The Downtown Highway That Could Drive Hartford’s Comeback
https://www.citylab.com/equity/2019/...zoning/603922/
Quote:
.....
- Battered by population loss and the departure of manufacturing and corporate anchors, Hartford has been on the brink of bankruptcy for several years. In response, the city has taken a sophisticated multi-pronged approach in plotting its post-industrial future: It’s implemented a series of zoning and land-use reforms, encouraged adaptive reuse of historic buildings, and improved mobility with new transit and better facilities for bike riders and pedestrians. --- But in an illustration of how a mid-sized legacy city can work smart and still face existential challenges, Hartford finds another monumental task in its way: a crumbling piece of 20th-century infrastructure, a stretch of the Interstate 84 viaduct adjacent to downtown that is well past its expiration date.
- The ideas for what to do with it now range from a plain-vanilla rebuild to a tunnel system more elaborate than Boston’s Big Dig. Optimists might argue that the viaduct dilemma represents an opportunity for city-building on a grand scale. But most are unhappy—even resentful—about being stuck with this problem; it’s like working hard to rehabilitate a sore shoulder, then being told you need an expensive hip replacement. Ultimately, the choices ahead will hinge on how much the state, and even more so, the federal government, is willing to invest. It will also be a test of the belief that a megaproject will truly save the day—or whether a more frugal and incremental solution would be the wiser path.
- Amid all that earnest activity, however, the nagging question remains: what to do with the two-mile section of I-84 just outside downtown, which in an ironic reference to past glory is known as the Aetna Viaduct. Its projected lifespan ended in 2005, and engineers are now worried about catastrophic failure. Replacement options under consideration include just fixing the viaduct so it is in a state of good repair ($2 to $3 billion), or lowering the highway with a series of decks ($4 to $5 billion). A study commissioned by the city calls for a more artful integration of the urban streetscape and the area’s existing rail and bus rapid transit system, known as CTfastrak.
.....
|
__________________
ASDFGHJK
|