Old Posted Feb 13, 2018, 11:22 PM
Fvn Fvn is offline
Registered User
 
Join Date: Nov 2017
Posts: 694
Quote:
Originally Posted by KWillChicago View Post
Glass????? We're waiting.
By the looks of it a work platform (Idk what else it could be) has been installed on the 2 south and the 1 north external shearwalls, cladding will come soon!
Reply With Quote
     
     
  #3182  
Old Posted Feb 14, 2018, 3:40 AM
Bombardier Bombardier is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago, IL
Posts: 467
^I heard today from a friend that they would not have glass until August. Seems like the window consultant for both this and One Grant Park are the same and has a tendency to move the goal posts which has made passing the performance mockup difficult. This is creating significant contractual issues with the window contractors which is why the glass contractor on OBP was replaced. Seems like McHugh building structures with no glass is a pattern. WPW, Mila, OGP, Vista...
Reply With Quote
     
     
  #3183  
Old Posted Feb 14, 2018, 3:44 AM
Alanky Alanky is offline
Registered User
 
Join Date: Feb 2017
Posts: 11
Glass

The director at the sales center stated glass would be installed later this month. She was accurate about a new web cam installation so I suspect she is reliable about this information also.
Reply With Quote
     
     
  #3184  
Old Posted Feb 14, 2018, 3:51 AM
aaron38's Avatar
aaron38 aaron38 is offline
312
 
Join Date: Mar 2006
Location: Palatine
Posts: 4,131
It's 3D printing writ large. Such a joy to watch.
Reply With Quote
     
     
  #3185  
Old Posted Feb 14, 2018, 3:56 AM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 3,101
I quite like seeing the hulking mass of concrete continue to grow. We're getting our very own Ryugyong Hotel. The brutalist concrete structure just amplifies the magnitude of the tower. Once the glass starts up it'll look less imposing. I'm OK with this trade-off for the time being.
Reply With Quote
     
     
  #3186  
Old Posted Feb 14, 2018, 10:47 AM
KWillChicago's Avatar
KWillChicago KWillChicago is offline
Registered User
 
Join Date: Mar 2015
Location: Chicago
Posts: 1,115
I was thinking the same thing about it looking like the ryugyung hotel. This one being much more bulky though. The last one we had was 111 wacker.The sooner the glass, the bigger sigh of relief. Easy everybody, I'm not trying to start a long three page discussion of the fonance of vista. Haha.
Vistas concrete seems much darker than other rises going up currently. Im sure it has to do with the thickness, weight sustainability, curing process and many other factors. Or maybee its just because weve had a wet and rainy winter.
Reply With Quote
     
     
  #3187  
Old Posted Feb 14, 2018, 3:19 PM
Skyguy_7 Skyguy_7 is offline
BANNED
 
Join Date: Dec 2012
Location: Chicago
Posts: 2,657
McHugh is one hell of a GC, they just have a lot on their plate I'm guessing. Tishman, on the other hand, runs a very tight ship. Granted this is steel vs concrete at Vista, the Glass at 1 Manhattan West is keeping pace 4 levels below fireproofing.

Last edited by Tom In Chicago; Feb 14, 2018 at 7:22 PM.
Reply With Quote
     
     
  #3188  
Old Posted Feb 14, 2018, 3:23 PM
Notyrview Notyrview is offline
BANNED
 
Join Date: Dec 2012
Location: New York City
Posts: 1,648
Quote:
Originally Posted by Alanky View Post
The director at the sales center stated glass would be installed later this month. She was accurate about a new web cam installation so I suspect she is reliable about this information also.
Excellent.

^ cool shot of HY. i've noticed that core sticking up lately but so it goes w steel. same thing happened with 300 N LaSalle.
Reply With Quote
     
     
  #3189  
Old Posted Feb 14, 2018, 8:44 PM
kayosthery kayosthery is offline
Registered User
 
Join Date: Oct 2005
Posts: 301
Quote:
Originally Posted by Fvn View Post
By the looks of it a work platform (Idk what else it could be) has been installed on the 2 south and the 1 north external shearwalls, cladding will come soon!
That is exactly what they are. They are essentially the same systems as the platforms climbing ahead to form / pour the shearwalls, reusing the same anchor points. Except instead of working on the forms from the top platform, the window installer will work from the lowest trailing level installing the glass.
__________________
Paper is fine, nerf Rock. Signed - Scissors.
Reply With Quote
     
