Old Posted Mar 28, 2014, 5:20 PM
Transport Tycoon Transport Tycoon is offline
Registered User
 
Join Date: Mar 2014
Posts: 2
Lightbulb The Horseshoe LRT Line

While the specific routing of the entire Southeast and North-Central LRT lines is not yet settled, we do have a general idea of where these lines will be placed and what neighborhoods and destinations they will be serving. Once the SE and NC lines are built, Calgary's LRT lines will be headed to all quadrants of the city.

So what next? Where should the next LRT line go?

What I would want to see is "The Horseshoe Line". The Horseshoe would act as a connecting line between all existing LRT lines and connect critical destinations to the existing LRT system (including the airport).

The routing of the Horseshoe would be roughly as follows:

• The initial southeast terminus would be just west of Barlow Trail SE, aligned with Glenmore Trail. This station would be shared with the SE portion of the Green Line. From there, the Horseshoe would follow Glenmore Trail, through its Deerfoot Meadows Station, until just east of Blackfoot Trail when it would tack to the north towards a 62nd Avenue SW alignment.

• Following 62nd Avenue, the Horseshoe would tunnel underneath Centre Street and the Chinook LRT Station. An underground Chinook Station (renamed Chinook East) would provide connections to the South portion of the Red Line. The tunnel would then tack back towards Glenmore Trail, with a Chinook West Station underground at the south end of Chinook Centre. The Horseshoe would reemerge above ground west of Elbow drive.

• Following along the north side of Glenmore Trail, the Horseshoe would reach its Rockyview Hospital Station at 14th Street SW (with pedway connection to the Rockyview Hospital). The Horseshoe would then turn northward and run across a dedicated bridge running parallel to the east side of the Glenmore Dam.

• Having crossed the Elbow River, the Horseshoe will curve around the east side of the Glenmore Athletic Park and then follow a 50th Avenue SW alignment to the west. This alignment will be maintained west of Crowchild Trail and onto the Mount Royal University campus towards its MRU Station.

• Continuing on the 50th Avenue SW alignment, the Horseshoe will run along the north side of Glenmore Trail after departing its Grey Eagle Casino Station. The line will curve northwards to follow along the east side of Sarcee Trail. Westhills Station will serve the surrounding community, and another station at 17th Avenue SW will do the same while also providing a pedway connection to the West portion of the Blue Line.

• Another station at Bow Trail SW will precede the Horseshoe's northeast decent towards Edworthy Park. The line will cross the Bow River before heading east towards the Foothills Hospital. Just before 37 Street NW on the south side of 16th Avenue NW, the Horseshoe will tunnel towards its Foothills Hospital Station.

• Departing from the Foothills Hospital, the line will curve towards the northwest, aligning itself parallel West Campus Drive, emerging above ground after crossing west of the western boundary of the University Heights neighborhood. The Horseshoe will proceed towards its Childrens' Hospital/West Campus Station on the east side of West Campus Drive, before continuing on this alignment towards the intersection of Shaganappi Trail and 32nd Avenue Northwest.

• The Horseshoe will follow Shaganappi Trail NW, through its Market Mall Station, towards a new shared station with the NW portion of the Red Line, with a pedway to Northland Village Mall. The line will then continue along the east side of Shaganappi, through its Edgemont/Nosehill Park Station, before curving around the north end of Nosehill Park to align itself with Berkshire Boulevard NW.

• The Horseshoe will follow the north side of Berkshire Boulevard before tunneling under Beddington Trail NW, underneath the south tip of the Country Hills Golf Club, while placing itself on a parallel alignment with South Road NE. The Horseshoe will then follow this alignment until running along the south side of Airport Trail NE after crossing Deerfoot Trail.

• The Horseshoe will curve towards the airport terminal at 19th Street NE with stations at the current terminal's north end and at the new international terminal. The line will then curve back north back towards Airport Trail, and then east towards the Airport Tunnel.

