![]() |
After the SELRT is built what NCLRT style of transit would you like?
The NCLRT isnt being built until the near future but i think its up to you guys to decide on what it should be like?
|
Quote:
Similarly, most of the West LRT design decisions were set in place because the new West LRT line is simply an extension of the NE LRT line. |
Quote:
|
Other than how 'modern' or 'basic' the stations are, there isn't much else that can be changed once you have made the decisions on the train stock and power systems.
I remember noticing how much nicer the stations were at Dalhousie and Crowfoot, but only because they were the newest stations at the time. Most of the other stations built in the first few phases were 'cookie-cutter' designs to minimize the up-front costs of building the new LRT lines, so I was happy to see the downtown 80's-era pre-cast concrete platforms downtown have been replaced with new station designs that show someone was willing to go beyond the 'boring basic beige box' that is so common with transit stations. |
The poll is too simplistic. Again each item, it should list at least two additional items. 1. Number of people that will be served with that particular option, and 2. The cost of the option.
If you don't list cost, certainly 500 km of metro all around the city would be fantastic, but such a poll means little as it is not pragmatic. |
Quote:
And with the SE LRT terminating at 2nd Av@2nd St, the North LRT would also terminate somewhere else downtown? If this were true, why bother connecting the South LRT to the NW LRT when they could have built them as separate lines with their own downtown terminals? Seems quite silly to me to have so many dead-end terminals downtown when the NE LRT trains could (and will) continue west, and the SE LRT trains could continue north. |
Quote:
|
Connect it to the SE LRT
|
Isnt this just going to be a combination of a few different LRT types like the West LRT?
|
Personally, I'm hoping for and supporting some type of hybrid Metro straight up Centre Street rather than the Nose Creek alignment (obviously). However, having read some of the difficulties that are occurring with Toronto's Eglinton Crosstown LRT and building a completely grade separated low floor LRT, suggests to me that a long stretch of underground low floor LRT may not be the best choice for this corridor. So while, there's logic in connecting the North Central LRT to the SE LRT, I'm not sold that this is necessarily the best choice.
However, decisions like that are generally well above my pay grade and to me the most important thing is that the Centre Street corridor is used and that it is a high capacity rail corridor. The details beyond that still need to be evaluated by experts (or more knowledgeable forum members) before I can venture an opinion further. |
Quote:
You go with what you know. It won't be a surprise to me to see the Siemens-Duewag U2 and/or Siemens SD-160 trains (or younger variants) running on NC LRT when it opens. |
Quote:
|
Quote:
|
Quote:
There is also the 2010 Clifton ND Lea Compendium (Southeast LRT Compendium of Functional Planning Studies) available here: http://www.calgarytransit.com/pdf/Southeast%20LRT%20Compendium.pdf This 2010 report brings together all the separate SE LRT studies and plans that have been done since the mid-80s and creates one proposed alignment from Downtown to the new South Hospital. As noted in the 2010 report, if the SE LRT is operated separate from the rest of the LRT system, it can use the new low-floor cars which would be incompatible with the existing LRT system, but it will also need its own maintenance centre (which was not part of the 2010 report scope). |
Mid-Century future LRT?
