Over on the arena block, the parking structure is about 75% demolished but it doesn't look like they've touched it in a while. However, demolition of the building on the northwest corner of the block is moving along and the Lakeside Bank lot is fenced off and it appears demolition is imminent. That's a bit surprising since the replacement Lakeside Bank structure up at Michigan and 14th is not done - although the exterior is nearly finished and it does look nice.

CHI -21c Jan 17, 2015 8:49 PM

George Lucas, are you listening?

http://farm9.staticflickr.com/8617/1...4ef1c825_b.jpg

rlw777 Apr 7, 2015 2:32 PM

Haven't heard anything about this in a long time anyone made their way down to McCormick land recently know what's happening?

Ned.B Apr 7, 2015 2:51 PM

Quote:

Originally Posted by rlw777 (Post 6980396)
Haven't heard anything about this in a long time anyone made their way down to McCormick land recently know what's happening?

Demo is complete, the ABC building is under abatement. The actual project and new construction is still being developed and detailed by the design/build team, so it will still be several months before there is any major movement on the site.

SamInTheLoop Jun 15, 2015 6:29 PM

Is this one still on-track to begin construction in July? (or has it been pushed back to later summer??)

Skyguy_7 Jun 15, 2015 8:45 PM

I've heard it starts in a matter of weeks. So, yes. They're just dealing with some tricky excavation at the moment.

Chi-Sky21 Jun 16, 2015 2:10 PM

This was being shortened possibly right , do have any final pictures of what it will look like now?

Ned.B Jun 16, 2015 2:52 PM

Quote:

Originally Posted by Chi-Sky21 (Post 7064289)
This was being shortened possibly right , do have any final pictures of what it will look like now?

From the southwest corner it will look identical to the last round of renderings, only shorter. The rooms displaced from the top have been relocated to the center of the block in a new wing, making the building shaped like an L.

Note by shorter, I mean than the original proposal. The project is still the 40 floors listed in the title of this thread. Final height to be a little over 440'

brian_b Jun 18, 2015 5:03 PM

Excavators have been on-site off and on over the past couple of weeks, digging holes and then filling them back in.

chrisvfr800i Jun 19, 2015 12:42 PM

Look for caisson rigs in July....

LouisVanDerWright Jul 10, 2015 1:58 PM

There's some heavy equipment on site. I didn't see any cassion rigs, but there is a giant mobile crane (the kind that needs a separate trailer behind it to carry to boom) on site as of last night. Wonder if that is going to be used to assemble the crawler cranes for cassion rigs? Seems like overkill though, it was an awfully large crane. We'll just have to wait and see what it is for.

marothisu Jul 11, 2015 3:01 PM

Pretty sure it's for this, but there was a new construction building permit issued on Wednesday for a 40 story hotel at 2121 S Prairie (intersection w/Cermak) for the caissons and sheeting.

LouisVanDerWright Jul 11, 2015 5:48 PM

Yup, that's this building. That crane I saw must be for setting up the rigs.

sentinel Jul 11, 2015 6:42 PM

Spyguy, any updated rendering for this? Like, a final final rendering, reflecting the lower height?

Rizzo Jul 12, 2015 8:03 AM

Just noticed when viewing the hotel and stadium site around Cermak that Google updated their aerial photos. It's shows all the sites totally cleared.

The images were taken in late April. You can tell because the NFL draft is happening in grant park.

SamInTheLoop Jul 13, 2015 3:10 PM

Arena Start Too?
 
Just wondering if arena caissons are about to start as well, or is that to lag behind by a month or two??

(Also, just to ask here as the site is almost next door - what about the McHugh hotel - anybody here any news, expected timing, etc on that one?)

LouisVanDerWright Jul 13, 2015 5:46 PM

Just heard some noise on the McHugh project recently. It will have up to 3 different flags. It is moving forward slowly but surely.

brian_b Jul 19, 2015 4:01 AM

In addition to the large crane, there are now two caisson drilling rigs and a small amount of other equipment on site.


All times are GMT. The time now is 2:43 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.