View Single Post
  #8  
Old Posted Feb 17, 2014, 10:50 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,589
Quote:
Originally Posted by thebigATL View Post
But it is a part of the Connector project, and they are considering starting the same time as the beautifying bridges (phase1)
The focus of that project is beautifying the Connector not capping it. That being said, the project does include long-term plans for two parks over the connector at the Capitol and at Peachtree street as forj illustrated above.

The project that will begin this year is a remake of the Peachtree street bridge between Midtown and Brookwood.
Reply With Quote