A proposal submitted to Plan It Calgary:
http://www.principia-communications-stra...d%20and%20Dream%20a%20Mighty%20Dream.pdf From the Executive Summary: "The C-Train service plan envisioned in this document encompasses a total of seven light rail transit lines by the year 2040." |
I know I've mentioned it before, but I think that the question being posed in this thread is the wrong one. If Centre Street does become the preferred route for the NC LRT I think the question we need to be asking is "How can we build the NC LRT at the same time as the SE LRT?" I realize that with the infrastructure funding programs currently in place, the total cost of building the NC LRT and SE LRT is too much, however people always seem to over-look a P3 model to provide the financing. Some food for thought:
- Putting the NC LRT and SE LRT out to tender at the same time creates an opportunity for savings through economies of scale. - If there has ever been a time to finance a project through the private sector, now is the time to do it. With interest rates the way they are, money is cheap and with the economy the way it is, those dollars will stretch further. - While a P3 model will ultimately cost the city more than a traditional funding model, it also allows the shovels to be put in the ground much sooner than they ever would be otherwise. The NC and SE LRT have the power to transform the city by bringing re-investment and added densities to the communties that border the routes. If we are to believe the reports that accompanied the Plan It: Calgary document, continued urban spawl could potentially add $11 BILLION in additional costs to the City. The sooner the shovels go in the ground, the sooner the NC and SE LRT lines can begin to have an impact on where private development dollars are invested. If pursuing a P3 strategy moves up the construction timeline by 10 years or more, I have no doubt the additional costs a P3 model would bring would be more than offset by the savings in reducing Calgary's potential urban footprint. - Ultimately, any construction financing will have to be sold to the public. There are numerous examples (the Calgary ring-road being one of the most notable) that show the public are much more receptive to a debt burden being added to a government through a P3 than through any other means. Saying "we're borrowing $6 billion to build a combined NC/SE LRT" will meet with resistance. Saying "We're spending a $6 billion funding grant on a combined NC/SE LRT" will meet with resistance. Saying "We've entered into a P3 agreement where we will see the NC/SE LRT open with-in 5 years and only then will we have to begin paying a couple hundred million dollars a year with the burden being shared with various levels of government" will probably be easiest to sell out of all the options. - Building the NC/SE LRT all at once will provide a huge amount of relief off of the city's main artery (Deerfoot Trail). How much economic productivity is lost on an annual basis due to congrestion and grid-lock on this corridor?? Once again, if we can move up the construction timeline by 10 years, how much money can be saved due to recovered economic productivity?? And finally this: The biggest reason I find people give for not building the NC and SE LRTs at the same time is simply that the scale of the project is "too big for Calgary". Well the City of Toronto (more specifically Mayor Ford) has committed itself to spending $12 Billion to build a cross-town LRT line ($8 Billion) and a subway extension ($4 Billion). The subway extension will be financed using a P3 model and can serve as a model for the City of Calgary moving forward. While there is a lot of debate as to exactly what should be built for the money (subway versus LRT, etc....) the fact is that the public in Toronto has realized that rapid transit needs to be a priority and they are willing to spend $12 Billion to make that happen. Calgary has half the population of Toronto and a combined NC/SE LRT would probably carry about half the cost of Mayor Ford's transit plan. If they can make this work in Toronto, why can we not make it work in a city known for it's innovation and can-do spirit and just so happens to sit in one of Canada's wealthiest provinces that is also home to a large number of MPs with Canada's governing party?? |
Quote:
|
I still think the Nose Creek Valley alignment for NCLRT could generate more density than a Centre St alignment. City owned land at the Spring Gardens transist storage site, the neighboring materials storage site. the Midfield Mobile home park and Fox Hollow golf course would provide for huge almost greenfield development. Throw in privately owned land at the Elks Golf Course and Greenview Industrial park and the development potential is massive. A master plan could restore Nose Creek, develop green space along its path and provide a connection westward to the exisiting Confederation/Queens Park green space.
Centre Street would likely only experience 10th Street North like densification at best and that would likely occur even without LRT. The biggest challenge with a Nose Creek alignment would be how to connect it to the SE line through downtown. Maybe it could branch off the SE line somewhere in Ramsay, and interline with the SE line into downtown. |
Quote:
As for the route - I really hope we go underground up Centre Street to at least 24th Ave. Thanks for that mid-century LRT plan link - looks like I've got some nighttime reading. :) |
Quote:
|
Quote:
The thing is, Toronto is not spending 8 billion on the Eglinton line; Ontario is paying for it. Likewise, we need the support of a higher level of government for such a project. Hopefully, with the completion of the Ring Roads, Alberta will see the value in building out Calgary and Edmonton's primary transit networks. I simply can't see it being done without the province, if not the feds as well, on board. |
Quote:
I doubt any of this density would materialze with a C-train running up that corridor. That area is all industrial, and adjacent to deerfoot, less than appealing residential land, and not at all appealing for commercial. Keep it industrial and focus on upping density along center street beyond what it would without LRT, and servicing all the other populations along that alignment better than if it was in the Nose Creek alignment. |
Quote:
|
Quote:
|
Quote:
|
Quote:
Having 4th St as a 'straight shot' to Beddington makes for a simpler construction although some people might be bored with a line that has few curves. Having LRT on (and under) 4th St can pull in riders from as far away as 10th St on the west and Deerfoot on the east, and there are many areas along 4th St that are ripe for TOD re-developments near LRT stations. Just because 4th St is low density today doesn't prevent pockets of higher-density developments from happening as a result of a new LRT line being put in. |
By the time the SELRT is completed the need to take the 7th Ave LRT below or above grade like 8th Ave presumably will be should be a much more pressing need than the Nose Creek LRT. A couple people here doggedly insist that 7th will never need to be taken out of traffic, ever but this isn't the case. Calgary Transit can't operate their peak headways as scheduled today and their long-term goal is two minute headways on both 201 and 202 are simply incompatible with 7th Ave at grade. Surely they will be along shortly along with the anti-interlining people.
