maccoinnich Feb 16, 2015 4:47 PM

Burnside Bridge Earthquake Readiness Project
 
Quote:

Multnomah County's 20-year bridge plan emphasizes earthquake endurance

http://imgick.oregonlive.com/home/olive-...n/photo/2015/02/13/-c8a02173056a87d9.JPG

A tug and barge, bringing arch pieces for the Sellwood Bridge from Thompson Metal Fab in Vancouver to the bridge construction site on the Willamette River, pass under the Burnside Bridge (the Steel Bridge is visible in the background) on Dec. 15, 2014. County leaders want to spend $496 million to either replace or significantly upgrade the Burnside Bridge for emergency crews to safely cross the Willamette River after a major earthquake. Randy L. Rasmussen/The Oregonian


By Tony Hernandez | The Oregonian/OregonLive

Multnomah County wants to spend about a half-billion dollars to prepare the Burnside Bridge for emergency crews to safely cross the Willamette River after a major earthquake.

An estimated $496 million project to either replace or significantly upgrade the 89-year-old span can be found in a 20-year improvement plan for the county's six bridges.

Chairwoman Deborah Kafoury offered the proposal Thursday. The plan calls for 52 other projects with an estimated $1.3 billion total price tag. Approximately 200,000 people use the county's six bridges on a daily basis, according to the plan.

...continues at the Oregonian.

Nunya Feb 16, 2015 7:04 PM

Seems like this would be the perfect time to address West Burnside and turn it into a one way couplet with Couch extending from the East Side over to the West side of the river. Especially if the bridge is replaced, the alignment could be shifted to allow the existing bridge to be used during construction. Shift it somewhat north and transition Couch/Burnside on each side onto the bridge and make them a couplet on both sides.

Or go crazy and build a bridge a city block wide with roads at the boundaries and a new bridge park that connects the West and Eastside waterfront parks with a greenspace bridge across the river. Just have to get rid of that pesky road on the eastside that is in the way.

Abide Feb 16, 2015 8:22 PM

I think the main thing about the Burnside bridge worth keeping are the cool castle-like towers. I'd think those could be removed and stored somewhere for re-attachment to a replacement bridge.

hat Feb 16, 2015 8:40 PM

Quote:

Originally Posted by Nunya (Post 6917386)
Seems like this would be the perfect time to address West Burnside and turn it into a one way couplet with Couch extending from the East Side over to the West side of the river. Especially if the bridge is replaced, the alignment could be shifted to allow the existing bridge to be used during construction. Shift it somewhat north and transition Couch/Burnside on each side onto the bridge and make them a couplet on both sides.

Or go crazy and build a bridge a city block wide with roads at the boundaries and a new bridge park that connects the West and Eastside waterfront parks with a greenspace bridge across the river. Just have to get rid of that pesky road on the eastside that is in the way.

East Side Waterfront! Removal of Marquam Bridge, I-5 and ramps to Morrison. New Burnside Bridge can have an onramp connection and signal to stop cross-traffic traffic for bikes/peds. Protected bike lane on bridge and... what a beautiful new park we have.

2oh1 Feb 16, 2015 8:41 PM

How is it possible to have no mention of the Marquam bridge in that report? Did I miss it? I did a search but didn't find it in there. Is the plan to have it collapse so we can then start from scratch and get something less god awful?

maccoinnich Feb 16, 2015 8:48 PM

Quote:

Originally Posted by Nunya (Post 6917386)
Seems like this would be the perfect time to address West Burnside and turn it into a one way couplet with Couch extending from the East Side over to the West side of the river. Especially if the bridge is replaced, the alignment could be shifted to allow the existing bridge to be used during construction. Shift it somewhat north and transition Couch/Burnside on each side onto the bridge and make them a couplet on both sides.

Or go crazy and build a bridge a city block wide with roads at the boundaries and a new bridge park that connects the West and Eastside waterfront parks with a greenspace bridge across the river. Just have to get rid of that pesky road on the eastside that is in the way.

