HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #5581  
Old Posted Aug 23, 2017, 7:26 PM
msmariner msmariner is offline
Registered User
 
Join Date: Apr 2012
Location: Calgary
Posts: 441
Quote:
Originally Posted by MalcolmTucker View Post
There are no examples of a diverging stack built anywhere in the world. It was only patented in 2015 as the Double Crossover Merging Interchange.
Your correct that none have been built. Though I do remember an early rendering from the city being a DCMI.. this version is much cheaper and quite effective in my opinion
Reply With Quote
     
     
  #5582  
Old Posted Aug 23, 2017, 8:20 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,439
The original 7 investigated options:
Reply With Quote
     
     
  #5583  
Old Posted Aug 31, 2017, 6:37 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Electronic signage on ramp from SB Stoney to EB TCH at Winsport this morning says 'Construction Complete, Thank You!'. This pertains to the Bowfort interchange and while construction is essentially complete they are still doing finishing touches on landscaping, signage etc. and naturally the construction speed limit is still 50.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
Reply With Quote
     
     
  #5584  
Old Posted Aug 31, 2017, 6:57 PM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,753
^They still have to install the other half of the "artwork" on the north side too - right ?
Why put a sign up saying "Construction Complete" when the speed limit is still 50?
Reply With Quote
     
     
  #5585  
Old Posted Aug 31, 2017, 9:30 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by craner View Post
^They still have to install the other half of the "artwork" on the north side too - right ?
Why put a sign up saying "Construction Complete" when the speed limit is still 50?
Exactly my thoughts too. Technically the interchange is officially open to pretty much all the final traffic movements but until the last piece of equipment is gone from the site, ALL the roadway construction is complete, and the construction signs come down then they shouldn't really be saying it is complete.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
Reply With Quote
     
     
  #5586  
Old Posted Aug 31, 2017, 10:39 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
Quote:
Originally Posted by craner View Post
Why put a sign up saying "Construction Complete" when the speed limit is still 50?
50kph is vastly better than when the light was there and traffic averaged 5kph.
Reply With Quote
     
     
  #5587  
Old Posted Sep 1, 2017, 12:04 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,753
^ I'm not complaining about the 50km speed limit but they shouldn't have a sign saying "Construction Complete" when it is still a construction zone.
Reply With Quote
     
     
  #5588  
Old Posted Sep 6, 2017, 6:43 PM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,753
^Very cool.
Did you just stumble across that doing some research ?
Reply With Quote
     
     
  #5589  
Old Posted Sep 7, 2017, 12:55 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,499
And 49 years later we still have the legacy of that abomination of an interchange, they'd have been kinder to us if they'd built nothing. Literally the worst piece of road infrastructure I have ever seen, save for maybe some of the stuff in Edmonton. Surely in the 60's they had some idea of what worked and what didn't with roads?
Reply With Quote
     
     
  #5590  
Old Posted Sep 7, 2017, 1:08 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,499
On a more positive note, work should be starting soon to help fix that past mistake.

Crowchild Trail Study: short-term recommended plan


The bridge widening is supposed to start in the fall. This will massively improve northbound and southbound traffic flow.
Reply With Quote
     
     
  #5591  
Old Posted Sep 7, 2017, 2:01 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by milomilo View Post
And 49 years later we still have the legacy of that abomination of an interchange, they'd have been kinder to us if they'd built nothing. Literally the worst piece of road infrastructure I have ever seen, save for maybe some of the stuff in Edmonton. Surely in the 60's they had some idea of what worked and what didn't with roads?
Totally agree. No mention in the article about what happened when the Chief was heading east on Bow and wanted to go south on Crowchild...
Reply With Quote
     
     
  #5592  
Old Posted Sep 7, 2017, 2:58 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,499
Quote:
Originally Posted by Acey View Post
Edmonton's roads are also a joke, but there's no single interchange in Edmonton as embarrassing and detrimental to the overall road system as Crow/Bow is to Calgary's. Instead, Edmonton just carries its traffic on surface streets and lacks interchanges, period.
I haven't spent too much time in Edmonton to savour its road delights so I'm glad you don't have anything quite so bad, but there were a few places that had a very similar 'feel' to Calgary's worst examples - lots of the approaches to bridges crossing the river for example, and the interchange of Whitemud and Terwillegar. They might not even necessarily function too badly (I wouldn't know), but they just annoy me with their needless complexity and ramps splitting off everywhere.
Reply With Quote
     
     
  #5593  
Old Posted Sep 8, 2017, 4:51 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,753
Quote:
Originally Posted by milomilo View Post
On a more positive note, work should be starting soon to help fix that past mistake.

Crowchild Trail Study: short-term recommended plan


The bridge widening is supposed to start in the fall. This will massively improve northbound and southbound traffic flow.
Yayy!
Such a painfully long timeframe for the full Crowchild 24th NW to 17th SW upgrades though.
Reply With Quote
     
     
  #5594  
Old Posted Sep 8, 2017, 3:46 PM
technomad technomad is offline
BANNED
 
Join Date: Apr 2011
Location: Alberia
Posts: 858
Getting the mid-range plans for completing Crowchild to freeway spec going would sure be a great 50th birthday present..
Reply With Quote
     
     
  #5595  
Old Posted Sep 13, 2017, 8:23 PM
Mazrim's Avatar
Mazrim Mazrim is offline
Registered User
 
Join Date: Aug 2009
Location: Calgary, Alberta
Posts: 1,403
From what I've been told, expect whoever wins the Crowchild work to be starting in late October or early November. It sounds like the schedule is pretty aggressive.
Reply With Quote
     
     
  #5596  
Old Posted Sep 14, 2017, 4:32 PM
kap384's Avatar
kap384 kap384 is offline
Littering and............
 
Join Date: Mar 2008
Posts: 512
Thumbs up

Quote:
Originally Posted by Mazrim View Post
From what I've been told, expect whoever wins the Crowchild work to be starting in late October or early November. It sounds like the schedule is pretty aggressive.
Great news!
Reply With Quote
     
     
  #5597  
Old Posted Sep 14, 2017, 9:37 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
Wrong thread.
Reply With Quote
     
     
  #5598  
Old Posted Sep 14, 2017, 10:02 PM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by DoubleK View Post
Wrong thread.
How is it the wrong forum?
Reply With Quote
     
     
  #5599  
Old Posted Oct 20, 2017, 4:49 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,499
Nice. $87 million seems like great value for the massive improvement this will bring. I'm glad my commute doesn't involve Crowchild for the next two years though!
Reply With Quote
     
     
  #5600  
Old Posted Oct 20, 2017, 6:26 PM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by milomilo View Post
Nice. $87 million seems like great value for the massive improvement this will bring. I'm glad my commute doesn't involve Crowchild for the next two years though!
$87 million is definitely a lot less than the inflated amounts John Mar and Druh bandied about the last time in their attempts to kill this project. One thing that I will hate with a passion is the artificially low speed limits they will impose for probably the next three years. This project is going to impact me a lot as the alternate routes are too far away to be useful unless there's also a major accident.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:36 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.