  #1041  
Old Posted Oct 29, 2017, 6:35 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Yes, some real progress over the past month.

The overpass at Old Pennywell is now paved and they have built up the road-approach on both sides. The bypass is no longer in use. Looks like they will pave the approaches soon.

At the Redmond's Road, the overpass has also been paved (it's a really wide overpass, 5 lanes maybe?) and a new on-ramp has been constructed and has paving-gravel installed. There's a brand-new paving machine and rollers, etc parked at that site, so maybe some paving soon, although not for the TGH itself, and not likely this year.
Reply With Quote
     
     
  #1042  
Old Posted Oct 30, 2017, 3:02 PM
statbass statbass is offline
Registered User
 
Join Date: May 2011
Location: St. John's
Posts: 1,650
Quote:
Originally Posted by rthomasd View Post
Yes, some real progress over the past month.

The overpass at Old Pennywell is now paved and they have built up the road-approach on both sides. The bypass is no longer in use. Looks like they will pave the approaches soon.

At the Redmond's Road, the overpass has also been paved (it's a really wide overpass, 5 lanes maybe?) and a new on-ramp has been constructed and has paving-gravel installed. There's a brand-new paving machine and rollers, etc parked at that site, so maybe some paving soon, although not for the TGH itself, and not likely this year.
Good to hear that some significant progress has been made over the past couple months.
Reply With Quote
     
     
  #1043  
Old Posted Oct 31, 2017, 3:14 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 457
Old Pennywell October 30th







Reply With Quote
     
     
  #1044  
Old Posted Nov 1, 2017, 1:47 AM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 211
Good progress on this overpass since I was there about a week and a half ago.

Now if only they could have this level of activity throughout the WHOLE construction season we might have a highway to drive on next fall - as far as Topsail Road anyway.
Reply With Quote
     
     
  #1045  
Old Posted Nov 21, 2017, 12:40 PM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 211
From The Telegram, here's the best visual update on Team Gushue Highway I've seen.

http://www.thetelegram.com/news/dron...pening-163573/
Reply With Quote
     
     
  #1046  
Old Posted Nov 21, 2017, 1:55 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
The article claims that the section from Kenmount to Topsail Rd will be open next summer ! I think that's an assumption based on the Topsail Rd Overpass construction signs that say expect delays till Summer 2018 - that doesn't mean the road will be open then, only that the overpass delays will be over.

That's a lot of work to be done in a few months - there's no pad yet for the Sobey's Sq over/underpass so how's an over/underpass to get completed in less than a season when all the others have taken two (or more) full construction seasons? More likely end of 2019 around election time.

Work continues on the roadbed for the collector road to Penneywell, drilling/blasting ongoing. The Roundabout at Redmonds/Empire/Blackmarsh is progressing, looked like it was ready for pavement but they are now installing culverts and cisterns and have dug up a lot of the roundabout. I think the asphalt plants close in a couple of weeks so not likely any pavement there this year.
Reply With Quote
     
     
  #1047  
Old Posted Nov 21, 2017, 2:11 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,184
Quote:
Originally Posted by Offshore1 View Post
From The Telegram, here's the best visual update on Team Gushue Highway I've seen.

http://www.thetelegram.com/news/dron...pening-163573/
Nice video...but just looking at how much work was required just to put a small strip of highway in that location...one wonders if there were not any alternative routes that would have required less blasting and overpasses...
Reply With Quote
     
     
  #1048  
Old Posted Nov 21, 2017, 2:39 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,184
Quote:
Originally Posted by rthomasd View Post
The article claims that the section from Kenmount to Topsail Rd will be open next summer ! I think that's an assumption based on the Topsail Rd Overpass construction signs that say expect delays till Summer 2018 - that doesn't mean the road will be open then, only that the overpass delays will be over.

That's a lot of work to be done in a few months - there's no pad yet for the Sobey's Sq over/underpass so how's an over/underpass to get completed in less than a season when all the others have taken two (or more) full construction seasons? More likely end of 2019 around election time.

Work continues on the roadbed for the collector road to Penneywell, drilling/blasting ongoing. The Roundabout at Redmonds/Empire/Blackmarsh is progressing, looked like it was ready for pavement but they are now installing culverts and cisterns and have dug up a lot of the roundabout. I think the asphalt plants close in a couple of weeks so not likely any pavement there this year.
Would they really need the Topsail Rd over/underpass to be completed for Topsail Rd-TGH access though? All you really need is the on/off-ramping completed to Topsail Rd. Though even that looks like it's going to require it's own separate small over/underpass.
Reply With Quote
     
     
  #1049  
Old Posted Nov 21, 2017, 2:42 PM
statbass statbass is offline
Registered User
 
Join Date: May 2011
Location: St. John's
Posts: 1,650
Quote:
Originally Posted by goodgrowth View Post
Nice video...but just looking at how much work was required just to put a small strip of highway in that location...one wonders if there were not any alternative routes that would have required less blasting and overpasses...
Thanks for posting the aerial video of the TG extension, Offshore. As for alternate routes - there was definitely a lot of blasting done here, but I don't think there was any way around it. Kenmount hill runs pretty much the entire length of Kenmount Rd so I don't think you'd get around that. Any further east or west and you'd pretty much be running through residential areas. This place is just to hilly and rocky!

