MINNEAPOLIS | Minneapolis Rebuilds

I wanted to start a dedicated thread to covering the rebuilding process for sites left behind by buildings that were fully destroyed by arson during the unrest in May and June. I'm not necessarily opposed to including renovations of damaged buildings here, but I am personally going to focus on trying to document each ground-up new building on the site of buildings that were fully destroyed. I thought it would be helpful to have this as its own thread, rather than mixed in with the Minneapolis general development thread. If any moderators feel differently and think they should be combined, that's fine, but if it's all the same to everyone else, I'd appreciate keeping it separate.

If possible, I'd like to limit the discussion here to the physical recovery of East Lake and other areas that sustained damage. Discussions of police brutality, racism, politics, policy, and crime are all important, but if we could please focus this thread on the physical reconstruction, I would greatly appreciate it.

I've been waiting for the first rebuilding projects to get started so that I could start documenting them. For awhile, Wellington's Midtown Corner was the only site working on a ground-up rebuild, but just in the last week a couple others got started, so I thought it was time to start a thread.
Reply With Quote
     
     
  #2  
Old Posted Oct 29, 2020, 1:08 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 10/28/20
This building was the 6-story affordable housing project under construction that was about 75% built when it was burned and ended up in some pretty widely-circulated photos.





MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 10/28/20







Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 10/28/20





Reply With Quote
     
     
  #3  
Old Posted Oct 29, 2020, 3:01 AM
Drcastro Drcastro is offline
Registered User
 
Join Date: Apr 2020
Location: SW Mpls
Posts: 418
Thanks for doing this.

It seems amazing to me that they were apparently able to salvage the first level of the Midtown Corner project, given the extreme heat it must’ve been exposed to. Nice to see.
Reply With Quote
     
     
  #4  
Old Posted Oct 29, 2020, 3:55 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Quote:
Originally Posted by Drcastro View Post
Thanks for doing this.
Thanks. I'm anticipating following the reconstruction closely being very therapeutic for me. This has all been personally very difficult. I'm not sure if anyone else who reads here will feel the same, but hopefully folks who don't have a personal connection will at least find it interesting.

Quote:
Originally Posted by Drcastro View Post
It seems amazing to me that they were apparently able to salvage the first level of the Midtown Corner project, given the extreme heat it must’ve been exposed to. Nice to see.
They actually did have to take the concrete down due to the heat it was exposed to, even had to dig up the footings and pour anew. Everything that's there now is brand new. It is amazing that they were able to mobilize and get all of that done already!

Wellington also owns the Hi-Lake Shopping Center. It's great to see them leading by being one of the first to begin rebuilding.

Article on Midtown Corner and Wellington's commitment to rebuild: https://www.startribune.com/after-ap...ild/571509542/ .
Reply With Quote
     
     
  #5  
Old Posted Oct 29, 2020, 5:54 AM
Drcastro Drcastro is offline
Registered User
 
Join Date: Apr 2020
Location: SW Mpls
Posts: 418
Ah, that makes sense. I think one of your pictures has some shadows that I lept to the conclusion were smoke marks. Even more kudos to them for getting this far already.

And you are not the only one for whom this is therapeutic. Watching my own city go through this was very sad.
Reply With Quote
     
     
  #6  
Old Posted Nov 3, 2020, 11:49 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 11/3/20





MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 11/3/20





Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 11/3/20



Reply With Quote
     
     
  #7  
Old Posted Nov 8, 2020, 12:34 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
AutoZone (312 East Lake St) -- 1 floor -- retail -- 11/7/20

Reply With Quote
     
     
  #8  
Old Posted Nov 14, 2020, 12:51 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 11/13/20



MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 11/13/20



Reply With Quote
     
     
  #9  
Old Posted Nov 20, 2020, 8:48 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
AutoZone (312 East Lake St) -- 1 floor -- retail -- 11/20/20





Reply With Quote
     
     
  #10  
Old Posted Dec 13, 2020, 1:51 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
AutoZone (312 East Lake St) -- 1 floor -- retail -- 12/12/20



Speedway (801 West Lake St) -- gas station -- 12/12/20



Reply With Quote
     
     
  #11  
Old Posted Dec 13, 2020, 6:03 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 12/13/20





Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 12/13/20







MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 12/13/20








815 Cedar Ave -- 1 floor -- retail -- 12/13/20



Reply With Quote
     
     
  #12  
Old Posted Dec 19, 2020, 12:10 AM
Chef's Avatar
Chef Chef is offline
Paradise Island
 
Join Date: Jan 2006
Location: Minneapolis
Posts: 2,444
So far all the new construction has been a similar replacement for what was there before. This is the first project that is a significant upgrade on the building that was damaged or destroyed:

Somali mall, Walgreens burned in Minneapolis riots set for $40M redevelopment
Apartments, office and retail would replace Somali mall, Walgreens on Lake Street site.
By Dee DePass Star Tribune DECEMBER 9, 2020 — 9:49PM

Plans to redevelop the Karmel Square Mall in south Minneapolis into a $40 million office, retail and apartment building have won preliminary approval from the Minneapolis Planning Commission.

