Saskatoon | Children's Hospital of Saskatchewan | U/C

Hello All,

Figured since this thread hasn't started yet I would get it going (Kind of Surprised it hasn't been started yet)

North Elevation...



Overall...



Here is the webcam...

http://www.earthcam.net/projects/chi...fsaskatchewan/

I will add some pics from earlier this fall of the demo and piling as well in a while.

https://regionreporter.wordpress.com...gets-underway/
Reply With Quote
     
     
  #2  
Old Posted Dec 18, 2014, 2:20 AM
sask1982's Avatar
sask1982 sask1982 is offline
Registered User
 
Join Date: Sep 2002
Location: Regina, Saskatchewan
Posts: 910
Thumbs up

Kudos for starting a thread, and thx for posting the webcam link!
Reply With Quote
     
     
  #3  
Old Posted Dec 21, 2014, 8:12 PM
njaohnt njaohnt is offline
Registered User
 
Join Date: Mar 2014
Location: Winnipeg
Posts: 126
Fixing problems instead of finding the cause.
Reply With Quote
     
     
  #4  
Old Posted Dec 22, 2014, 5:33 AM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by njaohnt View Post
Fixing problems instead of finding the cause.
Reply With Quote
     
     
  #5  
Old Posted Dec 22, 2014, 2:15 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by njaohnt View Post
Fixing problems instead of finding the cause.
I am puzzled as well...
Reply With Quote
     
     
  #6  
Old Posted Dec 22, 2014, 11:59 PM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 586
I think part of what he's getting at is that we're going for bells and whistles; sexy versus practical; political win versus what's really needed.

I forget what study it is, but it's often quoted, health care (hospitals, etc) only account for 22% of healthy solutions. The greatest impact on health is education at 28% but incrementally improving our education system isn't as flashy as building a children's hospital.
Reply With Quote
     
     
  #7  
Old Posted Jan 23, 2015, 3:55 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Reply With Quote
     
     
  #8  
Old Posted May 20, 2015, 3:56 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
BID RESULTS
Graham - 218,975,000.00
PCL - 225,249,000.00
EllisDon - 232,540,000.00
Reply With Quote
     
     
  #9  
Old Posted May 20, 2015, 4:23 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,229
Quote:
Originally Posted by dsmmace View Post
BID RESULTS
Graham - 218,975,000.00
PCL - 225,249,000.00
EllisDon - 232,540,000.00
What is not included in that? I assume there are soft costs and foundation costs already incurred.
Reply With Quote
     
     
  #10  
Old Posted Jun 9, 2015, 2:46 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
You guys should be a lot more excited about this project, the site planning and logistics are quite complex being that a 7 floor building being built between a Parkade and the existing hospital! Two tower cranes and two concrete placing booms will be onsite. I believe this will be the first project in Saskatchewan to have more than stationary concrete pump. This is quite an exciting project!
Reply With Quote
     
     
  #11  
Old Posted Jun 9, 2015, 3:00 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,246
I'm sure I'll be more excited once those cranes are up....

Children's hospital construction could start in July

By Jonathan Charlton, The StarPhoenix June 9, 2015



Quote:
Construction on the main building of the Children's Hospital of Saskatchewan is on track to start in July.

After a three-week extension to the tendering period, planners are now reviewing three bids, project director Craig Ayers said.

They plan to make a recommendation to the Saskatoon Health Region and Ministry of Health by the end of June, and it won't take long for the successful contractor to mobilize, he said. The foundation was finished on schedule in March.

Each bid includes alternatives that would increase or decrease the cost of the project, he said. The site itself is also a factor - it's located between Royal University Hospital and the parking structure, and contractors are constrained in their ability to lay down materials.

"Given the complexity of the project, there's actually a fair number of items that need to be reviewed to make a recommendation on whether those alternative prices will be adopted," Ayers said.

The total budget for the hospital is just under $260 million, with $235 million coming from the provincial government.

Ayers wouldn't speculate on a final price tag and couldn't comment on the bids, but said the $260-million budget is a hard limit.

"What we're doing is, we're trying to work through to review these alternates to do the best job we can to get as close as possible to that approved budget."

The hospital is forecast to be completed by the end of 2017.

