Quote:
|
Quote:
There's a complex process that has to be followed for new projects - they need to be included in CMAP's long-term plan, CTA has to see a need and then order an Alternatives Analysis, etc. And, of course, a major politician probably has to push for it at various points. Other cities have a environment that's easier to navigate for transit planners, but here it's quite difficult (from what I understand). Long Range Plan for CTA Capital Projects (distinct from the short-term plan including the Red/Orange/Yellow extensions and Circle Line Phase II) Circle Line Vision (northern half) BRT-Cicero BRT-Ashland BRT-Western BRT-79th BRT-Clybourn to McCormick Place HRT-Midway to Pink Line HRT-Kimball to Jefferson Park HRT-West Loop (Clinton-Larrabee) Transit to South Works Site |
Quote:
As for through-tracking, there are already two through tracks. During WWII, when long cross-country troop trains were regularly passing through Chicago, there was a scheme to connect tracks 17 & 26 to create an additional through track at the east end. Apparently the original caissons had been placed with that in mind, and I'm guessing 222 South Riverside didn't change that. There's another runthrough track that doesn't have platform access. Also there's a service roadway next to the river that's underused. With a few million dollars of work and a small encroachment on the river channel, I think there's room for a total of four through tracks next to the river. It will be many, many decades before our region needs more capacity than that. |
Quote:
|
Quote:
Quote:
Quote:
|
Quite a bit of work on the UP Westline. Here is an article about it
Metra train station project chugs along in Elmhurst By Annemarie Mannion, TribLocal reporter Improvements to the Union Pacific West rail line and to the Metra station in Elmhurst are slated for completion sometime this fall. The project, which is also being done at 11 others on the line, is intended to improve operations. "It's a project to make the line run more smoothly and efficiently," said Michael Gillis, a Metra spokesman. "There are old signaling systems that need improvement." The work includes adding crossovers, which allow incoming trains to switch tracks if a train is already on the track. "It increases the flexibility when you're running a train," Gillis said. The work includes adding sidewalks to better channel where pedestrians walk. ------------------------------------- I've observed much of this work taking the train everyday. Other work that I've seen includes a pedestrian underpass in Winfield, some new track between Elmhurst and Berkley, in addition to adding and replacing (work still in progress) some small bridges to support 3-tracks (the UP-West Line goes down to two track between River Forest and Elmhurst). It's beautiful to see something get done. For those curious, here are the details of this work: http://metraconnects.metrarail.com/upw.php. |
Union Station Intermodal Center
http://img521.imageshack.us/img521/1...intermodal.jpg This could turn out right, or it could turn out wrong. I'd love it if they built something like Kennedy Plaza in Providence... they do a great job of blending in historic architecture, and reconciling the opposing natures of a public plaza and a bus terminal. |
Quote:
I believe the big Corner Bakery is a tenant of 444, not of Union Station (though Corner Bakery has another outpost down in the food court). Here's a street-level plan I did a few years ago: http://i52.tinypic.com/9vfjab.jpg |
Quote:
Is this supposed to replace the ad-hoc bus berthing along Canal? Do the Greyhound buses stay on Harrison? The best thing would be to rebuild the entire block with a massive multilevel multiuse structure containing a bus terminal, parking and also car rental, and kiss & ride lanes serving Union Station (and the future WLTC). (Come to think of it, is the wait for plans on WLTC what's keeping this block from redevelopment?) |
I think the situation is that CDOT very much wants it and Amtrak very much doesn't (because they don't want to provide facilities for Megabus). Curious things about the rendering above: why no stairways or ramps down to station floor level? The sloping site would seem to allow ingenious ways to get from trains to buses without having to cross Jackson. Why no taxi lane? And what are those LRVs hiding in the shadows next to the parking garage?
|
^^^ Nice catch with the LRVs, perhaps they are trying to represent some future iteration of the Kinze/caroll busway or light rail or something like that?
|
^Yes, it would make sense, but notice that there's no room for passenger loading. They're up against the parking garage wall. I guess the designer is just showing that as possible mid-day storage, and that a real LRT line could be routed through one of the bus lanes.
|
Quote:
Apparently, CDOT commissioned Terry Guen, so this is something approximating the actual planned design. The description also mentions a taxi stand, although it would probably just replace the bus lane on Jackson. |
^ Good sleuthing ardec.
The general idea would be for the 120-series "downtown distributor" buses to use this terminal as their layover/staging spot. I've heard conflicting things about whether intercity buses are a part of the plan, so I'd say that part is still up in the air. If Megabus is willing to pay a curb fee then it seems an ideal opportunity, and the Great Hall could actually function as a waiting area for intercity Megabus travelers (again if Megabus is willing to pay a rental fee for ticketing/information screens inside Union Station). Taxi loading is of course also up in the air. I've still never heard a convincingly good reason why the existing dual taxi ramps accessible directly from the Concourse can't be reopened as part of all this, and sending taxis into the bus terminal would clog it to the point of negating any potential traffic engineering benefit of having the off-street facility. |
Quote:
That is such a great thing lol. I love it. I have saved in my phone the bus stop numbers I take and text the CTA while walking towards the stops. All the time now every time I text to see when the next bus is coming. And it works! It's so simple to use. |
The stickers were ordered last winter but they had to wait for sustained warm weather to put them up, and it takes a while to do 11,577 signs--both sides.
|
Nice figure there... I had no idea how many bus stops were in the city.
I was actually in the early stages of planning a little website with an applet that would automatically generate stickers for any given bus stop in the city, so people could do it guerilla-style. Good to know the CTA already anticipated the need. It would be nice to put the Bus Tracker information not on a sticker on the bus stop sign, but on the inside of the shelter somewhere. Of course, if a stop is busy enough for a shelter, it should probably have a Next Bus LED sign... |
Well I don't care what you think of HSR, pro or con (or maybe just because I'm a little tipsy right now)
but this is BIG news, considering that it's happening in IL first: High-speed rail construction begins September 17, 2010 (AP) — Politicians on Friday cast Illinois as a pioneer for being the first to roll federal stimulus money into a high-speed passenger rail line, claiming that the jobs, tourism and traveler convenience anticipated from the St. Louis-to-Chicago route justifies the $1.1 billion taxpayer tab. http://www.chicagobusiness.com/artic...ruction-begins |
Quote:
|
Quote:
|
All times are GMT. The time now is 12:17 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.