It looks like they are unwrapping the lower level taps, they have coated the steel.
Reply With Quote
     
     
  #4542  
Old Posted Feb 14, 2020, 6:22 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 1,540
Glazing of the second floor (white-tarped floor level that is starting to come down today) is slated to start approx second week of March. Vast majority of the job is a complete standstill. The formwork company is completely off site.

Only real action is at the southwest corner skywalk connection and the continuing finishing of 330. Still zero sign of Goodlife fit-up.
Reply With Quote
     
     
  #4543  
Old Posted Feb 17, 2020, 2:41 AM
DLLB DLLB is offline
Registered User
 
Join Date: Mar 2006
Location: Penticton, BC
Posts: 2,581
Quote:
Originally Posted by OTA in Winnipeg View Post
I don't know about the core but I've been watching it rising, again and again, over the last few weeks and months.
It was level months ago to the lower crease of the building behind it. It's now many floors above that and looking just fine.
Thanks
Reply With Quote
     
     
  #4544  
Old Posted Feb 17, 2020, 2:42 AM
DLLB DLLB is offline
Registered User
 
Join Date: Mar 2006
Location: Penticton, BC
Posts: 2,581
Quote:
Originally Posted by 3de14eec6a View Post
Last pour might have been August(?!) based on some of the posts in November when they pulled down the pump. The core form rose on Jan 3rd.
Thanks!
Reply With Quote
     
     
  #4545  
Old Posted Feb 17, 2020, 4:38 PM
OTA in Winnipeg's Avatar
OTA in Winnipeg OTA in Winnipeg is offline
Registered User
 
Join Date: Mar 2016
Location: Silver Heights
Posts: 1,629




Reply With Quote
     
     
  #4546  
Old Posted Feb 19, 2020, 6:17 PM
Spocket's Avatar
Spocket Spocket is offline
Back from the dead
 
Join Date: Feb 2006
Location: Edmonton
Posts: 3,508
When's the core scheduled to rise again?
__________________
Giving you a reason to drink and drive since 1975.
Reply With Quote
     
     
  #4547  
Old Posted Feb 19, 2020, 6:31 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is online now
Registered User
 
Join Date: Jan 2019
Posts: 1,540
Until you see the tower crane rise, there will be no more work on the core. At this point there is no talk about it. I’d place my bets on April.
Reply With Quote
     
     
  #4548  
Old Posted Feb 19, 2020, 8:25 PM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,029
Delays on 300 Main

Quote:
Originally Posted by WinCitySparky View Post
Until you see the tower crane rise, there will be no more work on the core. At this point there is no talk about it. I’d place my bets on April.
I wonder what the hold up is? One would think the sooner it is complete the sooner it gest cash flow from renting it out earlier than laterr?
Reply With Quote
     
     
  #4549  
Old Posted Feb 19, 2020, 8:54 PM
DancingDuck DancingDuck is online now
Registered User
 
Join Date: Jan 2013
Location: Winnipeg
Posts: 353
I swear the same question gets asked on here once a week...
Reply With Quote
     
     
  #4550  
Old Posted Feb 19, 2020, 10:55 PM
morningwood's Avatar
morningwood morningwood is offline
Registered User
 
Join Date: May 2019
Posts: 7
I wonder if Marwest is in a little over their head with this one? Sure seems like a weird way to build...
Reply With Quote
     
     
  #4551  
Old Posted Feb 19, 2020, 11:31 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,743
It seems like everything has gone relatively 'normal' speed except the tower height. 330 main looks complete on the outside. Not sure about the interior. Sounds like that's lagging. The tower structure looks to be basically done up to the current floor being worked on. Someone said glazing should start soon. Looks like the tower is ready for it. Pergolas are installed now they're made of steel.
Reply With Quote
     
     
  #4552  
Old Posted Feb 19, 2020, 11:52 PM
The Jabroni's Avatar
The Jabroni The Jabroni is offline
Go kicky fast, okay!
 