That's an interesting idea, but extending Couch has problems on both sides. One of the West side the Skidmore / Old Town Historic District is listed on the National Register of Historic Places. It's hard to imagine a design that would have an acceptable level of impact. On the east the development at the Bridgehead effectively now precludes extending Couch. The main resident entrance into Block 67 is planned to be onto the Couch Pedestrian Plaza.

Quote:

Originally Posted by 2oh1 (Post 6917492)
How is it possible to have no mention of the Marquam bridge in that report? Did I miss it? I did a search but didn't find it in there. Is the plan to have it collapse so we can then start from scratch and get something less god awful?

ODOT owns and maintains the Marquam Bridge. It's not Multnomah County's responsibility.

hat Feb 16, 2015 8:49 PM

Quote:

Originally Posted by 2oh1 (Post 6917492)
How is it possible to have no mention of the Marquam bridge in that report? Did I miss it? I did a search but didn't find it in there. Is the plan to have it collapse so we can then start from scratch and get something less god awful?

Condition of the Marquam as reported by Transportation for America.

2oh1 Feb 16, 2015 10:00 PM

Quote:

Originally Posted by maccoinnich (Post 6917501)
ODOT owns and maintains the Marquam Bridge. It's not Multnomah County's responsibility.

Gotcha. That explains it (among other things).

Quote:

Originally Posted by hat (Post 6917506)
Condition of the Marquam as reported by Transportation for America.

I find that superstructure to be anything but super.

urbanlife Feb 17, 2015 6:01 AM

Quote:

Originally Posted by Abide (Post 6917466)
I think the main thing about the Burnside bridge worth keeping are the cool castle-like towers. I'd think those could be removed and stored somewhere for re-attachment to a replacement bridge.

This would be my biggest concern, the bridge itself isn't anything special structurally, but the towers on the bridge are iconic and should always be a part of the design of the bridge.

Quote:

Originally Posted by 2oh1 (Post 6917588)
I find that superstructure to be anything but super.

Funny thing, I actually don't mind the Marquam Bridge, it is a great example of an undertruss bridge. It isn't a spectacular design, but I don't mind it.

maccoinnich Nov 6, 2015 7:43 AM

Quote:

Multnomah County takes first step in Burnside Bridge retrofit or replacement

http://image.oregonlive.com/home/olive-m...n/photo/2015/09/18/-5b4fb9a39585fd4c.jpg

An earthquake similar to Japan's 2011 upheaval could shut down for months almost 40 car lanes that cross downtown Portland bridges, a Multnomah County engineer said Thursday.

That includes the Fremont, Hawthorne, Burnside, Morrison, Steel, Broadway and Marquam bridges, County Engineer and Transportation Division Director Ian Cannon said. In February, the county published a 20-year plan calling for a $1.3 billion in spending, much of it to prepare bridges it owns for the big one.

County commissioners started Thursday by approving $3 million for a study to figure out what to do with the Burnside Bridge that was identified as the priority. Commissioners also approved the first of two readings that sets up a tobacco licensing program for retailers.

...continues at the Oregonian.

PacificNW Jul 15, 2017 2:10 PM

Burnside Bridge Earthquake Simulation Animation
 
https://youtu.be/sn98JkN5HXc

RainDog Jul 15, 2017 3:28 PM

https://media.giphy.com/media/jquDWJfPUMCiI/giphy.gif

PacificNW Jul 15, 2017 3:31 PM

Quote:

Originally Posted by RainDog (Post 7866083)


:cheers:

2oh1 Jul 15, 2017 9:10 PM

Yikes.

Don't watch that video before bedtime.

urbanlife Jul 16, 2017 5:03 AM

My reaction was, yep, that is pretty much what I already knew. I am hoping we can secure funding for a new Burnside Bridge soon for this very reason.

maccoinnich Aug 31, 2017 7:12 PM

Quote:

Bracing ourselves

From bridges to buildings, Portland needs more investments and incentives. What if the Burnside Bridge went down?


Two years ago, the Pacific Northwest awakened to the fact that the largest earthquake in American history is destined to shake us to our foundations — and then some.

