May 9
nobody messes with the bridges - easier to cut out part of your wall.
Slant capable - apparently putting in whatever the cables tie off to.
Preparing runs
May 14
Stubby rig for low clearance - put in the H-Piles under the edge of Wacker
Working on the wall
May 16
Tightening and filling
Tied off (hose clipped off)
The land side - the angled brace is tied off to something the slant drill put in, the sheet piles have been welded to the brace.