Quote:
|
Quote:
|
^Were I the CM, I'd build the new flat tunnel with southbound platform immediately to the west of the existing line. It would be fairly simple cut-and-cover with plenty of room to work except right next to the existing tunnel wall.
Then cut the Red Line over to the new tracks (one weekend, by running "over the top") and build the northbound platform, mezzanines, exits, etc. |
I was bored and thinking about transit to some of the north branch Amazon sites. Independent of Amzn, I feel this line warrants further study by CTA...and not just because I made this map :). I'm sure many of you have thought of something similar before.
The line could be two-phased to begin, with a hopeful expansion south to complete phase III at a later date. The line would utilize existing rail lines for portions of the route. http://i.imgur.com/axQaZi9.jpg Stops would be at: Phase I Roosevelt/Clinton Harrison/Clinton Jackson/Clinton Madison/Clinton Lake/Clinton Chicago/Larrabee Division/Larrabee North/Clybourn *joins red or brown line to Howard/Kimball Phase II Cortland/Clybourn Fullerton/Ashland Diversey/Ashland Belmont/Lincoln/Ashland Belmont/Western *joins blue line to O'Hare |
|
Cool video...but..the music...wtf? It's not Game of Thrones. Throw some EDM on it...just sayin.
|
^ Right, nor a station overlooking a chasm in rural China. I thought the same thing when I saw it yesterday. Some old-timey talkie music (or EDM) would be more fitting here.
|
The last 45 seconds of that video looked like some of the best CGI ever made. I had to do a double take.
|
Quote:
|
Quote:
|
Quote:
At any other site, $400M could fund a long wishlist of things. At Lincoln Yards, for example, it could fund a new transitway to downtown and a series of new river bridges. |
Quote:
|
Quote:
|
Quote:
|
Transportation news that is worthy to post about: the section of the extended IL-390 roadway is set to open Wednesday between I-290 and Busse Rd., and was kicked off with a 5K and fest over this past weekend. I took a couple of shit-tastic photos (below) before the run that don't show you much, but I saw a couple of great shots on the Tollway's Twitter page.
Looks like 3 lanes in each direction from Lake St. on through to about Wood Dale Rd., then down to 2 lanes EB to 83. WB looks to have 3 lanes all the way down. https://farm5.staticflickr.com/4462/...306cf90e_b.jpg IMG_8050 2 by Brandon DaPrato, on Flickr https://farm5.staticflickr.com/4465/...5183059a_b.jpg IMG_8051 2 by Brandon DaPrato, on Flickr https://farm5.staticflickr.com/4504/...9b21cf74_b.jpg IMG_8052 2 by Brandon DaPrato, on Flickr |
That's great but when do they actually complete it to York Rd ? I looked at the IDOT website and they practically seem to be avoiding any mention of a completion date, and barely mention the existence of that project phase at all. Did they put it on ice until the I-490 legs get a timetable? I imagine the interchange geometry at York could be completely different if I-490 never gets built.
On a related note, does anyone know of a website that has more current aerial photography than Bing or Google maps? Those can do a pretty lousy job at keeping up with urban developments that change much faster than a two or three year cycle, as is the case around O'Hare (not to mention downtown). |
Quote:
The City's Framework Plan included an alignment, but it's super conceptual. It would require General Iron to leave, possibly two new river bridges, a new street to be constructed between Kinzie/Clinton and Chicago/Halsted, etc. Much of it depends on what gets developed and when. Not insurmountable challenges but big ones to be sure. |
Quote:
The stretch between York Rd and 83 is supposedly slated to be finished by the end of 2019. If 490 never gets off the ground, I believe that they will at least build a partial interchange to connect York Rd to 390. There are a lot of contingencies around that last mile past 83 (the western terminal being one, and Canadian Pacific and their ongoing land-use feud/facebattle with the Tollway being the second). In addition, we're now starting to get some details regarding the Tollway's reconstruction of the central Tri-State, so I'm not sure how that'll factor into all of this. |
BRT wouldn't work along the N. Branch. Clybourn is a nightmare north of north and there's only one lane each direction. Orleans is a parking lot during rush hour and one way south of Ontario. All SB buses would have to make their way to Halsted at Division. Wells is awful during the rush. Division is also heavily congested, as is Halsted, which is desolate compared to the surrounding areas, but still manages to have heavy traffic at pretty much all times of the day anyway.
|
Quote:
|
All times are GMT. The time now is 11:45 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.