HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    111 South Main in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Salt Lake City Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
  #101  
Old Posted Apr 3, 2015, 5:50 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
____________________________Updates ~ 111 Tower - The Utah Performing Arts Center & Regent Street


_____________________________________________
_____________________________________________Utah Performing Arts Center & 111 Tower



________ ...Lead architects, Cesar Pelli and Mitch Hirsch explained in detail the design, which will include a three-balcony, opera house configuration for the seating area and a large,
________four-story “Winter Garden” lobby with glass exterior facing Main St. They also touted the fact that the theater building will have no “back”. With pedestrian passages from Main St. to Regent St,
________a public plaza in front of the truck loading docks, and a rejuvenated Regent St full of nightlife and daytime action, the NPAC will be a driving force
________in further activating downtown on the blocks to the immediate south of the spectacular new City Creek Center...


____
____utahperformingarts.wordpress.com



NOW FOR THE ACTUAL TECHNICAL DETAILS OF CONSTRUCTION AND DESIGN...

HERE ARE THE LINKS

https://prezi.com/wu-fyrihjq6x/111-south-main/

https://prezi.com/agv9fhji53qo/111-s...ake-city-utah/

ENJOY!!!





[/QUOTE]



City unveils new plans for downtown Regent Street by 111 Tower & EPAC Theater

Jason Lee, Deseret News

http://www.deseretnews.com/article/8...y-theater.html

Becker and other city administrators unveiled the new schematic design plans for the Regent Street block located on the east side of the new Eccles Theater, between 100 South and
200 South.



Artist rendering of view from 200 South of proposed Regent Street redevelopment project aimed at making the mid-block connector between City Creek and
the Gallivan Center a place to “gather, discover and connect.” (Salt Lake City)


The project would include retail and dining establishments, a public plaza, along with custom landscape architecture throughout the common areas. While the street would still be
accessed by motor vehicle traffic, the area would also be accessible to pedestrians and could be converted to pedestrian-only access for events such as concerts, Becker explained.

“Since I took office, a primary object is to make downtown a gathering place for the region — and have it be a true welcoming environment for people seeking all kinds of activities that you
can really only find in the downtown area,” he said. “We see this as part of what we are doing to make this the 'cultural core' of the region.”...


Artist rendering of view from 100 South of proposed Regent Street redevelopment project aimed at making the mid-block connector between City Creek and the
Gallivan Center a place to “gather, discover and connect.” (Salt Lake City)


...The redevelopment project is aimed at attracting more people into downtown and generating a distinctive experience that can’t happen anywhere else, said STRUCK agency's Brent Watts,
who is part of the creative design team for the Regent Street project.

“We want to create a 'branded' experience,” he said, adding that besides gathering and dining, the corridor will include local artists and local shops.

“We want sizeable, small-scale retail shops on the street,” Watts said. “That’s important.”...



Salt Lake City redevelopment project aimed at making the mid-block connector of Regent Street between City Creek and the Gallivan Center a place to
“gather, discover and connect.” (Salt Lake City)




.

Last edited by delts145; Jul 20, 2015 at 5:25 PM.
     
     
  #102  
Old Posted Apr 5, 2015, 11:58 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
March 23rd
Quote:
Originally Posted by msbutah View Post
New banner up on 111
Pic By Msbutah

.
     
     
  #103  
Old Posted Apr 5, 2015, 11:59 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Quote:
Originally Posted by Reachforthesky View Post
March 27th - Eccles Theater branding unveiled, 'The Lion King' slated for 2017

Great video with new pictures of the inside of the new theater

http://www.ksl.com/?sid=33986692&nid...s_cid=queue-16

March 31st

Quote:
Originally Posted by DCRes View Post

111 From Regent Street at City Creek Center

[IMG] by , on Flickr[/IMG]
Pic By DCRes

.
     
     
  #104  
Old Posted Apr 25, 2015, 11:13 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
April 21st

Quote:
Originally Posted by EPdesign View Post

Pic By EPdesign

.
     
     
  #105  
Old Posted Apr 25, 2015, 11:29 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
April 21st

Quote:
Originally Posted by airhero View Post

Work has begun on the portion of 111 hanging over the PAC
Pic By Airhero

.
     
     
  #106  
Old Posted May 7, 2015, 5:04 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
April 26th

Quote:
Originally Posted by CofIKid View Post

They have been working on raising the tower crane all weekend.

Pic By CofIKid
     
     
  #107  
Old Posted May 7, 2015, 5:05 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
An inside look at the Eccles Theater


Isaac Riddle - April 24, 2015 - Developments, Downtown, Salt Lake City, Under Construction - http://www.slcitynews.com/in-picture...ccles-theater/


____
____utahperformingarts.wordpress.com

_______________

____


By Isaac Riddle - For more information and pictures on this and other projects go to: THE SLC BLOG http://www.theslcblog.org/author/iriddle81gmail-com/

The Eccles Theater is still a year away from completion, but the impact of the theater on the downtown area can already be felt. The theater provides multiple access points to Main and Regent Streets, and three-floors of glass walls that open up to Main Street and the downtown skyline. The Eccles theater includes a 2,500-seat main hall, a third-floor terrace, patron and VIP lounge areas, black box theater, rehearsal space and several public gathering spaces.

