Knowing the history and philosophy of Metra it is way too much to expect them to piggyback on this wave in the next few years. Maybe a 2075 introduction rate if all goes well?
The only silver lining to pin any hopes on perhaps is that the recent new train set contracts are with Alstom? if I remember correctly? Quote:
|
This is not a solution to pin the future on. The German trains are just an experiment, and it could be several decades until the technology is "ready" - that is, commercially viable and low or no emission.
Most hydrogen produced now is "gray" hydrogen that is produced from natural gas and the process emits tons of CO2 into the air, so you've got to deal with all the environmental impacts of fracking and oil spills even if there are no emissions at the point of use. The proposed solution to this is "blue" hydrogen where they just pump the CO2 into the ground instead of the air. Just like the "clean coal" myth. In theory you can produce "green" hydrogen from water via electrolysis, and you can get the electricity from renewable sources like solar or wind, but nobody has figured out how to do this cost-effectively. Compare this to electrification the traditional way, with overhead wires. This is expensive up front, but it relies on mature technology that is 100 years old. And the actual source of energy can be anything, so even if you run it off natural gas or coal power plants initially, it will decarbonize over time as the grid switches over to renewables (or nuclear). In fact Germany is continuing to electrify its busier lines, the only reason hydrogen made sense for this particular line is because it doesn't run frequently enough for electrification to make sense financially. I think the threshold in Europe is usually around 2 trains per direction per hour, so a 30-minute headway is when electrification makes sense. Metra is very close to that threshold. (Germany is also in a pickle because it relies on Russia for most of its oil&gas, so they need a fast way to cut back on their diesel use.) |
That being said, the (sketchy) new proposal for KRM commuter rail up in Wisconsin is proposing to use hydrogen trains. They would probably need to be from Alstom, since nobody else is making them yet.
I'm 95% sure that KRM project will die yet again, but there's a slim chance the Biden administration decides to send them a big check - Dems love to build rail projects in red states, like Obama and all of his streetcar lines. |
The MED has been pretty packed during off-peak this week. Too bad Metra will likely respond by adding more rush hour service
|
FYI:
APTA ridership report for 2nd quarter available, comparing ridership across systems https://www.apta.com/research-techni...ership-report/ |
|
The engineer and the contractor really should be tarred and feathered.
|
Seems like mostly a cosmetic issue, and the complaints are being pushed by people who opposed the flyover in the first place. I don't think there have been any injuries or property damage.
I'm guessing the contractor doesn't know which spots were grouted and which were not, so they are waiting for the spalling to run its course before doing a one-time fix. I am surprised that Walsh/Fluor hasn't put up netting, though. Seems like an simple way to protect against liability. |
Quote:
|
Quote:
I hope they figure out a solution, because there will be roughly 6 miles of similar sound parapet walls yet to be installed on the RPM project. I still think the problem is not safety critical, but I take back what I said about it being "cosmetic". https://www.researchgate.net/publica...nder-shear.png src |
I'm sorry but the engineering here is just so stupid. Why even the need for parapet walls made of concrete...and if were getting right down to it why even the need for parapet walls at all? Sound control? Sound control on the up and over roller coaster but none on either side makes limited sense. And if you are going to have parapets instead of a simple galvanized safety fence why not use a lightweight material that has a straightforward and conventional means of attachment? "Epoxied rods into concrete" just sounds like the title of the case study done before a multi-million dollar redo snafu just a couple years after completion. Oh wait...
|
The sound parapet walls are required mitigation since CTA is adding a new structure (the flyover) that did not exist before. If you look at the Orange Line, you will see similar parapets on the viaducts, although those are more conventional type similar to highway ramps. A better example would be the Belmont and Fullerton stations, which had a mixed steel/concrete parapet wall that seems to be more durable but not as sleek.
CTA is also rebuilding 2 blocks of the Main Line from Belmont to Cornelia and that will get parapets as well, and the new structures from Lawrence-Ardmore too. Epoxy is a common means of attachment these days, it's not exotic. Gets used all the time on Chicago highrises. |
Quote:
Yes I'm quite familiar with the use of epoxy anchorage in construction. My fair suggestion is maybe it wasn't the best application in a situation where 300 tons of steel and load rumbles those connections 100+ times a day. The fact they are failing sort of backs up that concern for me. |
Quote:
|
Quote:
I don't think there is an issue with the use of epoxy here per se, but design factors like the embedment depth, edge distance, etc make the difference between success or failure just as much as the execution does. Not much point in continuing to debate this here on SSP unless more information comes out. |
Via @ChiBuildings on Twitter, it looks like the Damen Green Line station has finally broken ground:
https://pbs.twimg.com/media/FeblFHjW...name=4096x4096 https://pbs.twimg.com/media/FeblFHpX...name=4096x4096 |
Good to see Damen breaking ground. Now they just need to get going on the State/Lake station and we need to push for a Halsted station for the Green/Pink line in Fulton Market. What other lines need new stations?
Any update on whether or not CTA will rehab the Forest Park branch of the blue line? So many of the stations past IMD need desperate rehab. |
Quote:
Not CTA, but Metra Electric could use another stop between 47th and 26th. MD-N and W could use a stop in Humboldt Park and, of course, at Ashland/Ogden. SWS could use one somewhere around Damen or Ashland, but they also need more service. Maybe once they are terminating at Lasalle Street the next project could be adding that station. I’m sure there’s more, but that’s all I got right now. |
Transit construction in this city (country in general sadly) moves at a ridiculously slow pace. Why is the red line expansion not starting now? Why wait till 2025???? Didn't Biden just give cities trillions of dollars for infrastructure? The Damen green infill stop should have been started.
Wish we had leaders that prioritized transit. When Rahm was in office there were tons of transit stuff going on. |
^ Federalism?
Some aspects of our systwm of government is genius but planning and bringing into fruition infrastructure is not one of them. In my opinion the country would be better off if much if not most key infrastructure - including road, rail and transit - was centrally planned and executed from the federal level guided in part by state priorities and insight but also consistent long term national goals and most importantly FUNDING. The system as it currently works leaves much to the states which in many cases don't have the resources, ambition or imagination to plan for such infrastructure and thats not even getting into the lack of cooperation between the states. |