Quote:
Originally Posted by 1487
this site is huge and the footprint is huge. They were working below grade here for almost a year. There was no work on the Bridge below grade- they built up from the parking lot. The residential tower should rise at a much faster clip because I believe someone with inside info said they are going with the pre fabricated plank floors for the residential portion. Same as museum towers 2.
|
The Bridge has 2 or 3 floors of underground parking; see #167 on page 9 of that thread. But even the digging and related work at that site took like just a afternoon or two. They have been flying since they started.
I too have noticed what seems to be a slowing of progress here at Market St. East, but also else where in the steel work, like Comcast (but not Children's Hospital east side). All in all I've wondered if there's a shortage in steel or in the ability to get it fabricated. Just between NYC and Philly theres alot of steel being sent skyward. And you can't just take it off the boat and send it to the crane.
But I'm just guessing; I know nothing.