Scientists have known a devastating Cascadia subduction zone quake was coming, but a Pulitzer Prize-winning 2016 New Yorker article by Kathryn Schulz was the first time many realized the magnitude of it all. That first night after reading the report I could barely sleep.

In case we'd forgotten the threat, this summer brought another scare, in the form of a simulation video released by Multnomah County demonstrating how the Burnside Bridge, perhaps the most vital arterial connector in the city, would be the first Portland span to go in a major quake.

...continues at the Business Tribune.

maccoinnich Sep 28, 2017 5:39 AM

Found this presentation given a few months ago. It looks like options of preserving the bridge or a seismic retrofit are being ruled out, with only a complete rebuild or hybrid (rebuild of major portions of bridge and approaches) likely to move forward.

Slide 42 shows some options for a rebuild on the current alignment, or alignments to the north and south. It's hard to imagine either of those moving forward given the impacts they'd have at the approaches.

urbanlife Sep 28, 2017 5:45 AM

Quote:

Originally Posted by maccoinnich (Post 7935731)
Found this presentation given a few months ago. It looks like options of preserving the bridge or a seismic retrofit are being ruled out, with only a complete rebuild or hybrid (rebuild of major portions of bridge and approaches) likely to move forward.

Slide 42 shows some options for a rebuild on the current alignment, or alignments to the north and south. It's hard to imagine either of those moving forward given the impacts they'd have at the approaches.

I feel like the north and south options were those after thoughts where someone was like "we only have the rebuild in the current location, quick, someone draw some lines on the map to make it look like we thought about alternatives."

eric cantona Sep 28, 2017 4:20 PM

Quote:

Originally Posted by urbanlife (Post 7935735)
I feel like the north and south options were those after thoughts where someone was like "we only have the rebuild in the current location, quick, someone draw some lines on the map to make it look like we thought about alternatives."

those other alts would conceivably allow the current bridge to stay open for traffic for much of the construction phase. similar to when they set up the old Sellwood bridge off to the side during construction. it's not a small consideration.

MarkDaMan Mar 16, 2018 2:31 AM

http://www.kgw.com/article/news/local/bu...d-for-impending-earthquake/283-528926339

Quote:

http://www.kgw.com/img/resize/content.kg...750&height=422&scale=both&bgcolor=000000

Burnside Bridge will either get retrofitted or replaced for impending earthquake
The Burnside Bridge is 92 years old and would suffer extensive damage in a Cascadia Subduction Zone earthquake.
Author: Sara Roth
Published: 1:32 PM PDT March 15, 2018
Updated: 6:10 PM PDT March 15, 2018
kgw.com

PORTLAND, Ore. – On the same day that a new study found a Cascadia Subduction Zone earthquake could displace 85,000 Portland metro residents and injure 27,000 people, Multnomah County announced it is one step closer to figuring out how to prepare the Burnside Bridge for an earthquake.

In the fall of 2016, Multnomah County started a process to figure out what to do about the Burnside Bridge, which serves as a critical lifeline between Portland’s east and west sides.

The Burnside Bridge is 92 years old and would suffer extensive damage in a Cascadia Subduction Zone earthquake.

There is a 40 percent chance of a Cascadia quake in the next 50 years, Oregon State University found.

On Thursday, Multnomah County released a digital presentation outlining its progress on the bridge project.

So far, the project ruled out three of five bridge replacement options. The bridge will not be left as-is, and the county won’t fix a different bridge instead of the Burnside Bridge. The county will also not fund a full retrofit, since it would greatly impact Interstate 5 during construction.

The county decided to move forward with two options: The bridge will either be fully replaced, or mostly retrofitted and sections replaced over I-5 and the Union Pacific rail line so the freeway isn’t as disrupted.
(continues)...

maccoinnich Sep 12, 2018 5:55 AM

Quote:

Burnside Bridge ideas narrowed to 4 options as county seeks ‘earthquake ready’ crossing

https://expo.advance.net/img/67a34038d4/width960/bda_yard28933568.jpeg

Multnomah County has narrowed its list of ideas for replacing or retrofitting the Burnside Bridge, a project it says is necessary to make sure at least one downtown Willamette River bridge could survive an earthquake, to four options.

