Since 1999, the SkyscraperPage Forum has been one of the most active skyscraper enthusiast communities on the web. The global membership discusses development news and construction activity on projects from around the world, alongside discussions on urban design, architecture, transportation and many other topics. Welcome!

You are currently browsing as a guest. Register with the SkyscraperPage Forum and join this growing community of skyscraper enthusiasts. Registering has benefits such as fewer ads, the ability to post messages, private messaging and more.

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation

Reply

 
Thread Tools Display Modes
     
     
  #1261  
Old Posted Sep 20, 2014, 12:57 AM
Folks3000 Folks3000 is offline
Registered User
 
Join Date: Dec 2013
Posts: 39
Quote:
Originally Posted by alchemist redux View Post
Instead of a second BART tunnel, would it make sense to extend a heavy rail HSR/Caltrain tunnel across the Bay instead? This would turn Transbay into a through station. At the east portal, it could effectively become a wye, where the current Capitol Corridor - in both directions - could be electrified.

I don't know the logistics or cost differential of this, but some of the things this would allow would be more direct SF-Sacramento HSR service, and an alternative one seat route from the East Bay through Silicon Valley to San Jose.
MTC is actually studying this alternative. Here is one of their maps of a 4 track BART/heavy rail transbay tube that can be used by both Caltrain and BART. The BART tube continues through to to the west. I am unsure if they are still putting the south facing tail tracks on the new TTC. I think they were also looking at high(ish) speed electrified Capital Corridor trains being diverted into the City (some of them, obviously some will continue to the South Bay suburbs).

Reply With Quote
     
     
  #1262  
Old Posted Sep 20, 2014, 1:06 AM
Folks3000 Folks3000 is offline
Registered User
 
Join Date: Dec 2013
Posts: 39
Tiger grant award

Also, I didn't realize we had this transportation forum, so let me re-post this here:

MTC just got the only TIGER Grant in the SF Bay Area, and it is for a Core Capacity Transit Study. Read more about it in the documents with the Tiger Application here:

http://bids.mtc.ca.gov/procurements/167

It seems they are studying transbay alternatives. I've poured through lots of MTC documents, some have been looking at putting a new transbay tube right next to the existing one with switch tracks on each end. These could be used to extend BART service into later hours (the major impediment to 24 hour service is the fact that the two tracks must be closed for nightly track work). After entering SF and going through the switch tracks, the new alignment could then continue down any street (Mission for example to connect to TTC) and then head west down Geary/Folsom/etc).

This grant doesn't mention heavy rail like Caltrain crossing the Bay. I think one interesting idea that MTC is looking at is to have an intermodal station between BART and the Capital Corridor right in West Oakland, that way one can ride the Capitol Corridor (or SJ's or any intercity Amtrak line) and then have a quick 8 minute ride into the city (instead of the god-forsaken richmond transfer to BART, or bus transfer at Emeryville, or Coliseum transfer to BART). This could make the Capital Corridor and SJ ridership EXPLODE as they now could be used for reasonable commuting. Another idea is to have a new East Bay BART line that directly serves Emeryville, thus providing a similarly direct connection.
Reply With Quote
     
     
  #1263  
Old Posted Sep 30, 2014, 12:16 AM
fflint's Avatar
fflint fflint is online now
Registered User
 
Join Date: Jul 2001
Location: San Francisco
Posts: 20,046
The newest APTA ridership report is out.

Some local highlights:

*Muni is up to 761,300 daily riders
*BART is up to 432,700 daily riders
*VTA is up to 146,500 daily riders
*Caltrain is up to 57,500 daily riders
*Golden Gate Transit is down to 30,000 daily riders
*Bay Area ferry boats now carry 14,700 daily riders

Not all regional transit systems provide data to APTA (SamTrans, AC Transit, Altamont Commuter Express being the most notable). When we combine all the APTA data with ridership data from Wikipedia and the local media for all Bay Area transit agencies, we learn:

*AC Transit carries around 200,000 daily bus riders
*SamTrans carries around 50,000 daily bus riders

*Regional commuter rail ridership (ACE, Caltrain, Capitol Corridor, San Joaquins) now exceeds 70,500 daily riders
*Total Bay Area ridership on railroads--light rail, metro rail, commuter rail--is up to 762,000 daily riders.

