SAN FRANCISCO | Transbay Block 2 | 181 FT | 17 FLOORS
Quote:
|
The specs:
- Two buildings: one at 181 FT | 17 FLOORS and one at ~85-100 FT | 9 FLOORS - 334 units (183 affordable units at 20-80% of the AMI in the 17-story building and 151 affordable units for seniors in the 9-story building) - 5,080 sq ft for childcare facilities - 4,270 sq ft retail - Parking for 0 cars and 136 bicycles - Notable public transportation: diagonal to the Salesforce Transit Center, two blocks from the Embarcadero BART station, two blocks from the Folsom Muni Metro station |
Quote:
The current site: https://goo.gl/maps/jMexMRYsYSGY3fRU9 https://goo.gl/maps/XCgsPbgVZyYR3P1Z8 https://goo.gl/maps/tprmcjZgHQiQGDHg6 |
This is the park that will go between this and 200 Main Street (Transbay Block 4). Always good to see more public open space added.
Quote:
|
Some more renderings and the layout of the park, as well as the proximity to other parks.
https://sfyimby.com/wp-content/uploa...on-by-OCII.jpg https://sfyimby.com/wp-content/uploa...on-by-OCII.jpg https://sfyimby.com/wp-content/uploa...on-by-OCII.jpg https://sfyimby.com/wp-content/uploa...blic-Works.jpg https://sfyimby.com/2022/10/public-m...francisco.html |
New updated renderings:
Quote:
|
And some more renderings:
https://sfyimby.com/wp-content/uploa...e-Planning.jpg https://sfyimby.com/wp-content/uploa...e-Planning.jpg https://sfyimby.com/wp-content/uploa...e-Planning.jpg https://sfyimby.com/wp-content/uploa...-by-Mithun.jpg https://sfyimby.com/wp-content/uploa...-by-Mithun.jpg https://sfyimby.com/wp-content/uploa...-by-Mithun.jpg https://sfyimby.com/2022/11/new-illu...francisco.html |
Quote:
|
The site work seems to be completed - demolition of the building, concrete removed, trees removed. Several pieces of equipment on property. Anyone have a clue when they’ll start next phase?
|
Based on a city hearing from early Feb and various documents I've found, financing was approved and planned to fully close by February, with construction projected to start shortly after.
I imagine it's contract negotiation and scheduling with various construction partners at this point. [UPDATE:] Kennerly Architecture mentioned on their IG that the groundbreaking is scheduled for May. |
Quote:
|
It's true. I saw a huge drill on site on Saturday, still no activity on the 500+ ft tower though.
|