According to a draft document published Aug. 31, the county wants to further study the following: Seismically retrofitting the 1926-era structure; building a new bridge without a lift span; replicating the drawbridge in the same height and location; or building a new drawbridge while splitting westbound traffic into a separate approach to address a growing bottleneck at Northeast Couch Street.

All of the options would cost more than $500 million to build. The Burnside Bridge was chosen as the best option to invest in because the street runs 17 miles in between Gresham and Washington County and could provide a significant life-line for the region if a Cascadia Subduction Zone rupture ravages the city.

According to the county, the current bridge is not expected to survive following a magnitude 8 or greater Cascadia Subduction Zone earthquake. A simulation of the expected earthquake destroying the bridge has been viewed in 96 countries and watched more than 74,000 times.
...continues at the Oregonian.

MarkDaMan Jun 16, 2020 5:23 PM

https://www.kgw.com/article/weather/eart...283-86986308-6c40-4217-a00c-4f6a9fd81d51

Quote:

Burnside Bridge task force recommends 'long span' design, no temporary bridge
The Earthquake Ready Burnside Bridge task force looked at four types of bridges and has chosen the long span alternative for the replacement bridge.
KGW.com
Author: Jeff Thompson
Published: 9:27 AM PDT June 16, 2020
Updated: 9:51 AM PDT June 16, 2020

PORTLAND, Ore. — In the interest of making the upcoming Burnside Bridge replacement resilient to a major earthquake, a task force on Monday recommended moving forward with a long span bridge alternative.

The recommendation came after 18 months of work. The task force and a Multnomah County project team have met 16 times to discuss alternatives for the Earthquake Ready Burnside Bridge Project.

The long span bridge would replace the existing bridge in the same location and alignment, said Multnomah County spokesperson Mike Pullen.

"The long span alternative has the fewest support columns of four alternatives that were studied," Pullen explained. "Fewer columns avoids costly construction in geotechnical hazard zones near the Willamette River, and restricted spaces between lanes of Interstate 5 and the Union Pacific Railroad tracks on the east side."
...(continues)

urbanlife Jun 29, 2020 5:30 AM

That would be a drastic change to an iconic bridge. It will be interesting to see what this new era of the Burnside Bridge ends up looking like. Personally I am really excited to see what happens now that they seem to be set on the long span design, which did make the most sense for a number of reasons.

maccoinnich Oct 14, 2021 10:36 PM

Presentation [5MB] to the Landmarks and Design Commissions

urbanlife Oct 15, 2021 6:30 AM

Quote:

Originally Posted by maccoinnich (Post 9424196)
Presentation [5MB] to the Landmarks and Design Commissions

I was just thinking about this project today and wondering what the results from the survey were. I like that basically we all agree what the bridge should look like. I hope they go with the single arch design because I think the cable stay style would just get confused as being the Tillikum Bridge.

Tykendo Oct 15, 2021 5:01 PM

I like both, complete replacement, options. Upgrade for the long run. I like the twin arches for that area.

CorbinWarrick Oct 15, 2021 7:48 PM

For such a prominent spot along the waterfront you would think something more world renowned iconic look would be made

urbanlife Oct 16, 2021 8:12 AM

Quote:

Originally Posted by CorbinWarrick (Post 9424996)
For such a prominent spot along the waterfront you would think something more world renowned iconic look would be made

Both of these options would be quite iconic for that stretch. A bridge first and foremost must function correctly before it can have any specific iconic look. In this case, it is three bridges in one because of the three stretches it has to cross.

uncommon.name Oct 19, 2021 7:20 PM

Quote:

Originally Posted by urbanlife (Post 9425358)
Both of these options would be quite iconic for that stretch. A bridge first and foremost must function correctly before it can have any specific iconic look. In this case, it is three bridges in one because of the three stretches it has to cross.

