Quote:
Originally Posted by KevinFromTexas
I would assume the crane boom for the courthouse could swing over the rest of the block to handle the garage construction on the other half of it.
|
The drawings posted to this week's AULCC show three tower cranes. I suspect one of them will only be used at a future date for the office building construction. But both buildings are part of the site plan, so they are showing the location of all three cranes.