Quote:
|
The type of system to be used for the NCLRT is probably going to be a mix of underground, at-grade and elevated. The whole "urban LRT" "metro" etc is really confusing. Calgary Transit fell into this trap as well, using undefined and vague terms for the types of transit.
To know what we are talking about, we need to ask the following questions: What kind of right-of-way does the system use? (Fully separated, separated but with at grade vehicle crossings, or operates in mixed traffic) How long are the consists? (3 cars, 4 cars, 5 cars, 9 cars, etc) Where is power provided from? (electrified third rail, over head caternaries) Where are the stations? (at grade, elevated, underground) What type of vehicle? (low floor LRV, high floor LRV, Lyle Lannley's Monorail) |
For once, I actually agree with PolicyWonk. What kind of of Black magic is this :haha:
|
Quote:
I think that, for a Nose Creek alignment to not harshly limit total system capacity, it would still need to be either a continuation of the SE LRT or it would require a fourth downtown ROW for an entirely independent operation. The expense of either would quickly push the cost of a Nose Creek alignment much closer to that of a Centre Street route. That is ignoring the cost of competing with both the province and a freight railway for part of what could quickly become a very sought after ROW. The Centre Street corridor will intensify with or without an LRT. I have serious doubts that freeway adjacent industrial parks, entirely cut off from existing residential services, will ever become attractive areas for redevelopment. I would imagine that the thirty year old 39 Avenue Station would be surrounded by condos if such an eventuality were likely. Besides, the entire plan would be built upon the already iffy proposition that we ought banish industry, and the decent paying blue collar jobs associated with it, from the inner city. As for the golf courses, Shawnee Slopes seems to counteract the notion that NIMBYs will be cool with their redevelopment. |
Quote:
|
Quote:
|
Quote:
|
Speaking of Shawnee Park, Geo-Energy had hoped to have that project in front of CPC before Christmas and to Council in the new year, but I guess that's not gonna happen, as the last CPC agenda for the year has only 3 items on it, and this isn't one of them. Despite all the hoopla over it, I'm actually curious to see what the project will look like and if it actually gets underway. Geo-Energy is in the process of putting up security fencing and "no trespassing" signs all along the perimeter of the golf course, so they must be getting ready for a 2012 start.
Whoops, wrong thread. Mod, please move. |
Quote:
|
Quote:
I think the CPR ROW along Nose Creek isn't big enough to accommodate the twin tracks for LRT (and the extra room needed for stations), and the High Speed Rail tracks, and the CPR line to Edmonton. Any talk of running LRT up Nose Creek may be a red herring |
Quote:
|
Quote:
If the City formally committed to a Centre Street alignment it could then implement a policy of gradually increasing density along the corridor in anticipation of construction. The transition would be stretched out over a longer period of time and fewer people would feel they were being "pushed out." Out here in Metro Vancouver, the Tri-Cities area in the Northeast has been continuing to densify in advance of the planned Evergreen Line. They've been taking a proactive strategy (unlike the City of Vancouver) and Calgary should think about doing the same thing. The Centre Street corridor could absorb a lot of future growth and provide unique and distinct urban communities with an LRT down Centre Street. |
Quote:
I guess council should run the NCLRT as a centre street route connecting to the SELRT. |
| All times are GMT. The time now is 7:12 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.