I'm kind of liking the tied arch design. The cable stay design will look like a larger version of the Tilikum Bridge and the Leonard P. Zakim Bunker Hill Memorial Bridge in Boston.

urbanlife Oct 20, 2021 6:11 AM

Quote:

Originally Posted by uncommon.name (Post 9427890)
I'm kind of liking the tied arch design. The cable stay design will look like a larger version of the Tilikum Bridge and the Leonard P. Zakim Bunker Hill Memorial Bridge in Boston.

Oh yeah, also a good point about Boston. I was driving over the Burnside today thinking about how cool the arch design would look.

MarkDaMan Jan 27, 2022 1:30 AM

paywall: https://www.oregonlive.com/commuting/202...ss-lane-other-cost-cutting-measures.html

Quote:

Task force signs off on Burnside Bridge replacement with one less lane, other cost-cutting measures
Updated: Jan. 25, 2022, 3:58 p.m. | Published: Jan. 25, 2022, 12:48 p.m.
By Jayati Ramakrishnan | The Oregonian/OregonLive

A Multnomah County committee voted on Monday to advance plans for a new, earthquake-resistant Burnside Bridge that would have one less lane for cars than the current bridge and made other tweaks to the project’s design in the hopes of saving taxpayers about $240 million.

But most members of the Burnside Bridge Community Task Force who voted Tuesday night said they were not eager to narrow the bridge — cutting one traffic lane from an earlier design and shrinking a shared path for bicyclists and pedestrians — and only did so because they are anxious to move forward with plans for a structure that would be a lifeline in an anticipated Cascadia earthquake, in which other bridges would likely collapse or be rendered impassable.

The project has already been pushed back a year. Now construction would start at the earliest in 2025.

The committee, made up of 20 community members, including representatives of walking, pedestrian, bike groups and neighborhood associations, voted on three changes that county employees came up with to reduce costs on the bridge from nearly $1 billion, down to somewhere in the $700 million to $800 million range.
...($continues$)

MarkDaMan Jan 27, 2022 1:34 AM

^The full article also significantly downplays the big cuts to the bicycle and pedestrian infrastructure in this round of cuts.

Tanaka07 Feb 11, 2022 6:20 PM

https://www.oregonlive.com/opinion/2022/...ne-tunnel-solves-two-traffic-issues.html

Readers respond: One tunnel solves two traffic issues

I wish this could become reality.

maccoinnich Feb 11, 2022 6:25 PM

If we were to spend billions on a tunnel from Goose Hollow to the Lloyd District I feel like it should be for the MAX.

CorbinWarrick Feb 12, 2022 5:23 AM

Quote:

Originally Posted by maccoinnich (Post 9533580)
If we were to spend billions on a tunnel from Goose Hollow to the Lloyd District I feel like it should be for the MAX.

This plan alone would be the greatest idea Portland and Tri Met ever did. The max is soooo slow from the Lloyd district to goose hallow almost makes it not worth to take. This plan should have been done a long time ago

Jakz Feb 13, 2022 1:01 AM

Hi all! I just created an account, but I've been a lurker/non-poster here for a while. I work as a structural engineer here in town. This past week I was bored (what's new) so I wrote the Oregonian piece above. Didn't think they'd actually publish it!

Here's the rest of the plan. Fleshed out some of the details last night. Iain, I actually fully agree that a MAX tunnel should be the first priority. But it wouldn't solve the seismic connection problem, and, well, good luck getting that money from ODOT. But this morning I started wondering if it wouldn't be possible to do both.

The Alaskan way tunnel had a 52' inner diameter. If that is increased to 57', it becomes possible to add a third level at the top. See sketch at the link below. The tunnel area increases by 20%, so it is a jump, but not a huge jump. And definitely cheaper than boring a separate tunnel.

https://drive.google.com/file/d/1dFzZ5KC3jWWfU_3YYEHjQg4cD3uIun9Z/view?usp=sharing

Where would the tunnel go? If there's a transit component, I think the logical station locations are Lloyd / NE 12th (at beginning of tunnel), Burnside / NE 2nd, Burnside / SW 6th, and Providence Park. The western terminus of the tunnel would be near the SW Jefferson exit ramps. The NE 2nd / Burnside station would connect to a central eastside light rail line along the waterfront.

