Quote:
Originally Posted by freerover
The Red Line would Tunnel under Lamar. This makes sense. It can't go over because they want to potentially have elevated BRT/LRT at that intersection.
|
Maybe. I think this is just one example, and more study is needed (hence the grant).
Two pages before that one:
"Capital Metro is currently studying
multiple railroad and vehicle grade
separation solutions at the Crestview
intersection area that include:
rail-over-road or rail-under-road projects."