Some pictures I took today. Yesterday a load of glass arrived, though no glass has been installed yet. Two cantilever loading platforms are up. Today rebar went in for the lucky 13th floor.
Yesterday in the wintery weather an anchoring frame was built to stabilize the crane. Today the climbing frame was assembled around the mast for a new mast section to be placed tomorrow.