HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Apr 17, 2014, 4:33 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
Lightbulb HOUSTON | Susan and Fayez Sarofim Pavilion | 380 FT | 15 FLOORS

Developer: Memorial Hermann Health Systems
Architect:
Type: Medical
Location: Texas Medical Center
Construction Timeline: Mid-2014 Start Date - 2018 Completion



Quote:
Originally Posted by HBJ
Memorial Hermann to kick off $650M project in the Texas Medical Center

Memorial Hermann Health System — Houston's largest health care system — will soon begin a $650 million expansion and renovation of its Texas Medical Center campus.

Construction on the Memorial Hermann-TMC Master Plan project is scheduled to begin this summer and conclude in 2018. Houston-based WHR Architects Inc. is the architect of record for the project.

The Memorial Hermann-TMC campus currently spans more than 2.5 million square feet, and the expansion includes:

An additional 1.34 million square feet;
additional 160 beds (plus 71 replacement beds);
24 new operating rooms;
16 additional emergency room bays;
750 new parking spaces; and
a 333-seat café.

The highlight of the master plan will be a new patient care building and an additional building that will include parking and infrastructure capabilities. Also, the master plan accounts for future growth with the construction of six shelled floors and six shelled operating rooms, with the potential of adding 264 beds.

“We recognize that our community will continue to grow and so will their health needs, so we’re designing the building with a forward-looking perspective to meet those needs,” Dan Wolterman, president and CEO of Memorial Hermann Health System, said in a statement.

The launch of the master plan project comes on the heels of much growth for the hospital system. Last June, the system’s board approved $50 million to address short-term capacity projects at the Texas Medical Center campus.

Full Article: http://www.bizjournals.com/houston/n...ct-in-the.html

Last edited by Urbannizer; Apr 30, 2014 at 6:24 PM.
     
     
  #2  
Old Posted Apr 18, 2014, 9:04 PM
toxteth o'grady's Avatar
toxteth o'grady toxteth o'grady is offline
Registered User
 
Join Date: May 2007
Posts: 2,408
HBJ had a lengthy article on the Medical Center. St. Luke's is the building that will get replaced by a slightly smaller facility. This one is all expansion space. I'm not sure was Christus wants to shrink St. Luke's or what will happen to the old building.
__________________
"This will be good for the city"
     
     
  #3  
Old Posted Oct 14, 2014, 3:45 AM
toxteth o'grady's Avatar
toxteth o'grady toxteth o'grady is offline
Registered User
 
Join Date: May 2007
Posts: 2,408
Newly posted 10/13 by Urbannizer on HAIF:



I'm not sure how I like the illumination of the roofline versus the existing tower. I wonder if that will be changing color.
__________________
"This will be good for the city"
     
     
  #4  
Old Posted Oct 14, 2014, 4:12 AM
photoLith's Avatar
photoLith photoLith is online now
Ex Houstonian
 
Join Date: Feb 2008
Location: Pittsburgh n’ at
Posts: 15,489
Needs to be taller.
__________________
There’s no greater abomination to mankind and nature than Ryan Home developments.
     
     
  #5  
Old Posted Oct 14, 2014, 3:30 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,668
Quote:
Originally Posted by toxteth o'grady View Post
Newly posted 10/13 by Urbannizer on HAIF:



I'm not sure how I like the illumination of the roofline versus the existing tower. I wonder if that will be changing color.
I prefer the previous design.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #6  
Old Posted Jan 25, 2015, 2:44 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
     
     
  #7  
Old Posted Aug 14, 2015, 5:09 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377


http://www.breakingnewgroundproject....nsion-project/

Quote:
Memorial Hermann Breaks Ground on $650 Million Texas Medical Center Renovation and Expansion Project

Memorial Hermann broke ground Wednesday on the $650 million expansion and renovation of its Texas Medical Center (TMC) Campus. As the Houston region’s only full-service health system, this expansion will enable Memorial Hermann to stay ahead of the fast-growing advances in medicine, keep pace with the extraordinary growth of the city and, most importantly, meet the health needs of the community for years to come.

Local dignitaries, community leaders, affiliated UTHealth physicians and Memorial Hermann leadership all gathered last night to celebrate the official groundbreaking event. In attendance were: Rep. Al Green; President and CEO of the Texas Medical Center, Dr. Robert Robbins; Houston City Council Members Jack Christie and Ellen Cohen; numerous staff representatives of local, state and federal officials; Dr. Giuseppe Colasurdo, President of UTHealth and Dean of UTHealth Medical School; Memorial Hermann Health System Board Chairman Will Williams and several other Memorial Hermann System and Foundation board members; and key representatives of Memorial Hermann leadership including President and CEO Dan Wolterman.

At the event, Rep. Green presented Memorial Hermann-TMC with a Certificate of Special Congressional Recognition that saluted the hospital’s “continued commitment to providing the latest medical innovations and procedures for treating patients as well as your dedication to exceptional patient care.”

The Breaking New Ground expansion and renovation project began in fall 2014 and is expected to be completed in 2019. Highlighting the project will be the construction of a new patient care building and an additional building that will include parking and infrastructure capabilities to support the new growth.










__________________
HAIF
     
     
  #8  
Old Posted Sep 2, 2015, 9:00 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
8/30 by hindesky on HAIF

__________________
HAIF
     
     
  #9  
Old Posted Nov 5, 2015, 9:55 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
11/1

__________________
HAIF
     
     
  #10  
Old Posted Nov 18, 2015, 10:36 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
11/18

__________________
HAIF
     
     
  #11  
Old Posted Dec 12, 2015, 8:18 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
12/12


c/o Hindesky on HAIF
__________________
HAIF
     
     
  #12  
Old Posted Feb 17, 2016, 8:05 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
__________________
HAIF
     
     
  #13  
Old Posted Mar 14, 2016, 12:52 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
Site prep for the main portion has begun.

__________________
HAIF
     
     
  #14  
Old Posted Jun 3, 2016, 5:47 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
Proposed Case for: 2016-ASW-5603-OE

Quote:
Structure Name: Memorial Hermann HP2
Quote:
Structure Height: 380
__________________
HAIF
     
     
  #15  
Old Posted Oct 23, 2016, 4:33 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
__________________
HAIF
     
     
  #16  
Old Posted Nov 18, 2016, 8:30 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377


__________________
HAIF
     
     
  #17  
Old Posted Dec 27, 2016, 5:51 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
Second crane is up.




By hindeskyon HAIF
__________________
HAIF

Last edited by Urbannizer; Jan 5, 2017 at 1:44 PM.
     
     
  #18  
Old Posted May 9, 2017, 8:51 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377
__________________
HAIF
     
     
  #19  
Old Posted Jul 14, 2017, 9:23 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377




__________________
HAIF
     
     
  #20  
Old Posted Oct 12, 2017, 12:48 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,377

hindesky @haif
__________________
HAIF
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:13 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.