![]() |
:cheers::cheers:
|
I didn't realize- is it being built on a different lot?
|
[QUOTE=NYguy;9191139]It's been in the construction forum for a while now. The building has been under construction a lot longer.
But it's moving along now, and I'm thinking it wasn't that long ago when we were at this stage with Vanderbilt. This construction will go by quickly. So enjoy it while it last! https://a4.pbase.com/o12/06/102706/1...12_InPixio.jpg In the Chicago forum, we consider this the Banana celebration stage. :dancing::banana::dancing::banana::dancing::banana::dancing: :banana::dancing::banana: |
^ Dance on.
Quote:
|
When does the diagram show up in the u/c section?
|
Quote:
Quote:
Quote:
|
And here's the other piece of info that explains it...
https://a4.pbase.com/o12/06/102706/1...QQdqFH3.d1.JPG The base of the structure is what's taking shape now. It will be huge. https://a4.pbase.com/o12/06/102706/1...lCQ7W1.d46.JPG |
|
I must not have been paying attention, so I don't know exactly when this was moved to the U/C thread, but I KNOW y'all were GUNNIN to do it :haha:
|
Emporis also knows that this building is under construction:
https://www.emporis.com/buildings/14...rk-city-ny-usa But CTBUH still does not: https://www.skyscrapercenter.com/bui...quarters/34450 |
I think the CTBUH waits until demo is fully complete. They have classifications for demo, u/c, proposed, vision, complete and on-hold.
|
they're also fumbling around with transferring their database to their main website so I wouldn't be surprised if the data isn't up to date.
|
Quote:
|
Its looking like they will move quick on it too. Almost like a One Vanderbilt type of deal, will rise quick.
|
^ I hope so. It has about the same number of floors, but this is a lot larger building.
Here's another diagram for the fire service elevators that shows a breakdown of floors.... https://a4.pbase.com/o12/06/102706/1...OGANeb8.d7.JPG https://a4.pbase.com/o12/06/102706/1...PegyjH1.d8.JPG https://a4.pbase.com/o12/06/102706/1...yG4NGI0.d9.JPG https://a4.pbase.com/o12/06/102706/1...n8C4hu.d10.JPG https://a4.pbase.com/o12/06/102706/1...w0XZMW.d11.JPG https://www.instagram.com/p/CLVy58wj-6l/ https://scontent-lga3-1.cdninstagram...2e&oe=60595942 https://scontent-lga3-1.cdninstagram...0b&oe=6056F502 https://scontent-lga3-1.cdninstagram...82&oe=605A3F70 https://scontent-lga3-1.cdninstagram...ee&oe=6059BA33 https://scontent-lga3-1.cdninstagram...8c&oe=60581BDF https://scontent-lga3-1.cdninstagram...62&oe=6059867A |
a lot of this already looks pretty far along. they arent going to build past this half of the base until the demo is cleared away, are they? although it would be funny to see half a tower start to go up while the other half comes down.
|
Quote:
https://a4.pbase.com/o12/06/102706/1...QQdqFH3.d1.JPG The timing on this has probably changed. It could be sooner or later. https://a4.pbase.com/o12/06/102706/1...rxn1IY.d10.JPG https://a4.pbase.com/o12/06/102706/1...DoFGRH.d11.JPG |
|
ahh i see — up to six floors on the madison side to be built during demo — very interesting gracias!
|
All times are GMT. The time now is 1:25 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.