• Once through the Airport Tunnel, the line will proceed to meet the NE portion of the Blue Line at its terminus in NE Calgary, thus completing the Horseshoe. Ultimately, this line could be extended to follow an alignment south down 100th Street E to complete a ring once it meets with the southern tip of the Horseshoe at Glenmore Trail – I guess they'd have to think of a different name at that point.

Is this impossibly expensive? Maybe. But Calgarians should get this discussion going so that plans can be laid for a clear vision of our transit future. Cable cars across the Bow River would not be anywhere near this useful. The Horseshoe would connect all existing LRT lines, 3 Hospitals, 5 Shopping Destinations, 2 Post-Secondary Institutions, the Airport and a Casino. Imagine the possibility for someone living on or near an LRT line – you could get just about anywhere in the city with one transfer. Further, the Horseshoe would promote increased inner-city densification – live in the Beltline and train out to work instead of the other way around.

What are your thoughts on the Horseshoe? Where do you think that the next LRT line should go? What purpose should it serve?
Reply With Quote
     
     
  #2  
Old Posted Mar 28, 2014, 5:39 PM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Reply With Quote
     
     
  #3  
Old Posted Mar 28, 2014, 5:48 PM
Transport Tycoon Transport Tycoon is offline
Registered User
 
Join Date: Mar 2014
Posts: 2
Maps

Here are some visuals, all using GoogleMaps:















Reply With Quote
     
     
  #4  
Old Posted Mar 28, 2014, 8:17 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by Transport Tycoon View Post
While the specific routing of the entire Southeast and North-Central LRT lines is not yet settled, we do have a general idea of where these lines will be placed and what neighborhoods and destinations they will be serving. Once the SE and NC lines are built, Calgary's LRT lines will be headed to all quadrants of the city.

So what next? Where should the next LRT line go?

What I would want to see is "The Horseshoe Line". The Horseshoe would act as a connecting line between all existing LRT lines and connect critical destinations to the existing LRT system (including the airport).

The routing of the Horseshoe would be roughly as follows:

• The initial southeast terminus would be just west of Barlow Trail SE, aligned with Glenmore Trail. This station would be shared with the SE portion of the Green Line. From there, the Horseshoe would follow Glenmore Trail, through its Deerfoot Meadows Station, until just east of Blackfoot Trail when it would tack to the north towards a 62nd Avenue SW alignment.

• Following 62nd Avenue, the Horseshoe would tunnel underneath Centre Street and the Chinook LRT Station. An underground Chinook Station (renamed Chinook East) would provide connections to the South portion of the Red Line. The tunnel would then tack back towards Glenmore Trail, with a Chinook West Station underground at the south end of Chinook Centre. The Horseshoe would reemerge above ground west of Elbow drive.

• Following along the north side of Glenmore Trail, the Horseshoe would reach its Rockyview Hospital Station at 14th Street SW (with pedway connection to the Rockyview Hospital). The Horseshoe would then turn northward and run across a dedicated bridge running parallel to the east side of the Glenmore Dam.

• Having crossed the Elbow River, the Horseshoe will curve around the east side of the Glenmore Athletic Park and then follow a 50th Avenue SW alignment to the west. This alignment will be maintained west of Crowchild Trail and onto the Mount Royal University campus towards its MRU Station.

• Continuing on the 50th Avenue SW alignment, the Horseshoe will run along the north side of Glenmore Trail after departing its Grey Eagle Casino Station. The line will curve northwards to follow along the east side of Sarcee Trail. Westhills Station will serve the surrounding community, and another station at 17th Avenue SW will do the same while also providing a pedway connection to the West portion of the Blue Line.

• Another station at Bow Trail SW will precede the Horseshoe's northeast decent towards Edworthy Park. The line will cross the Bow River before heading east towards the Foothills Hospital. Just before 37 Street NW on the south side of 16th Avenue NW, the Horseshoe will tunnel towards its Foothills Hospital Station.

• Departing from the Foothills Hospital, the line will curve towards the northwest, aligning itself parallel West Campus Drive, emerging above ground after crossing west of the western boundary of the University Heights neighborhood. The Horseshoe will proceed towards its Childrens' Hospital/West Campus Station on the east side of West Campus Drive, before continuing on this alignment towards the intersection of Shaganappi Trail and 32nd Avenue Northwest.

