The core was poured on Saturday, and the core form raised yesterday. I believe the floor slab was poured yesterday. On Friday, it appeared the perimeter beams were poured, and column rebar placed Saturday. Yesterday morning, the exterior climbing forms were raised, and judging by the angle of the concrete placing boom, it appeared to me, that it was the floor slab being poured. With the exterior forms having been raised, the floor slab was hidden from view. It is now getting more difficult to determine what exactly is being poured, as the building is becoming more level with the vantage point of the cameras. With continued growth, very soon, it will be increasingly difficult to determine when actual floor plates will be poured.

My updated drawing as of yesterday.



If I am correct in my observations, the current floor level is floor 46 (51 apparent floor)