View Single Post
  #470  
Old Posted Dec 13, 2014, 10:00 PM
Eidolon's Avatar
Eidolon Eidolon is offline
Registered User
 
Join Date: Jan 2012
Posts: 697
A Late Arrival, Yes, But Moynihan Station Construction Is On Track
December 4, 2014
BY RAANAN GEBERER

Quote:
Take a walk past the James A. Farley Post Office on Eighth Ave., between 31st and 33rd Sts., and you’ll see evidence that — after years of planning — the Moynihan Station project is finally under way, and poised to give Penn Station a grand new entrance.

The northern half of the front steps have been cordoned off. Two cranes are positioned near the 33rd St. side. On the building’s northeastern side, a small staircase leading to the street has been removed. On several recent visits, cement was being poured for a street-level walkway that will lead to one of the new entrances and construction workers were operating jackhammers, Caterpillar vehicles and cranes. Along Eighth Ave., the mesh barriers display renderings showing what the building will look like when the project is finished (Phase 1 Opening 2016 | esd.ny.gov/moynihan), and white mesh barriers along the length of the steps announce that the work is being done by the huge construction firm, Skanska USA.

“We’re installing a new skeleton [below street level],” one worker told this reporter. “All new steel!”





Reply With Quote