The property had been a Walgreens store at 200 W. Lake St. and behind it — at 2910 Pillsbury Av. — a popular mall frequented by the Somali community. The property is believed to be the first Somali-focused mall in the country.

The Walgreens store and other surrounding structures on Lake Street were burned and sustained sprinkler damage during riots in May following the police killing of George Floyd, so the redevelopment plans are a boon to the city.

Under the plan approved by the Planning Commission Monday, the mall and Walgreens will be redeveloped into an eight-story building called the New Karmel Square.

https://www.startribune.com/somali-m...ent/573343331/



A streetview of the location before the riots:

https://www.google.com/maps/@44.9483...7i16384!8i8192

Hopefully we see more of this along Lake Street. It is an improvement on what is there now without changing the culture or the demographics of the surrounding area

Last edited by Chef; Dec 19, 2020 at 8:12 AM.
Reply With Quote
     
     
  #13  
Old Posted Dec 19, 2020, 4:47 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Thanks for posting. It makes sense that the rebuilding that's starting first are the smaller replacement buildings, mostly from national chains, and that the more significant redevelopments are going to take longer to plan and bring to fruition. I agree that it will be exciting to see what larger projects are born out of all this. The general Lake/Nicollet area was already primed for big changes with the transit investments coming to the area and the reopening of Nicollet Ave. With the additional redevelopment opportunities forced by the unrest, I'm very hopeful that we'll see much more intense redevelopment in that area especially. And this project is a big step in that direction.

I think that rendering is a bit outdated and shows an earlier 6-story version. Here's the 8/9-story version that was approved earlier this month: (https://lims.minneapolismn.gov/downl...0W%20Lake%20St):

Reply With Quote
     
     
  #14  
Old Posted Jan 9, 2021, 4:44 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 1/9/21







Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 1/9/21









MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 1/9/21





815 Cedar Ave -- 1 floor -- retail -- 1/9/21



AutoZone (312 East Lake St) -- 1 floor -- retail -- 1/9/21




Speedway (801 West Lake St) -- gas station -- 1/9/21




Holiday (4601 Hiawatha Ave) -- gas station -- 1/9/21





Wendy's (2931 26th Ave S) -- 1 floor -- retail -- 1/9/21



Reply With Quote
     
     
  #15  
Old Posted Feb 3, 2021, 12:54 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Speedway (801 West Lake St) -- gas station -- 2/2/21

Reply With Quote
     
     
  #16  
Old Posted Feb 7, 2021, 6:37 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Looks like the Lake/Clinton Autozone is on track to be the first ground-up rebuild to open for business.

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 2/7/21







Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 2/7/21





815 Cedar Ave -- 1 floor -- retail -- 2/7/21







MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 2/7/21





AutoZone (2610 East Lake St) -- 1 floor -- retail -- 2/7/21





AutoZone (312 East Lake St) -- 1 floor -- retail -- 2/7/21



Wendy's (2931 26th Ave S) -- 1 floor -- retail -- 2/7/21





Shell (640 East Lake St) -- gas station -- 2/7/21

Reply With Quote
     
     
  #17  
Old Posted Mar 31, 2021, 7:22 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Karmel -- apartments, retail, offices, mosque -- 9 floors -- 3/30/21





Shell (640 East Lake St) -- gas station -- 3/30/21

Reply With Quote
     
     
  #18  
Old Posted Apr 8, 2021, 1:25 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
The Lake/Aldrich Speedway is now the second ground-up rebuild to be fully complete and open for business.

Karmel (200 West Lake St) -- apartments, retail, offices, mosque -- 9 floors -- 4/6/21





Midtown Corner (2619 E 29th St) -- 6 floors -- apartments, retail -- 4/7/21







Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 4/7/21





815 Cedar Ave -- 1 floor -- retail -- 4/7/21





AutoZone (2610 East Lake St) -- 1 floor -- retail -- 4/7/21





Wendy's (2931 26th Ave S) -- 1 floor -- retail -- 4/7/21





Holiday (4601 Hiawatha Ave) -- gas station -- 4/7/21





Speedway (801 West Lake St) -- gas station -- 4/7/21

Reply With Quote
     
     
  #19  
Old Posted May 25, 2021, 3:55 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Karmel (200 West Lake St) -- apartments, retail, offices, mosque -- 9 floors -- 5/24/21

Reply With Quote
     
     
  #20  
Old Posted Jun 11, 2021, 12:55 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Karmel (200 West Lake St) -- apartments, retail, offices, mosque -- 9 floors -- 6/10/21





112 East Lake St -- apartments & retail -- 4 floors -- 6/10/21

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:13 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.