*Total Bay Area transit ridership (boat, bus, train) exceeds 1,746,300 daily riders. That doesn't include the estimated 30,000 daily riders on local shuttles (Google Buses, etc.).
__________________
2014: the United States Supreme Court Imposes Corporate Sharia
Reply With Quote
     
     
  #1264  
Old Posted Oct 6, 2014, 9:46 PM
Eightball's Avatar
Eightball Eightball is offline
Young Yuppie
 
Join Date: Jun 2013
Location: DTLA
Posts: 817
Caltrain Gets Clearance to Proceed with Design/Build Plans for Electrification
http://www.caltrain.com/Page3534.aspx
Reply With Quote
     
     
  #1265  
Old Posted Oct 8, 2014, 2:01 AM
Folks3000 Folks3000 is offline
Registered User
 
Join Date: Dec 2013
Posts: 39
Level Boarding for Caltrain and High Speed Rail

http://sf.streetsblog.org/2014/10/07...vel-platforms/

Good news for the capacity of the Transbay Transit Center. Caltrain had some foolish idea of terminating some of its trains at 4th and King (even though there are almost as many jobs near the new Transbay Terminal as the entire rest of the Caltrain line combined)! Hopefully this will allow all commuter trains to serve FiDi.
Reply With Quote
     
     
  #1266  
Old Posted Oct 8, 2014, 4:59 PM
M II A II R II K's Avatar
M II A II R II K M II A II R II K is offline
Registered User
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,074
How would you improve BART?

BART has some important decisions to make over the next few decades. The system is aging and in need of repair.

At the same time, the region is growing, and more transit capacity is needed. This exercise is designed to help you help us set priorities for spending and revenue sources. You will see, in real time, the potential benefits and impacts of different spending decisions on the regional transit system (including BART and other modes, such as Transbay buses). You can update your priorities at any time.




http://www.futurebart.org/
__________________
ASDFGHJK
Reply With Quote
     
     
  #1267  
Old Posted Oct 9, 2014, 7:15 AM
CharlesCO's Avatar
CharlesCO CharlesCO is online now
Aspiring Amateur
 
Join Date: Jul 2010
Location: Lafayette, CA / Denver, CO
Posts: 219
This looks like some sort of game. It's like a BART version of Sim City. I feel like they also came up with this website so that people (hopefully) realize how much investment BART needs to meet everyone's expectations in the next few decades.
Reply With Quote
     
     
  #1268  
Old Posted Oct 9, 2014, 6:41 PM
northbay's Avatar
northbay northbay is offline
Another day in Paradise
 
Join Date: Mar 2006
Location: Cotati - The Hub of Sonoma County
Posts: 1,718
^Exactly! We need more money! I personally wanted both a second transbay tube and a western extension but they are so expensive. I went for the second tube but it's clear regardless BART will need A LOT of money.
__________________
"I firmly believe, from what I have seen, that this is the chosen spot of all this Earth as far as Nature is concerned." - Luther Burbank on Sonoma County.

Pictures of Santa Rosa, So. Co.
Reply With Quote
     
     
  #1269  
Old Posted Oct 10, 2014, 4:15 PM
Folks3000 Folks3000 is offline
Registered User
 
Join Date: Dec 2013
Posts: 39
Quote:
Originally Posted by northbay View Post
^Exactly! We need more money! I personally wanted both a second transbay tube and a western extension but they are so expensive. I went for the second tube but it's clear regardless BART will need A LOT of money.
Same, I wanted the second tube and the western extension but the game was kind of set up so you didn't choose them. I stubbornly still chose them, they can have all the money to fix BART they want if they'd just make it actually a useful complement to Muni in SF!

Bart to the Beach would be so awesome!
Reply With Quote
     
     
  #1270  
Old Posted Oct 14, 2014, 1:52 AM
Folks3000 Folks3000 is offline
Registered User
 
Join Date: Dec 2013
Posts: 39
Exciting times for the SF ferry system and the North Bay

I took the liberty of putting a few of the existing and proposed ferry lines on a map. New routes include Treasure Island, Redwood City, Antioch (not included in the map, I think it is a bit far fetched), Berkeley, Richmond, Martinez, and Hercules. I also put on the SMART commuter rail and the proposed VINE commuter train in Napa County, showing how they could one day connect to the Vallejo and Larkspur ferry terminals. This would make SF quite a major ferry hub. Perhaps an underground connection to BART (and the Transbay Transit Center) could really make the transfers seamless one day!



Let me know what you all think!
Reply With Quote
     
     
End
   
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:11 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2014, vBulletin Solutions, Inc.