![]() |
Phoenix | X Phoenix | 320 FT | 25 Floors
Is it time to get this started? :shrug::cheers::)
Phase 2 Construction cam: https://app.oxblue.com/open/clayco/xphoenixph2 Phase 2 Rendering: https://e1.nmcdn.io/clayco/wp-content/up...29-fit:cover/XPhoenix_PhaseII--2000.webp |
Here is the website:
https://xliving.co/communities/x-phoenix/ And the renderings: https://i.imgur.com/6jVVMVbh.jpg https://i.imgur.com/3ikVzJUh.jpg https://i.imgur.com/sadF63bh.jpg |
This is going to be a great one!
Can't believe how far this part of Monroe St has come over the past 6 years. |
|
https://azbigmedia.com/1st-phase-of-x-phoenix-breaks-ground-downtown/
More details on the ground-breaking. I guess this project will be 2-phased. |
So what part of the rendering is included in Phase 1?
|
Quote:
Probably the worst possible sections of the completed project. |
They've added a couple more renderings to UEB's site. The 5th rendering of X Phoenix sure makes it look like X's top level view towers over Wells Fargo and the Phoenix City Hall towers. I know some developers like to exaggerate their renderings, but most of UEB's renderings are usually on par with what the view will actually be. Wondering if there is any potential the 2nd phase of this could have a taller option?
https://ueb.net/projects/G33/G33.html |
Quote:
But I dont think it will tower over Wells fargo |
Turns out the phxrising.city dude snagged the building data from DSD.
https://i1.wp.com/phxrising.city/wp-content/uploads/2019/03/X-Phoenix-Data.jpg They do not have approvals to go over 372'. |
Quote:
So it looks like phase 1 says 239' and phase 2 is 280'. And the site allows up to 540' max. |
Quote:
|
Maybe they decide to sell off the parcel for Phase II and have someone build something taller and slender?
|
So why does the rendering look like both phases are the same height?
|
I hope the surrounding uses get a facelift after the announcement of this project.
|
Quote:
|
Quote:
The AT&T building has so much space surrounding it; I wish there was some kind of incentive for them - and buildings like Dodge Theater - to wrap at least portions with small-scale retail / retail + office / residential walkups. The bankruptcy court is another eyesore, but the parking lot could theoretically be redeveloped into, at least, a mixed use parking garage. The Sun Devil Auto building and the one adjacent to Crescent Ballroom have such great potential for adaptive reuse, with food/bars/retail inside, and patios/food trucks outside. If X Phoenix, despite the god-awful superblock design, contributes an active streetfront along WVB, it would be great to finally see something started in this area to build off Crescent, Welnick, and The VB. |
X (trucks and tractors!) mark the spot
|
Quote:
Edit: also Bonus of dirt moving for Fillmore phase 1 in the top right corner. |
Quote:
|
Quote:
|
Quote:
However I disagree that our blocks in the center of downtown are unusually big. They are quite normal at least right around the core. |
I don't really care how big the block is so long as long as the overall street interaction is good--entrances or breathable spaces no more than every 50'. X has a fair amount of office and retail--the bigger fear is that it sits vacant.
|
Quote:
|
Quote:
|
Quote:
The city has not done a good job of getting offices downtown. that is on the city, the Metro has plenty of office draw. |
Don't forget Gilbert has Rivulon too, another couple of million sqft of office space.
|
Right on scheduled:
https://www.bizjournals.com/phoenix/news...f-10-best-states-for-new-businesses.html Quote:
|
^ North Dakota is a better place to start a business than AZ? :haha:
Thanks for saving me a click. |
Quote:
|
Quote:
Phoenix is no longer central to the workers that companies want to hire nor has it ever been really close to the executives that will hire them. I suppose when Central Phoenix starts to gentrify further and the schools improve, that will change. |
A lot of equipment and rebar columns on site. Sorry for the crappy cellphone pic.
You can also see some of the new fencing up at The Fillmore site from this angle and upcoming Aspire Fillmore https://i.imgur.com/my07JPQh.jpg |
Quote:
|
Obstruction evaluation for a 410' crane:
https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=411640079&row=4 |
Quote:
|
I drove by the site today. There was lots of activity.
|
Quote:
|
Quote:
Bring on this beast!!! |
Well I've learned that the first phase is basically the I shaped section of the rendering:
https://i.ibb.co/b27rgS4/X.jpg This leaves me wondering if phase 1 is at 290'ish mark? If so, then the second phase will be a little taller as it has an additional floor which would put it a tick over 300', but still nowhere near enough for a 410' crane. |
Quote:
|
Is the first phase going to be facing Van Buren or Monroe? Hopefully Van Buren first.
|
Quote:
|
Quote:
|
Quote:
|
I am ok if this project is single phased for now or the developer revisits phase 2 later. I like it for what it is, but it's too much of a stub on an important piece of dirt that is growing in importance with Downtown's mid-west side.
For example, downtown is strangely running out of parcels big enough to build a decent, large floorplate office building if the submarket ever picks back up and the half block may as well be left over for that. |
|
First crane is up (1 of 2)
|
PMG Seals $102M Financing for Phoenix Multifamily Project
https://commercialobserver.com/2019/10/pmg-phoenix/
Quote:
|
Katerra hasn't posted any new webcam for X, but I did find this one and I think it looks just directly over the site for X:
https://video.nest.com/live/TbinOWG9t0 |
Quote:
|
| All times are GMT. The time now is 3:46 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.