Ok, the columns that went up today are non-structural and will support the louvered walls that span from the 103rd floor slab to just below the parapet, these walls serve for ventilation and will create an air plenum between these walls and the exterior facade.
Here louvered walls are in blue:
In case anyone didn't notice, this plenum will be exactly the same as the ones located between floors 91-93M and 3-6M.