Quote:
Originally Posted by Reeder113
I posted a picture of the west tunnel a week or two ago (it has all the artwork on the walls). It definitely doesn't have moving walkways in it. And it does kind of feel "temporary" (besides the artwork that's been painted on the walls). It just doesn't look like something designed for the public to use long-term. But who knows.
|
There is a moving walkway in the west tunnel- you can see it in this picture from the Deseret News:
Here is some additional information about the central tunnel and its art project, which will be a sort of continuation of the canyon in the terminal:
https://gordonhuether.com/river-tunnel/
And some additional info. from the "New SLC Fact Sheet" on the airport's website:
Tunnel (Mid-Concourse):
Area 41,454 sq. ft.
990 ft. long
Cost - $19,258,976 to connect
Built in 2004
Tunnel (Central):
Area 106,140 sq. ft.
990 ft. long
Cost - $120,390,252
Designed to hold a future tram for access to a third concourse.