© Copyright (c) The StarPhoenix
http://www.thestarphoenix.com/news/s...314/story.html
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-23]
Reply With Quote
     
     
  #12  
Old Posted Jun 9, 2015, 6:24 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by dsmmace View Post
You guys should be a lot more excited about this project, the site planning and logistics are quite complex being that a 7 floor building being built between a Parkade and the existing hospital! Two tower cranes and two concrete placing booms will be onsite. I believe this will be the first project in Saskatchewan to have more than stationary concrete pump. This is quite an exciting project!
This is a wonderful project for Saskatchewan kids - and it's about time! It's just likely that not everyone here is overly fanatical about it.

Great project though!
Reply With Quote
     
     
  #13  
Old Posted Jun 10, 2015, 10:28 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,488
It IS a good project for the province, BUT....Should have been an extension of the City Hospital with the Children's Museum and redeveloped Kinsmen Park for family and kids right next door with beautiful green space for families with children in the hospital to enjoy....just saying....
Reply With Quote
     
     
  #14  
Old Posted Jul 22, 2015, 3:04 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,246
Children's hospital delayed
Scheduled to open in 2018

By Janet French, The StarPhoenix July 22, 2015

Quote:
Delays have pushed back the opening of the new Children's Hospital of Saskatchewan into 2018, the project director says.

Although the Saskatoon Health Region had initially hoped to award the contract for the estimated $260-million hospital by early July, that announcement likely won't happen until September, project director Craig Ayers said Tuesday.

Thanks to the holdup, construction likely won't start until mid-September, Ayers said. The region had hoped workers would be back on the site this month.

"Certainly, we're reminded of the complexity of the project and all the details," Ayers said.

In the spring, when the health region was finalizing the building's blueprints for tender, engineers pressed administrators for extra time to make sure the drawings were accurate and complete, Ayers said.

"(It's) in the best interest of the project we're doing things right."

Then, the bidders asked for three more weeks to turn in their proposals.

Although the team evaluating bids from the three finalists had initially said it would choose a winning bidder within 60 days, it extended that period to 105 days, Ayers said.

The evaluation team includes people from the health region, the provincial Health Ministry, the children's hospital management team and the prime architect, and is overseen by a "fairness monitor," Ayers said.

"They're going to start the construction later. But in the overall interest of the project, we'd suggest this is time well spent to make sure that we're doing things right."

The region has $258.9 million available to build the facility adjacent to Royal University Hospital. Ayers wouldn't say whether the three bids received are higher, lower or on budget. The region will release a specific price and construction schedule when it reveals the winning bidder in September, he said.

[....]
http://www.thestarphoenix.com/health...581/story.html
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-23]
Reply With Quote
     
     
  #15  
Old Posted Apr 22, 2016, 7:24 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,488
Construction 10% complete...seems like it should be further along, but they say on schedule.

http://thestarphoenix.com/news/local...-cent-complete
Reply With Quote
     
     
  #16  
Old Posted Apr 22, 2016, 8:30 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
^ Thx for the update..changes made to thread title...
Reply With Quote
     
     
  #17  
Old Posted Apr 24, 2017, 9:09 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Update:



EarthCam
>>> http://www.earthcam.net/projects/chi...fsaskatchewan/


Sask. Does webcams right....


Quote:
Construction 53% complete.......
Construction completion remains on schedule and the $285.2 million project remains on budget. The hospital is currently scheduled to open in late 2019.
https://www.saskatoonhealthregion.ca/chs
__________________
♥ ♥
Reply With Quote
     
     
  #18  
Old Posted Apr 26, 2017, 1:28 AM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,246
Quite an imposing presence on the riverbank, and highly visible too -- all the way from the Buckwold Bridge to the south, and Circle Drive Bridge to the north. Beats looking at the brutalist wing of RUH that it's now blocking from view.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-23]
Reply With Quote
     
     
  #19  
Old Posted Apr 26, 2017, 7:23 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 854
Yes Echoes I always liked the view traveling from east to west with city hospital in view, now we will have a hospital going from west to east, nice.
Reply With Quote
     
     
  #20  
Old Posted May 30, 2017, 9:25 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,224
Quote:
Sask. Children's Hospital named after Jim Pattison following $50M donation
Huge Donation by Jimmy. Here's the story:

http://ckom.com/article/1588129/sask...g-50m-donation
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:31 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.