Quote:
Originally Posted by Runt
Yes. I'm just scared that i will be forced to drive over to Dunseith,ND (USDA Vet) for 2 months like in '97. The province when doing reconstruction of Hwy 75 should have raised at least one side to a safe level.
Also the bridge at PR 201 crossing the Red should have been done by now but.....
|
This hasn't happened to some degree? I'm sure I noticed a south-bound portion (reconstructed) that was raised higher, than the older north-bound portion, last spring. Albeit, I don't recall if it was a particularly long stretch of highway.