Join Date: Nov 2003
Location: Winnipeg, Donut Dominion
Posts: 2,967
I couldn't get a good look at the staging area for the steel beams and other large pieces at Warman and Lag to see if the lot there has stock waiting to be transported to site, but I guess until the appropriate pieces are in place, the tower crane won't be lifted.
__________________
Back then, I used to be indecisive.

Now, I'm not so sure.
Reply With Quote
     
     
  #4553  
Old Posted Feb 20, 2020, 12:00 AM
Labroco's Avatar
Labroco Labroco is offline
Registered User
 
Join Date: Jan 2014
Location: Toronto
Posts: 768
Quote:
Originally Posted by bomberjet View Post
It seems like everything has gone relatively 'normal' speed except the tower height. 330 main looks complete on the outside. Not sure about the interior. Sounds like that's lagging. The tower structure looks to be basically done up to the current floor being worked on. Someone said glazing should start soon. Looks like the tower is ready for it. Pergolas are installed now they're made of steel.
I must say construction appears slow...

The 40 storey +/- CIBC tower here in Toronto was started after construction began on the Main Street tower. All the excavation, construction of building core and steel skeleton / floor and all glazing has been completed and interior work is motoring along. There is no question more experienced trades have been firing on all pistons to get this done. They are obviously better capitalized and more experienced in this type of construction. The Wpg delay must be costing someone a fortune in interest as well due to trade issues and weather. I’m hopeful spring is around the corner and things will pick up. Great news for Portage & Main.
Reply With Quote
     
     
  #4554  
Old Posted Feb 21, 2020, 1:16 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is offline
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,482
__________________
Winnipeg Act II - April 2024

In The Future Every Building Will Be World-Famous For Fifteen Minutes.

Instagram
Reply With Quote
     
     
  #4555  
Old Posted Feb 21, 2020, 4:00 AM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 3,983
Quote:
Originally Posted by The Jabroni View Post
I couldn't get a good look at the staging area for the steel beams and other large pieces at Warman and Lag to see if the lot there has stock waiting to be transported to site, but I guess until the appropriate pieces are in place, the tower crane won't be lifted.
I was by there the other day and didn't really see anything there. I think that that the Able Crane that was sitting there for loading/unloading is also gone back to their yard as I don't recall seeing a boom in the air.
Reply With Quote
     
     
  #4556  
Old Posted Feb 21, 2020, 2:08 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,729
Quite a bit of steel over on the east side of the lot. They are in the curing process for the floors (hollowcore) that will allow for the crane to be tethered to the building. Once this tower crane issue is resolved the building will rise quickly.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4557  
Old Posted Feb 21, 2020, 6:07 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 455
The pergola has been going up nice and quick this week:

Reply With Quote
     
     
  #4558  
Old Posted Feb 21, 2020, 7:10 PM
EspionNoir's Avatar
EspionNoir EspionNoir is offline
Winnipeg
 
Join Date: Sep 2018
Location: Winnipeg
Posts: 635
Looks very close to the render version!
__________________
Winnipeg
Reply With Quote
     
     
  #4559  
Old Posted Feb 21, 2020, 7:54 PM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by Biff View Post
Quite a bit of steel over on the east side of the lot. They are in the curing process for the floors (hollowcore) that will allow for the crane to be tethered to the building. Once this tower crane issue is resolved the building will rise quickly.
So were the problems encountered in the SW corner the cause of the delay?
Reply With Quote
     
     
  #4560  
Old Posted Feb 21, 2020, 8:34 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,729
Apparently it was just miscalculations regarding the crane. Sounds amazing that this sort of thing could happen but.... There is nothing nefarious happening, no desire to shorten the building, no lack of interest or other conspiracy theories, just an error. Realistically it could have been corrected by connecting the crane to the building at level 9 and then at level 12 but obviously they crunched the numbers and it was cheaper to take the path that they did.

It should start rising up again soon.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:48 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.