HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Apr 29, 2009, 4:31 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
TAIWAN RAIL DEVELOPMENTS | HSR, TRAs, MRTs, METROS

HSR




photo: THSRC

Taipei Nangang Station, HSR/TRA/MRT, 2011

------------------------------------------------------------------------
TRA Branch Lines



Hsinchu (Construction)
TRA/THSR, Lioujia Line, 2010
11.28 km
4 stations
http://www.erieb.gov.tw/eg4e.htm

Tainan (Construction)
TRA/THSR, Salun Line, 2010
6.4 km
2 stations
http://www.erieb.gov.tw/eg5e.htm

Keelung (Construction)
Shenao Line (Marine Museum), 2011
5 km
2 stations

Taoyuan MRT (Construction)
Taipei/Taoyuan Airport Express, 2014 (Construction)
51 km
21 stations

Rolling Stock: Kawasaki

http://www.mrt.tpc.gov.tw/web66/_fil...9537/map1b.jpg
--------------------------------------------------------------------------
Taipei MRT Projects



Light Metro (Construction)

Rolling Stock: Bombardier


Brown Line - Neihu Extension, July 1st, 2009
14.8 km
12 stations

Orbital Line, 2014 (Planning)
15.4 km
14 stations
http://www.mrt.tpc.gov.tw

--------------------------------------------------------------------------
Heavy Metro (Construction)

Rolling Stock: Kawasaki


Orange Line, 2013
19.7 km
16 stations

Orange Line - Luzhou Extension, 2010
6.4 km
5 stations

Green Line - Songshan Extension, 2012
8.5 km
8 stations

Blue Line - Nangang Extension, 2008
2.5 km
2 stations

Blue Line - Dingpu Extension, 2013
2 km
1 station

Red Line - Xinyi Extension, 2012
6.4 km
5 stations
--------------------------------------------------------------------------
TRA Western Line Reconstruction (Construction)


Kaohsiung Underground Railway Project, 2016
9.75 km rail tunnel

Taichung Elevated Railway Project, 2015
21.19 km viaduct

TRA Eastern Line Reconstruction (Construction)

Hualien - Taidong Electrification and Double-Track, 2015
155 km


INFO GATHERED BY COYETTE ON SSP.
This thread can also be found under the transportation section of this forum.
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT

Last edited by metroXpress; Jul 24, 2009 at 1:40 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:26 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.