I am curious about that as well. At one time that was slated for student housing but I understand that fell through.
It will be interesting if this project moves to construction in 2016 as it will coincide with the Downtown Links construction.
|
The revised proposal has a timeline showing construction of temporary transit on the lot on Toole at Summer 2017 and construction of the North/South buildings, hotel, and permanent transit in the Fall of 2017. The Toole Warehouse/garage and bridge has a start date of Summer 2018.