View Single Post
  #51  
Old Posted Mar 11, 2017, 5:39 PM
ejwill04 ejwill04 is offline
Registered User
 
Join Date: Nov 2010
Posts: 48
Quote:
Originally Posted by rds70 View Post
A few project updates:

- The parking lot at the site of SOVA in Capitol Hill has been closed off.
- The Colorado Association of School Boards building is being vacated to make way for Modera Capitol Hill
- Tree preservation measures are being put in place at the 7th and Grant apartments site
- Two tower crane bases have been installed at the Greystar Speer and Bannock site
- Site work looks to be starting at the Ascent Union Station site
It's really exciting to here that these projects are moving along. I was afraid the Cap Hill and Uptown ones had stalled.
Reply With Quote