See PDF at the link below for a sketch of the central eastside (yes, I'm aware this is quite nerdy, but I had fun making it).

https://drive.google.com/file/d/1Z30TUQjbi_1X9XP2JINB9vNoe3NFj1Cs/view?usp=sharing

The east side freeway would be removed, and only ramps would remain, lowered to run in a trench. There would be one lane and a breakdown shoulder in each direction. The freight railroad that currently runs down SE 1st St. would be rerouted and lowered to run parallel with the freeway ramps. The total width of the trench would be ~75 ft., but it would be broken into three spans. This means that ODOT wouldn't have to pay for the highway caps. The blocks could be sold off individually, with developers taking responsibility for building the caps. With 25' spans, it would be no different than building on top of an underground parking level. Of course, in this case, the developers wouldn't get the benefit of having a parking level below. But with prime riverfront property, I think it would pencil. If necessary, zoning could be adjusted to allow for more stories to compensate the developers.

All of this was inspired by my (perhaps irrational) hatred of the central eastside freeway. I've seen other proposals to do away with that section of freeway, but most of them aren't convincing. Capping the highway in its current location wouldn't work since it's at grade. Lowering it while maintaining operations would be a logistical nightmare and incredibly expensive given the width and spans. A deep bore tunnel is a non-starter because of all the ramps. Much as I'd like to believe that simply removing it is an option, I'm skeptical. Funneling all of the region's N-S traffic, E-W traffic, S-E, and N-W traffic across the Fremont bridge is, I think, unrealistic.

So, to summarize: A 57' diameter tunnel that accommodates light rail and highway. Let's round the cost up from $3.3 billion to $4 billion due to the larger diameter. It's worth noting that Trimet (those excellent stewards of public funds) were batting around a $4 billion figure for their own, separate, tunnel. Let's round up again to $5 billion for all the miscellaneous stuff. Trimet can pitch in $2 billion, Multnomah county can pitch in $1 billion, ODOT can pitch in $1.5 billion, and we're basically there!

I should note that I don't actually expect this to be taken seriously, and I did this mostly for my own entertainment. Posting it here since some of you may find it interesting. I do wish we were having more of these big-picture conversations, though.

[Iain, I recognize this is very off-topic, feel free to move as appropriate]

dizflip Feb 13, 2022 10:53 PM

Above post made me so wet.

Then we can give Portland Streetcar the Yamhill/Morrison and 1st Ave alignments?

Rob Nob Feb 14, 2022 5:03 PM

Quote:

Originally Posted by Jakz (Post 9534825)
I work as a structural engineer here in town.

Too bad the article didn't mention your credentials.

MarkDaMan Mar 22, 2022 9:08 PM

https://www.multco.us/multnomah-county/n...easures-earthquake-ready-burnside-bridge

Multnomah County

Commissioners approve cost-saving measures for an Earthquake Ready Burnside Bridge

https://www.multco.us/s3/files/styles/me...CopyrightHDR_20220324_.jpg?itok=3TDXPEOr

March 21, 2022

On Thursday, March 17 the Board of County Commissioners unanimously approved a plan to significantly reduce the cost of the Earthquake Ready Burnside Bridge Project.

Without the cost reductions, the project is estimated to cost more than $1 billion. The cost-saving measures approved by commissioners will reduce the project’s costs by as much as $215 million.

“I think the work that you’ve done to get to this place, with going through the numerous committees and groups has made this project all the more better and stronger,” Multnomah County Chair Deborah Kafoury said. “And have a lot more community buy-in.”

As part of the new cost savings, commissioners approved a bascule movable span, a westside girder approach and reduced the width of the bridge. The current Burnside Bridge is a bascule bridge, which rotates open to provide unlimited clearance for river traffic. It also preserves the existing view corridor.

County Public Information Officer Mike Pullen said there was broad public support for the bascule and girder but mixed support for narrowing the width.