Construction on the Eccles Theater and the adjacent 111 Main, will be completed late summer of 2016. The theater will share a lobby with the 24-story, 111 Main office tower. The theater will have a soft opening early fall of 2016, with the first show expected November of next year.



The 111 Tower as seen from the second floor of the Eccles Theater. Photo by Isaac Riddle.


The lobby of the Eccles Theater. Photo by Isaac Riddle.


The main stage area of the theater. Photo by Isaac Riddle.


The balcony seating in the main theater. Photo by Isaac Riddle.


View of downtown from the third-floor terrace. The terrace will be open to the public and available for events. Photo by Isaac Riddle.


View of downtown from the third-floor terrace. The terrace will be open to the public and available for events. Photo by Isaac Riddle.


The Eccles Theater and 111 Main as seen from Main Street. Photo by Isaac Riddle.

.

Last edited by delts145; May 29, 2015 at 12:53 PM.
     
     
  #108  
Old Posted May 7, 2015, 5:20 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
From hookers to headlines to hip, Salt Lake City block about to make news again



Deseret News Images


By TONY SEMERAD | The Salt Lake Tribune | First Published Apr 26 2015 08:24AM

A once-notorious Salt Lake City back street appears destined for some artistic respectability.

Right next to construction of the new performing-arts center and 111 Tower on Main Street, the city is launching a $12.8 million face-lift for Regent Street, Orpheum Avenue and a disused service alley off Main to be dubbed Regent Walk.

The renovation will transform what was once called Commercial Street — home to the city's red-light district, complete with brothels, taprooms, gambling halls and later, several newspapers — into the nexus of an emerging downtown arts district.

The project is meant as an appealing complement to the $110 million, 2,500-seat George S. and Dolores Doré Eccles Theater, under construction at 135 S. Main St., while adding an inviting and walkable north-south corridor between the Gallivan Center and City Creek Center.

Initial work begins in May on converting the run-down midblock segments — tucked between Main and State streets and stretching from 100 South to 200 South — into an intersecting trio of tree-lined, pedestrian-friendly thoroughfares with retail shops, restaurants and a public plaza.

The aim is to have city upgrades, new public art and a series of city-subsidized improvements by private property owners in place when the Eccles playhouse opens in 2016.
[/I]
(more at the article, including four renderings...)

http://www.sltrib.com/home/2425621-1...adlines-to-hip[/QUOTE]
     
     
  #109  
Old Posted May 9, 2015, 12:12 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 1st

Quote:
Originally Posted by s.p.hansen View Post


Pics By S.P.Hansen
     
     
  #110  
Old Posted May 18, 2015, 11:11 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 8th
Quote:
Originally Posted by s.p.hansen View Post

The retail and restaurant portion of the theater is really progressing at a nice pace!

Pic By S.P.Hansen

.
     
     
  #111  
Old Posted May 25, 2015, 3:59 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 15th

Quote:
Originally Posted by AllOutOfBubbleGum View Post

As Woody would say, "Reach for the Sky"



Pics By AllOutOfBubbleGum


.
     
     
  #112  
Old Posted May 25, 2015, 4:03 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 25th


Quote:
Originally Posted by SLCdude View Post

111 Tower overhanging Eccles Theater


Another view

[/url]
Pics By SLCdude

.

Last edited by delts145; May 25, 2015 at 4:14 PM.
     
     
  #113  
Old Posted May 27, 2015, 3:33 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 26th


Quote:
Originally Posted by H4vok View Post
Pic By H4vok

Last edited by delts145; May 29, 2015 at 12:57 PM.
     
     
  #114  
Old Posted Jun 4, 2015, 3:26 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 31st


Quote:
Originally Posted by ctobsl View Post

Here is what the 111 tower looks like from 500 East and 130 South.











Pics By Ctobsl

.
     
     
  #115  
Old Posted Jun 8, 2015, 11:18 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
May 31st

Quote:
Originally Posted by ToysNoiz View Post



Pics By ToysNoiz


.
     
     
  #116  
Old Posted Jun 12, 2015, 7:02 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
June 1st

Quote:
Originally Posted by s.p.hansen View Post

The windows are being installed.





Pics By S.P.Hansen

.
     
     
  #117  
Old Posted Jun 15, 2015, 2:36 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
June 4th

Quote:
Originally Posted by ctobsl View Post

I was there today... Here you go...



Pics By Ctobsl


.
     
     
  #118  
Old Posted Jun 19, 2015, 9:35 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
June 5th

Quote:
Originally Posted by ToysNoiz View Post




Pics By ToysNoiz
     
     
  #119  
Old Posted Jun 19, 2015, 9:35 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
June 8th

Quote:
Originally Posted by ToysNoiz View Post

Pics By ToysNoiz

.
     
     
  #120  
Old Posted Jun 23, 2015, 5:08 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
June 9th

Quote:
Originally Posted by DCRes View Post

There was some big progress on the steel over the weekend

[IMG] by , on Flickr[/IMG]

[IMG] by , on Flickr[/IMG]
Pics By DCRes


.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 8:06 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.