Just using paint, I filled in most of the major projects in downtown Hamilton that will have a big impact on the skyline.
All of the buildings, except two, have either been approved or are under construction. The two buildings that have not
yet been approved, should be, when the full plan is revealed within the next 2 months.
*The location for the 44 floor tower has not been released yet, but it is rumored to be built on the location of what is currently Sir John A.
MacDonald Secondary School, so that is where I put it.
Photos Taken By: Jaybird | Posted On: skyscrapercity.com | Edited By Me