View Single Post
  #3234  
Old Posted Feb 7, 2013, 8:36 PM
JACKinBeantown's Avatar
JACKinBeantown JACKinBeantown is offline
JACKinBeantown
 
Join Date: Jun 2003
Location: Location: Location:
Posts: 8,847
Once the building reaches seven floors or so and the concrete pumps arms can't reach that high, will they lift large pouring containers with the cranes, transfer the concrete to the pump on top of the core and use that arm to pour the concrete to the floors and columns just below?
__________________
Hi.