HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Mar 8, 2016, 3:36 AM
mSeattle's Avatar
mSeattle mSeattle is offline
Socialism 4 Extreme Rich?
 
Join Date: Dec 2002
Location: here
Posts: 10,073
SEATTLE | 2nd & Pine | 440 Ft | 39 Floors



Construction pictures

Quote:
Originally Posted by Vashon118 View Post
Quote:
Originally Posted by SounderBruce View Post
Quote:
Originally Posted by geoffloftus View Post
Here's the glass...









     
     
  #2  
Old Posted May 6, 2016, 2:46 PM
Ed007Toronto Ed007Toronto is offline
Registered User
 
Join Date: Dec 2003
Posts: 381
     
     
  #3  
Old Posted May 10, 2016, 9:06 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,795
     
     
  #4  
Old Posted Jun 18, 2016, 2:39 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,795
Delete

Last edited by chris08876; Jan 14, 2017 at 8:21 PM. Reason: Broken link
     
     
  #5  
Old Posted Dec 13, 2016, 8:02 PM
hotwheels hotwheels is offline
Registered User
 
Join Date: Mar 2016
Posts: 427
2nd + Pine Nearing Completion in Downtown Seattle
Quote:
the recently topped-off 40-storey luxury condo tower designed by GBD Architects and Weber Thompson for Equity Residential, which is now nearing completion in downtown Seattle. Its distinctive glass curtain wall with metal accents has all but made it to the top of the tower, and the precast concrete podium base is continuing to fill out, so it will only be a matter of months before the development opens to residents.
     
     
  #6  
Old Posted Jan 14, 2017, 8:18 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,795

Credit: geoffloftus
     
     
  #7  
Old Posted Feb 19, 2017, 11:01 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,795
     
     
  #8  
Old Posted Feb 20, 2017, 6:05 AM
mSeattle's Avatar
mSeattle mSeattle is offline
Socialism 4 Extreme Rich?
 
Join Date: Dec 2002
Location: here
Posts: 10,073
This is a change up from projects that get downgraded. This site got upgraded from a previous proposal which would have been half its size. A hotel (almost the size of the original proposal for this plot) is under construction on the same block.
     
     
  #9  
Old Posted Apr 27, 2017, 3:32 AM
mSeattle's Avatar
mSeattle mSeattle is offline
Socialism 4 Extreme Rich?
 
Join Date: Dec 2002
Location: here
Posts: 10,073
April 6, 2017 Sealed up the building.
April 28, 2017 Interior work continues. Has not yet opened as of April 28, 2017.


April 6, 2017 by Marcus Stringer, on Flickr

Last edited by mSeattle; Apr 28, 2017 at 2:57 PM.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 11:01 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.