Melbourne's Regional Rail Link complete and now operational (timelapse video)

Melbourne's Regional Rail Link (RRL) project is now complete and operational.



http://www.regionalraillink.vic.gov.au/about/overview

In a nutshell, the RRL project was designed to provide a dedicated track pair for regional trains (they use the brand name V/Line) which operate on 160kph tracks outside Melbourne to the 4 largest cities/regions after Melbourne in Victoria.

Geelong trains - pop 200k - used to fight for track space with the Werribee Metro line all the way from the outer edge of the Melbourne Metro (at Werribee) into the main regional terminus at Southern Cross.

Likewise, Ballarat - pop 100k - and Bendigo - pop 95k - trains combined at Sunshine and fought for track space with the Sunbury/Sydenham Metro line. (Bendigo will still share some track with Sunbury/Sydenham, but not in the inner or middle ring of the city).

From today all Geelong trains leave the old alignment and skirt around the existing outer suburbs of Wyndham Vale, Tarneit and Trugganina and join the Ballarat Line and then a new dedicated track pair runs from Sunshine to North Melbourne where there is now a split of the two tracks so as Regional trains can enter/exit regional platforms on the city side and new regional platforms on the Docklands side without conflicting with the metro services which also run through Southern Cross.

It cost $3.65 billion - mainly because the inner-city part involved expensive property acquisition to fit a new track pair in the existing alignment - and the new track measures 47.5km of new double track.

Regional trains in Victoria are DMUs and the Bombardier V/Locity trains have a top speed of 160kph (100mph in the old money!) where the alignment and signalling system allows it.



^ a V/Locity leaving Footscray - that section of track looks completely different now (see video below).

The RRL effectively creates a corridor where eventually at some point the Werribee Metro line will join this new corridor and have two more dedicated tracks creating a loop through the new sprawl belt.

The new Wyndham Vale Station - that you can see in the video - is where the sprawl-belt of MElbourne currently runs up to and Tarneit (not visible in below Video) is now being developed as well.

The main benefit of this line is separation of regional and metro rail traffic and the removal of all regional services between Sunshine and the city for Ballarat (and partially Bendigo) means there's now more space for metro services, ditto for the Werribee Line.

The V/Line timetable is now in effect and these two new outer-edge suburban stations are going to have quite frequent services: 10 min in peak and 20min off peak and the journey is going to be made in under 30min from Wyndham VAle (unheard of on the Werribee metro line!).

The new metro timetable is coming toward the end of the year and I expect an increase in overall Metro frequencies (at present Sunbury/Sydenham is 20 min off peak, which is woefully inadequete, no more Regional Services to contend with = space for 10 min frequencies in off peak here's hoping).

Here's the timelapse from the start to the end of the entire project.

Video Link


Highlights from the video:

- first 4-5 min is vey much a rural setting, but eventually it'll all be suburbs over the next 20-30 years. Some interesting urban centres are eventually planned too.
- the two new stations, have been built to eventually cater for 4 tracks (see around 1 min mark).
- the speed from the Geelong corridor (start of the video) to the Ballarat line (4 min mark) is around 160kph, save for a few curves. From after the joining of the Ballarat line - you can actually see the blue speed limit sign just on the level crossing after the junction - to Sunshine it's 130kph.
- Sunshine Station, West Footscray and Footscray have all been completely rebuilt.
- Speeds from Sunshine to the city appear (not absolutely sure) to top out at 80kph.
- 7 min mark of the video is the new track layout for Footscray (compare to the image above).
- 7min mark is footscray, where the Geelong trains (Werribee Line) used to join the original 4 tracks and fight for track space with metro services into the city.
- 8 min mark is where the new RRL splits into two track pairs - one to the right which then goes on an older flyover and allows trains to use the city (left) side platforms, the video completes the journey to the new Docklands (right) side platforms at Southern Cross.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:27 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.