Quote:
Originally Posted by ardecila
Extending Airtrain to Millbrae would also provide a much better link to Caltrain, which will be super important once they electrify. BART was built to do this, of course, but who wants to pay a whopping $5 just to go 1.5 miles? And the frequency on that shuttle ain't great because the other trains tie up the tracks.
|
Yes, if Caltrain goes to clock face schedules post electrification as eventually anticipated Millbrae's potential utility will rise enormously.
Quote:
Honestly it was such a poor decision to put the San Bruno BART at the mall instead of building the Caltrain transfer station there.
|
Would have been a superior option. At least the vacant lots and parking fields around Millbrae are finally getting developed.