Thank you for the photos Keith. Looks to me like a fun way to spend some of a holiday, looking at and photographing construction.

The level in the photos with the formwork (top) is floor level 24 - minus a 13 - so actually physical floor level 23. The highest occupiable floor level is 36 (actual level 35) so yes they have 12 more floors of concrete to pour. There are two levels of mechanical penthouse and elevator equipment rooms and one more level of glass "crown" enclosing the roof. The spire is almost two hundred feet tall above that. The construction drawings call out the top of the spire at 595' above grade.