View Single Post
  #30  
Old Posted Aug 27, 2021, 1:03 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Quote:
Originally Posted by nazrey View Post
Sarawak Metro starts tendering process for Kuching light metro trains
Sarawak Metro is responsible for implementing a two-line rubber-tyred light metro in Kuching.
Jun 9, 2021 David Briginshaw



Map showing the planned Kuching light metro network.

https://www.railjournal.com/fleet/sa...-metro-trains/
Some of the pre-engineering works have already started for our Kuching Urban Transportation System Project, and this includes the soil investigation all along the alignment for both our Samarahan Line and Serian Line.



Seen here is soil investigation work being conducted at Jalan Tun Jugah, recently.



The soil investigation work for our Kuching Urban Transportation System (KUTS) Project continues on this week along the Kuching-Serian Road, as part of the pre-engineering works that are being carried out now throughout our Samarahan Line and Serian Line alignment.

Source: https://web.facebook.com/SarawakMetroSdnBhd
Reply With Quote