     
  #3190  
Old Posted Feb 16, 2018, 3:12 PM
phanta721 phanta721 is online now
Registered User
 
Join Date: Jan 2007
Location: Chicago-ish
Posts: 58
1/16/18

Reply With Quote
     
     
  #3191  
Old Posted Feb 16, 2018, 3:17 PM
F1 Tommy's Avatar
F1 Tommy F1 Tommy is offline
Registered User
 
Join Date: Feb 2007
Posts: 1,054
They did 2 floors during the last 8 days on the main section. Considering the weather last week was the worst it's been in 3 years that's pretty good.
Reply With Quote
     
     
  #3192  
Old Posted Feb 16, 2018, 4:15 PM
Chi-Sky21 Chi-Sky21 is offline
Registered User
 
Join Date: Jul 2013
Location: Chicago
Posts: 1,286
Its going to start poking its head above the surrounding buildings soon, cant wait to watch this all summer!
Reply With Quote
     
     
  #3193  
Old Posted Feb 16, 2018, 7:42 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,450
The cranes are already visible from Kennedy, the superstructure should be making it's presence known from many angles by early summer.
Reply With Quote
     
     
  #3194  
Old Posted Feb 17, 2018, 8:26 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,832
The bare exposed wall in post #3207 that is visible, will that be covered up (windows) or remain as?
Reply With Quote
     
     
  #3195  
Old Posted Feb 17, 2018, 8:49 PM
HowardL's Avatar
HowardL HowardL is offline
Registered User
 
Join Date: Jun 2003
Location: East Lakeview, Chicago
Posts: 1,180
Quote:
Originally Posted by chris08876 View Post
The bare exposed wall in post #3207 that is visible, will that be covered up (windows) or remain as?
Covered up by the GEMS Upper School.
Reply With Quote
     
     
  #3196  
Old Posted Feb 17, 2018, 9:19 PM
Bombardier Bombardier is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago, IL
Posts: 467
^I think it would have originally, but they reduced the height from 16 to 13. I think you will see some of that wall now.
https://chicago.curbed.com/2018/2/9/...y-upper-school
Reply With Quote
     
     
  #3197  
Old Posted Feb 17, 2018, 10:07 PM
left of center's Avatar
left of center left of center is offline
1st Ward
 
Join Date: Sep 2006
Location: The Big Onion
Posts: 2,570
I don't see why they wouldn't cover the concrete up with windows/curtain wall. This is a (if not the) trophy tower of the LSE megaproject. Having 3 floors of painted concrete would really look out of place, and hopefully the developers agree.
Reply With Quote
     
     
  #3198  
Old Posted Feb 18, 2018, 1:42 AM
Kumdogmillionaire's Avatar
Kumdogmillionaire Kumdogmillionaire is offline
Development Shill
 
Join Date: Nov 2015
Location: San Antonio
Posts: 1,136
I had just kind of assumed it had something to do with firecode.... I guess they can always mural it lol
__________________
For you - Bane
Reply With Quote
     
     
  #3199  
Old Posted Feb 19, 2018, 6:22 PM
ChiTownWonder's Avatar
ChiTownWonder ChiTownWonder is offline
Registered User
 
Join Date: Jun 2014
Location: New Orleans
Posts: 618
I can't imagine them leaving it there, I would think it would be worth the extra money to cover it up and have the tower look 100% whole and thought out
Reply With Quote
     
     
  #3200  
Old Posted Feb 21, 2018, 5:21 AM
HiRiser HiRiser is offline
Registered User
 
Join Date: Nov 2014
Posts: 193
Quote:
Originally Posted by Bombardier View Post
^I heard today from a friend that they would not have glass until August. Seems like the window consultant for both this and One Grant Park are the same and has a tendency to move the goal posts which has made passing the performance mockup difficult. This is creating significant contractual issues with the window contractors which is why the glass contractor on OBP was replaced. Seems like McHugh building structures with no glass is a pattern. WPW, Mila, OGP, Vista...
Wow, the structure is already miles ahead of where the curtainwall should be. If not commencing till August that will put the structure another 6 months ahead, around another 40+ floors from where it is now...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 3:19 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.