![]() |
Quote:
|
I'm confused. Are they tearing down the shopping center that Hula is in, or just the PAD that it's on to put up an apartment. Doesn't seem like enough room, does it?
|
Quote:
|
So, I looked on Maricopa Assessor's page and see that the lot directly behind it is owned by the same Davis Enterprises that owns the shopping center where Hula's is, so it would be a total demolish in my estimation. The back lot has been cleared since this photo was taken.
http://pdf.leeazmail.com/pdfs/Hula.jpg |
Never been to the restaurant, but I worked in that building in 1989 when it was the headquarters for the Valtrans campaign.
|
From the City of Phoenix Public Meeting Results page. Seems Central & Camelback parcel on SW corner will be condos or apartments and a hotel. Should be very dense. Only problem is that they received a delay until 2021. It doesn't mean they can't start sooner, but I hate when developers are given that much leeway. The little parcel that changed hands last week between the LRT and the rest of the corner pushed this project forward apparently.
Application #: ZA-206-17-4 w/ stips Existing Zoning: C-2 (Approved C-2 H-R) Location: Southwest corner of Camelback Road and Central Avenue Quarter Section: 18-27(H8) Proposal: 1) Time extension for ZA-407-11, a request to modify stipulations of approval for a variance to reduce the minimum lot area for each dwelling unit to 125 square feet and 50 square feet for each hotel guestroom. Not less than 450 square feet for each dwelling unit and 200 square feet for each guestroom required. 2) Time extension for ZA-407-11, a request to modify stipulations of approval for a variance to increase the lot coverage to 80%. Maximum 50 percent allowed. 3) Time extension for ZA-407- 11, a request to modify stipulations of approval for a variance to allow up to a 20-foot build-to line along Central Avenue and Camelback Road. Maximum 6-foot build-to required. Approved subject to general conformance to site plan and elevations. 4) Time extension for ZA-407-11, a request to modify stipulations of approval for a variance to reduce the required shading method ratios: 25% structured shading along entire length of building proposed, 50% required; and 25% other methods of shading along entire length of proposed building, 50% required. Approved subject to conditions and general conformance to site plan and elevations. 5) Time extension for ZA-407-11, a request to modify stipulations of approval for a variance to allow a maximum of 150% of the City required parking spaces. Maximum 125% allowed. Approved subject to general conformance to site plan and elevations. 6) Time extension for ZA-407-11, a request to modify stipulations of approval for a variance to reduce the required number of loading berths to 5. Minimum 7 loading berths for up to 490,000 square feet of aggregate floor area plus 1 additional berth for each additional 90,000 square feet of aggregate gross floor area required. Approved subject to conditions and general conformance to site plan and elevations. 7) Time extension for ZA- 407-11, a request to modify stipulations of approval for a variance to reduce minimum building frontage to 45% along Camelback Road and 35% along Central Avenue. Minimum 75% building frontage required. Approved subject to general conformance to site plan and elevations. 8) Time extension for ZA- 407-11, a request to modify stipulations of approval for a variance to allow nonclear windows along the building façade length fronting onto Camelback Road and Central Avenue. Minimum 50% clear windows required. Approved subject to conditions and general conformance to site plan and elevations. 9) Time extension for ZA-407-11. a request to modify stipulations of approval for a variance to not provide a main building entry oriented toward transit platform. Main building entry oriented toward transit platform and/or primary pedestrian access way required. Approved subject to conditions and general conformance to site plan and elevations. Ordinance Sections: 631.B.2.a 631.B.2.e 662.H.1.a 662.H.2.c 662.K.1 702.B.2 662.H.2.a 662.H.2.a 662.H.2.b Applicant: Reid Butler, Cornerstone at Camelback, LLC Representative: Reid Butler, Cornerstone at Camelback, LLC Owner: Cornerstone at Camelback Stipulations: 1) Extended until June 8, 2021. 2) Previous stipulations remain in place: 1) 180 days to apply for building permits. 2) Addition to match design of principle building. 3) Final location of addition to be approved by Zoning Adjustment Hearing Officer. 4) For projection to within 20 feet for up to 1/2 the width of the building. 3) 90 days to present to adjacent Four Corners Neighborhood Associations with site plan for interim beautification plan. 4) One year to complete construction of interim beautification. |
Quote:
|
Quote:
|
Speaking of Lola, we tried Fame last weekend and it was excellent. I highly recommend their brunch if anyone hasn't been and feels like trying something new.
The parking there is atrocious, though. |
Quote:
Marina heights just finished and its been in the works since mid 2011 |
Quote:
Why wouldn't the developer just incorporate the existing retail into the development? There will be a (justified) uproar if they want to demolish a building as cool as Hula's to build another 'Broadstone' box. |
https://www.facebook.com/DowntownVoices/
Came across an interesting development involving a Gateway Community College/ Maricopa CC makespace being developed at 535 W Van Buren. I attached a link which has an in depth description of what is to come. The building itself is in the vicinity of recent renovations (Welnick Market, the Van Buren, etc.), I hope this means we will see a similar restoration. |
Quote:
|
Quote:
They could easily jumpstart a revitalization of that area by expanding Rio Salado, Phoenix College, or building a new, Central Phoenix CC with a focus on technology, sustainability, and the arts: the old Baptist Church used for live performances / exhibits and 1-2 bar/lounges; the Masonic Temple sitting in the center of a 'quad' space repurposed as a public library, bookstore, and restaurant; filling in multiple lots with dense office/education/retail and family-style housing... Yet, the one Phoenix College DT and Rio Salado DT designs make this totally impossible. Maybe it will at least lead to further investment as part of the overall changes with the VB, etc. |
Quote:
|
Quote:
"Why don't completely different entities do something completely different with different funding and for different reasons?" the answer: because that isn't what's happening. |
Quote:
|
This can be interesting. I just received a notice about a hearing tonight that will discuss an amendment change to the dirt lot at NWC of Central and Willetta. This is the dirt lot immediately south of The Old Spaghetti Factory. It's calling for an increased height change of 75' to 250'. Does anyone know anything more?? :tup:
Update: I figured it would be an RAA meeting w/ all the NIMBYs. But it will be the developer actually presenting, I will try and make it and get more info. |
Quote:
I couldn't understand the Circles hysteria because the building was unused and there was a smart project in place - this seems to be the opposite. |
So that shopping center is worth preserving with a few really good places Fame, Hula's, ? and reuse it and somehow expect a developer to incorporate it? How? How would that pan out as an investment? There's plenty of empty retail up and down Central for any of those businesses to relocate to. The empty property behind the center is too small to do anything without the shopping center frontage.
|
All times are GMT. The time now is 2:29 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.