Just imagine how simply things would be if we had the same geography as Alberta (east of the Rockies) or Saskatchewan.
Reply With Quote
     
     
  #1050  
Old Posted Nov 21, 2017, 3:46 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
The Sobey's Sq under/overpass is a small one, the same size as the Old Pennywell Rd and Blackmarsh Rd but it took two years for both of them. Since they are putting in the major overpass at Topsail Rd, they must be going to use it so even a temp on/off ramp would have to be removed shortly. I would expect the on-ramp at Topsail Rd would be very busy.
Reply With Quote
     
     
  #1051  
Old Posted Nov 21, 2017, 5:52 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 457
Quote:
Originally Posted by rthomasd View Post
The article claims that the section from Kenmount to Topsail Rd will be open next summer ! I think that's an assumption based on the Topsail Rd Overpass construction signs that say expect delays till Summer 2018 - that doesn't mean the road will be open then, only that the overpass delays will be over.

That's a lot of work to be done in a few months - there's no pad yet for the Sobey's Sq over/underpass so how's an over/underpass to get completed in less than a season when all the others have taken two (or more) full construction seasons? More likely end of 2019 around election time.

Work continues on the roadbed for the collector road to Penneywell, drilling/blasting ongoing. The Roundabout at Redmonds/Empire/Blackmarsh is progressing, looked like it was ready for pavement but they are now installing culverts and cisterns and have dug up a lot of the roundabout. I think the asphalt plants close in a couple of weeks so not likely any pavement there this year.
I wondered about the roundabout as well. Saw it today.
Almost seems like an afterthought to start digging after the fine crushed stone was applied. I really hope they are not that disorganized!

Reply With Quote
     
     
  #1052  
Old Posted Nov 22, 2017, 1:00 AM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Well, it would be entirely in-character for the City to have approved the roundabout and then wanted culverts, etc after it was built. Some of Danny's criticisms of City Hall aren't far off the mark.
Reply With Quote
     
     
  #1053  
Old Posted Nov 23, 2017, 4:13 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Normally I want e-maps ( GPS, Google, etc) to be as accurate as possible BUT someone decided that the TGH extension is available for use and my Garmin GPS now wants me to turn here or there onto the new TGH extension whenever I'm passing an on/off ramp such as Topsail Rd, Blackmarsh Rd, Kenmount Rd.
Reply With Quote
     
     
  #1054  
Old Posted Nov 27, 2017, 5:29 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 457
YYT Apron after Expansion

Found this deep in the airport site.

Reply With Quote
     
     
  #1055  
Old Posted Dec 14, 2017, 3:28 PM
djslue djslue is offline
Registered User
 
Join Date: Nov 2015
Posts: 83
Just seen online that Yellow Belly and The Newfoundland Chocolate Company will be going into the new East expansion at the Airport

More info http://stjohnsairport.com/wp-content...nouncement.pdf
Reply With Quote
     
     
  #1056  
Old Posted Dec 14, 2017, 3:36 PM
J_Murphy's Avatar
J_Murphy J_Murphy is offline
Registered User
 
Join Date: Mar 2012
Location: St. John's, NL
Posts: 1,295
Quote:
Originally Posted by djslue View Post
Just seen online that Yellow Belly and The Newfoundland Chocolate Company will be going into the new East expansion at the Airport

More info http://stjohnsairport.com/wp-content...nouncement.pdf
That is awesome. Glad they are going with two local brands.
Reply With Quote
     
     
  #1057  
Old Posted Jan 5, 2018, 12:27 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,184
May have already mentioned/complained about this before but: Is there any plan of ever getting lights on the ORR? It seems crazy to me that a busy highway within the metro area doesn't have lighting. You're just driving along @100km+/hr in the dark on this busy highway with a bunch of off/on ramping in an area with 200K people where essentially every road has lights....except this major high-speed one. It just seems weird and wrong.

Last edited by goodgrowth; Jan 5, 2018 at 2:02 PM.
Reply With Quote
     
     
  #1058  
Old Posted Jan 5, 2018, 1:54 PM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 211
Quote:
Originally Posted by goodgrowth View Post
May have already mentioned/complained about this before but: Is there any plan of ever getting lights on the ORR? It seems crazy to me that a busy highway within the metro area doesn't have lighting. You're just driving along @100km+/hr in the dark on this busy highway with a bunch of off/on ramping in an area with 200K people where essentially every road has lights....expect this major high-speed one. It just seems weird and wrong.
I've never heard of a plan to install lighting on the ORR, but it would be a good idea. Maybe it would reduce the number of moose/vehicle collisions?
Reply With Quote
     
     
  #1059  
Old Posted Jan 5, 2018, 2:26 PM
colinpeddle colinpeddle is offline
Registered User
 
Join Date: Feb 2013
Posts: 134
IIRC whether or not there's lighting on a highway is determined by its proximity to a residential/commercial area, it's why there is lighting on the highway near Stavanger.

I say "residential/commercial" area but I'm pretty certain it's commercial, not residential that qualifies an area for lighting.

I could be wrong on all of that.

Huge cost but what a difference it would make. In my opinion the ORR and PMD and the CBS bypass, at least till you hit the end of the divided highway, should all be lit. At this point I don't know where the money would come from...
Reply With Quote
     
     
  #1060  
Old Posted Jan 5, 2018, 3:39 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,184
Quote:
Originally Posted by colinpeddle View Post
IIRC whether or not there's lighting on a highway is determined by its proximity to a residential/commercial area, it's why there is lighting on the highway near Stavanger.

I say "residential/commercial" area but I'm pretty certain it's commercial, not residential that qualifies an area for lighting.

I could be wrong on all of that.

Huge cost but what a difference it would make. In my opinion the ORR and PMD and the CBS bypass, at least till you hit the end of the divided highway, should all be lit. At this point I don't know where the money would come from...
Should be based on traffic rather than proximity. Yes some areas of the ORR are not running directly through residential/commercial areas but that doesn't mean the traffic is low. I get that there are costs but this isn't some low-speed rural backroad that nobody is using...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > St. John's
Forum Jump



Forum Jump


All times are GMT. The time now is 11:52 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.