• The Horseshoe will follow Shaganappi Trail NW, through its Market Mall Station, towards a new shared station with the NW portion of the Red Line, with a pedway to Northland Village Mall. The line will then continue along the east side of Shaganappi, through its Edgemont/Nosehill Park Station, before curving around the north end of Nosehill Park to align itself with Berkshire Boulevard NW.

• The Horseshoe will follow the north side of Berkshire Boulevard before tunneling under Beddington Trail NW, underneath the south tip of the Country Hills Golf Club, while placing itself on a parallel alignment with South Road NE. The Horseshoe will then follow this alignment until running along the south side of Airport Trail NE after crossing Deerfoot Trail.

• The Horseshoe will curve towards the airport terminal at 19th Street NE with stations at the current terminal's north end and at the new international terminal. The line will then curve back north back towards Airport Trail, and then east towards the Airport Tunnel.

• Once through the Airport Tunnel, the line will proceed to meet the NE portion of the Blue Line at its terminus in NE Calgary, thus completing the Horseshoe. Ultimately, this line could be extended to follow an alignment south down 100th Street E to complete a ring once it meets with the southern tip of the Horseshoe at Glenmore Trail – I guess they'd have to think of a different name at that point.

Is this impossibly expensive? Maybe. But Calgarians should get this discussion going so that plans can be laid for a clear vision of our transit future. Cable cars across the Bow River would not be anywhere near this useful. The Horseshoe would connect all existing LRT lines, 3 Hospitals, 5 Shopping Destinations, 2 Post-Secondary Institutions, the Airport and a Casino. Imagine the possibility for someone living on or near an LRT line – you could get just about anywhere in the city with one transfer. Further, the Horseshoe would promote increased inner-city densification – live in the Beltline and train out to work instead of the other way around.

What are your thoughts on the Horseshoe? Where do you think that the next LRT line should go? What purpose should it serve?
The real benefit of this line lies in the SW section, the others less-so IMO. Here is what I would propose as an adjustment to your plan:

Start at Quarry Park, then connect to Deerfoot Meadows- Chinook like you described. Quarry Park has significantly better prospects as a TOD and a dense enough node to generate ridership than anywhere else in that area.

Turn north at 37th Street vs. at Sarcee, including a Stop close as possible to MRU. This allows better connection to the actual population of the SW, Sarcee is an enormous right-of-way meaning that few people could walk to the station. Limited redevelopment potential as well compared to a 37th street alignment. This also allows for a Westbrook TOD development and the quicker transfer to the NW Hub of U of C, Foothills etc.

All other parts of the route seem to add limited benefit: no redevelopment potential in the curve-linear road networks of most of the far North and NW. Would be nice for sure, but there is no way to justify the Northern half at any point in the future I think.

Great ideas though!
Reply With Quote
     
     
  #5  
Old Posted Mar 28, 2014, 8:28 PM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
Quote:
Originally Posted by MasterG View Post
The real benefit of this line lies in the SW section, the others less-so IMO. Here is what I would propose as an adjustment to your plan:

Start at Quarry Park, then connect to Deerfoot Meadows- Chinook like you described. Quarry Park has significantly better prospects as a TOD and a dense enough node to generate ridership than anywhere else in that area.

Turn north at 37th Street vs. at Sarcee, including a Stop close as possible to MRU. This allows better connection to the actual population of the SW, Sarcee is an enormous right-of-way meaning that few people could walk to the station. Limited redevelopment potential as well compared to a 37th street alignment. This also allows for a Westbrook TOD development and the quicker transfer to the NW Hub of U of C, Foothills etc.

All other parts of the route seem to add limited benefit: no redevelopment potential in the curve-linear road networks of most of the far North and NW. Would be nice for sure, but there is no way to justify the Northern half at any point in the future I think.

