View Single Post
  #1430  
Old Posted Jul 14, 2016, 2:53 PM
Colo Designer Colo Designer is offline
Registered User
 
Join Date: Apr 2016
Location: Colorado Springs, CO
Posts: 26
The drawings show the spire to be fabricated in five pieces and assembled on site. I can't say how they will be lifted into place.
Reply With Quote