“Basically a theme that we heard from the public is if money was no object, we prefer the wider bridge you originally proposed: but we don’t want to prevent the project from getting built,” Pullen said.

Andrew Holtz, the Multnomah County Bicycle and Pedestrian Citizen Advisory Committee chair shared his concerns with narrowing the bridge width during public comment.

“The budget plan casts the choices between a skinny bridge and no bridge at all, that is a political calculation,” Holtz said. “Getting adequate funding is harder than settling for inadequate funding, but it’s worth the fight, climate action is not optional.”

“This is not the ideal thing that we would be wanting to put forward, but it is with the reality of where costs are right now, the impacts of inflation and what we know we need to prioritize for this project in getting a bridge that will help Portland and Multnomah County stay as whole as possible, and recover as quickly as possible, after a Cascadia event,” Commissioner, Jessica Vega Pederson said.

The Burnside Bridge is nearly 100 years old and is a major connection between the east and west sides of the Portland-metro area.
County engineers say the current bridge would not withstand a magnitude 8+ Cascadia Subduction Zone earthquake that could hit the Pacific Northwest region at any time.

The Earthquake Ready Burnside Bridge Project will replace the existing bridge with a new seismically-resilient crossing, so that it can be immediately used after a major earthquake.

“It’s been 322 years since the last major Cascadia Subduction Zone earthquake and studies show there is a one in three chance of a major earthquake happening in the next 50 years in Oregon,” County Project Manager, Megan Neil said. “This is why the county has invested in the Earthquake Ready Burnside Bridge Project whose purpose is to really provide that one downtown bridge that’s going to be seismically resilient for our community to use.”

At the onset of this project, Multnomah County conducted a feasibility study of more than 100 options, including tunnels, ferries, double-deck bridges and other bridge options.

Four bridge alternatives from that study were recommended for additional evaluation in the Environmental Review Phase. This phase studies various environmental impacts the project could have on the surrounding area.

The County asked the community to weigh in on the preferred alternative of the four options through a public engagement process. The Replacement Long Span was chosen as the most feasible option for having the lowest cost, its seismic resiliency and the fewest environmental impacts.

The County then asked community members for thoughts on the type of long-span structure they would like to see built for the project. The options included girder, truss, tied arch and cable-supported structure. It also included bascule and lift choices for the bridge’s moveable span.

In early 2021 County leaders raised concerns about the project’s overall costs due to various external factors, including pandemic-related inflation, and asked project leaders to find ways to reduce the cost of the project. The team found the three important cost refinements totaling roughly $200 million that the commissioners approved on Thursday.

Project managers will now put together a Supplemental Draft Environmental Impact Statement which will be released in late April. The document describes the impacts of the cost-saving measures. There will be a public comment period before the Federal Highway Administration reviews the environmental impact statement.

In late 2022, the project will publish the final environmental statement and complete the planning phase. Design of the new bridge is expected to start in late 2022. Construction would begin in 2025 and last four to five years.

PacificStates Mar 23, 2022 1:19 AM

It frustrates me that it takes us a decade (or more) to plan and complete a simple bridge, mostly out of jealousy while watching other parts of the world build so quickly.

zilfondel Jul 22, 2022 6:21 AM

The Alaskan Way viaduct tunnel was already, at 52 feet in diameter, the largest bored tunnel ever constructed on earth. It ran into a myriad number of problems not the least of which was that the thing broke down partially due to its size and required 2 1/2 billion dollars to dig it out just so they can re-launch it. Building an even larger tunnel is not only completely unnecessary for a city Portlands size to have the largest tunnel in the world, but would introduce major risk in such a project and would also drain Oregon‘s transportation budget for the next 50 years at the state level and possibly even federal matching dollars.

And as much as I hate sitting in traffic when I occasionally have to drive to Hillsboro, I don’t think spending billions of dollars for a roadway tunnel of a mile and a half under downtown Portland is the best use of funds… Particularly when you know it’s going to be tolled a significant amount, it’s not gonna serve nearly as many people as a train line could. A highway tunnel under downtown Portland will essentially be a gold plated roadway for wealthy commuters.

