New sights and sounds this morning. Looks like the pile pulling is done and new shiny equipment has rolled onto site.
This morning the CASE support crane looked to be unloading rebar (left end of the picture). The rebar looked (from afar) to be both smaller hoops and longer verticals, which may be the makings of Caisson Shaft cages.
On the right side of the picture, two new CASE vehicles arrived. They look to be drill rigs. (One is on site and one is still under the Sheraton access road).
Also notice the slightly new construction trailer in the lower left hand corner. It has been there about 2 weeks, but they recently added that wood stair and platform, making it seem more permanent (or as permanent ad a temporary construction trailer can look).
I may have jumped the gun on caisson start a few weeks ago, but this looks promising!?!?