HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 11, 2021, 5:39 AM
MAC123 MAC123 is offline
Registered User
 
Join Date: Sep 2021
Location: Deadend town, Flyover State.
Posts: 1,081
Quote:
Originally Posted by JMKeynes View Post
The NB application was approved this week, and the Zoning Diagram is now available. It's super-lame for this location. If it were on 3rd Ave and 28th St., for example, I'd be ok with it. In this location, however, it's a total waste. FXCollaborative doesn't really drop the ball, but in this instance, they committed a game-losing fumble in the end zone.

http://a810-bisweb.nyc.gov/bisweb/BS...de=ES291633271

Based on the diagram, it's looking super boring.
__________________
NYC - 20 Supertalls (including UC)
NYC - Future 2035 supertalls - 45 + not including anything that gets newly proposed between now and then (which will likely put it over 50)
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 2:56 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.