Maybe get The Boring Compamy to build a privately funded hyper loop for you.

urbanlife Jul 23, 2022 5:41 AM

Quote:

Originally Posted by zilfondel (Post 9682867)
The Alaskan Way viaduct tunnel was already, at 52 feet in diameter, the largest bored tunnel ever constructed on earth. It ran into a myriad number of problems not the least of which was that the thing broke down partially due to its size and required 2 1/2 billion dollars to dig it out just so they can re-launch it. Building an even larger tunnel is not only completely unnecessary for a city Portlands size to have the largest tunnel in the world, but would introduce major risk in such a project and would also drain Oregon‘s transportation budget for the next 50 years at the state level and possibly even federal matching dollars.

And as much as I hate sitting in traffic when I occasionally have to drive to Hillsboro, I don’t think spending billions of dollars for a roadway tunnel of a mile and a half under downtown Portland is the best use of funds… Particularly when you know it’s going to be tolled a significant amount, it’s not gonna serve nearly as many people as a train line could. A highway tunnel under downtown Portland will essentially be a gold plated roadway for wealthy commuters.

Maybe get The Boring Compamy to build a privately funded hyper loop for you.

If the city and state ever get to the point to wanting to do a serious tunnel route under the downtown, I would hope it would be for underground light rail.

eric cantona Jul 23, 2022 10:51 PM

Quote:

Originally Posted by urbanlife (Post 9683836)
If the city and state ever get to the point to wanting to do a serious tunnel route under the downtown, I would hope it would be for underground light rail.

This + a dozen doughnuts. Building hyper-expensive road infrastructure is counterproductive to climate goals.

maccoinnich Nov 7, 2023 12:59 AM

Quote:

Joint venture selected for Burnside Bridge replacement

https://djcoregon.com/files/2022/08/0810_Burnside_Bridge_WEB.jpg

Multnomah County recently selected the construction team for the $895 million Earthquake Ready Burnside Bridge project to replace the 97-year-old span with one that can withstand a major earthquake.

Burnside Bridge Partners will be the construction team; it’s a joint venture featuring Stacy and Witbeck, Traylor Bros., and American Bridge Co. The team will use the construction manager/general contractor (CM/GC) delivery method and begin work in December.

The team members have extensive experience with CM/GC delivery, construction of technically challenging and signature bridges, and have demonstrated dedication to diversity and equity in both subcontracting and workforce development in previous projects, a spokesperson for Multnomah County stated.

...continues at the DJC ($).

urbanlife Nov 8, 2023 8:07 PM

Is this the design they decided on?

eric cantona Nov 8, 2023 8:33 PM

Quote:

Originally Posted by urbanlife (Post 10076719)
Is this the design they decided on?

The CM/GC team for design through construction hasn't really begun designing, as far as I understand it. A high level breakdown of the schedule is here:

https://www.multco.us/earthquake-ready-burnside-bridge/design-phase

maccoinnich Nov 8, 2023 9:23 PM

Quote:

Originally Posted by urbanlife (Post 10076719)
Is this the design they decided on?

Not exactly, but it seems likely they're going to wind up either a tied arch or a cable-stayed bridge at the east span, a bascule for the center span, and a girder at the west span. Between the tied arch and cable-stayed it looks like the tied arch is less expensive, so most likely it will wind up looking something like that rendering.

CorbinWarrick Nov 8, 2023 9:53 PM

Hopefully this is a very prominent design. One recognized around the country. This location is just to perfect for it not to be

eric cantona Nov 20, 2023 8:50 PM

Bridge designer Beam Architecture has joined the design team.
https://www.beam-architects.com/projects/

uncommon.name Nov 20, 2023 9:19 PM

Quote:

Originally Posted by eric cantona (Post 10084816)
Bridge designer Beam Architecture has joined the design team.
https://www.beam-architects.com/projects/

Well that's a good sign... they have designed some stunning bridges around the world.