Great ideas though!
Agree with this .. Excellent idea overall for the long term (who knows how the City will look like 50 years from now) but that inner city SW portion would be the most benficial

Major stops starting at Quarry Park to Chinook, Rockyview Hospital, MRU would be most beneficial .. Maybe extending the line across the river to the Foothills hospital to reconnect with NW line

In the long term I hope they invest in more a streetcar type transit system to improve getting around the Beltline, East Village, and West Village so that there can be fewer buses to help other vehicles to get around while providing an efficient transit option for residents to get around the core

The density in the Beltline and core is really increasing so I feel like the City should start planning accordingly to reduce the need for personal vehicles while trying to improve transit efficiency in the area
Reply With Quote
     
     
  #6  
Old Posted Mar 29, 2014, 12:41 AM
andasen andasen is offline
Registered User
 
Join Date: Feb 2012
Location: Calgary
Posts: 227
Quote:
Originally Posted by H.E.Pennypacker View Post
Agree with this .. Excellent idea overall for the long term (who knows how the City will look like 50 years from now) but that inner city SW portion would be the most benficial

Major stops starting at Quarry Park to Chinook, Rockyview Hospital, MRU would be most beneficial .. Maybe extending the line across the river to the Foothills hospital to reconnect with NW line

In the long term I hope they invest in more a streetcar type transit system to improve getting around the Beltline, East Village, and West Village so that there can be fewer buses to help other vehicles to get around while providing an efficient transit option for residents to get around the core

The density in the Beltline and core is really increasing so I feel like the City should start planning accordingly to reduce the need for personal vehicles while trying to improve transit efficiency in the area
I really don't see it serving Chinook. I personally see the Heritage area being a lot more serviceable and the area's long term plans are a lot more condusive to being a node. Remember one of the biggest reasons Chinook is a massive transfer point is the 23 terminating there. I really don't see it being the natural transfer point with the industrial-Highway dead space along glenmore. Chinook mall will remain as a major destination and a short transfer to Chinook isn't going cramp anyone too much. When the SE line opens, much the SE traffic will be diverted. If chinook loses the 23, 36, 41 and 136 that is a pretty big hit to its transfer traffic. Heritage is much more natural a transfer station serving with connections to Rockyview and Deerfoot Meadows being particularly easy. (well Deerfoot meadows once they actually extend either the 306 or 20 to quarry park)
Reply With Quote
     
     
  #7  
Old Posted Mar 29, 2014, 1:27 AM
*Stardust* *Stardust* is offline
Registered User
 
Join Date: Apr 2012
Location: Alberta
Posts: 1,062
How about a downtown/inner city circular line? That has stops in the different districts. A station that connects Connaught, Victoria Park, Inglewood, East Village, Eau Claire, West End back to Connaught?
Reply With Quote
     
     
  #8  
Old Posted Mar 29, 2014, 2:04 AM
sim sim is offline
Registered User
 
Join Date: Aug 2008
Posts: 863
Am I seeing a circle line there? Another suburban circle line proposal... Sigh.

This is just so infeasible that I wonder if there is even merit in having it as a thought activity. If you can somehow convince the politicians and the populace who they represent to have across the board paid parking or implement a significant congestion charge, and increase the city's current density by about 5 fold, this thought might actually be worth entertaining.

Until then let's just forget about circle lines, because they plain and simply won't work here.

Last edited by sim; Mar 29, 2014 at 2:19 AM.
Reply With Quote
     
     
  #9  
Old Posted Mar 31, 2014, 12:56 PM
lorenavedon lorenavedon is offline
Registered User
 
Join Date: Sep 2013
Posts: 108
Quote:
Originally Posted by sim View Post
Am I seeing a circle line there? Another suburban circle line proposal... Sigh.

This is just so infeasible that I wonder if there is even merit in having it as a thought activity. If you can somehow convince the politicians and the populace who they represent to have across the board paid parking or implement a significant congestion charge, and increase the city's current density by about 5 fold, this thought might actually be worth entertaining.

Until then let's just forget about circle lines, because they plain and simply won't work here.
monorail
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:39 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.