View Single Post
  #5722  
Old Posted Nov 20, 2015, 7:22 PM
T'Town T'Town is offline
Registered User
 
Join Date: Oct 2015
Posts: 16
Quote:
I was reading the Steller (AZ Star) article and there were a few errors in his reporting. He had the hotel at 9 stories, and the other two buildings at 7 stories. The Peach Swaim Proposal RFP Revised Offer details the revisions:
Anyone have any idea what is planned for the north side of the tracks at the north termination of the pedestrian bridge? Looks like a parking garage for the Ronstadt Buildings, but also some retail shops along 7th St.
Reply With Quote